JCM DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
11/22/2021
11/30/2021
12/14/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
JCM DEVELOPMENT LLC, Address:1314 SW MARKET ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $450.00 $450.00 Paid 11/30/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/30/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/30/2021
9110078-Valuation Fee New Single Family $1,055.21 $1,055.21 Paid 11/30/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 11/30/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 11/30/2021
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 07/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 12/20/2021 (9:30) 12/20/2021 12/20/2021
Misc
Corrective Action Required
12/20/2021
-INSPECTION DENIED, EROSION CONTROL REQUIRED & IN COMPLIANCE FOR INSPECTION
Erosion Control Inspection Residential Failed 12/20/2021 12/20/2021
DCM5 ESC INSP DENIED
Corrective Action Required
12/20/2021
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Footing Inspection - Residential Passed 12/21/2021 (1:00) 12/21/2021 12/21/2021
Misc
Resolved
12/21/2021
-INSPECTION DENIED, EROSION CONTROL REQUIRED & IN COMPLIANCE FOR INSPECTION
Underslab Plumbing Inspection - Residential Passed 1/31/2022 1/31/2022 01/31/2022
Erosion Control Inspection Residential Failed 1/31/2022 1/31/2022 01/31/2022
DCM5 ESC INSP DENIED
Resolved
01/31/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/31/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 2/8/2022 2/8/2022 02/08/2022
Water Service Inspection - R Passed 2/10/2022 (10:45) 2/10/2022 02/10/2022
Erosion Control Inspection Residential Failed 2/10/2022 2/10/2022 02/10/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/31/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Service Inspection - Residential Failed 6/27/2022 6/27/2022 06/27/2022
Misc
Corrective Action Required
06/27/2022
provide minimum 10psi at gas pressure gauge for inspection.
Electrical Service Inspection Passed 6/27/2022 6/27/2022 06/27/2022
All Rough Inspection - Residential Failed 6/27/2022 6/27/2022 06/27/2022
Misc
Corrective Action Required
06/27/2022
-nail pfh strapping to header -nail top plate to header at pfh per design -all anchor bolts in garage to be in the middle 1/3 of sill plate -stud packs at all gt bearing points in garage W wall and N wall -hold does for each side of double GT Truss in garage -address gt in garage not properly supported -address all truss hangers in garage missing nails -furr out in garage for b vent -stud pack for gt bearing points in bed 2 -install all truss screws though out home to plans and design (both top plates) -missing hold down for GT truss above slider -strap top plate above fireplace where lapped less than 24” -secure gas line at fire place -seal penetration for gas line at fire place -stud packs at gt bearing points bed 1 -address holes in floor joist closer than 2” above wall bar -when using Unfaced insulation as fire blocking it must be packed tightly and securely see basement throughout -solid blocking under kitchen island per plans (one joist bay past each side) -fire block bed 3 E wall into furr down in closet -seal bath 3 into bed 4 furr down -address over notched joist above bed 4 window -missing nails in hanger above sub panel -provide 2 1/2” through bolts at all beck post to beam connections
Gas Service Inspection - Residential Not Ready 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
06/27/2022
provide minimum 10psi at gas pressure gauge for inspection. 0 psi a pressure gauge Mitchell Schwarz 07/15/2022 8:14 AM
All Rough Inspection - Residential Failed 7/15/2022 7/15/2022 07/15/2022
Misc
Corrective Action Required
06/27/2022
-nail top plate to header at pfh per design -stud packs at all gt bearing points in garage W wall and N wall (stud packs to be 4 2x4 or 4 2x6 per plans) -stud pack for gt bearing points in bed 2 (missing studs) -secure gas line at fire place -seal penetration for gas line at fire place -stud packs at gt bearing points bed 1(missing studs) -address holes in floor joist closer than 2” above wall bar(not addressed) -solid blocking under kitchen island per plans (one joist bay past each side) -fire block bed 3 E wall into furr down in closet (seal gaps and penetrations) -seal bath 3 into bed 4 furr down (see near dwv) -address over notched joist above bed 4 window -provide 2 1/2” through bolts at all beck post to beam connections
All Rough Inspection - Residential Failed 7/22/2022 7/22/2022 07/22/2022
Misc
Corrective Action Required
07/15/2022
-secure gas line at fire place -seal penetration for gas line at fire place -address holes in floor joist closer than 2” above wall bar(REPAIR PER ENGINEER LETTER) **OK TO INSULATE**
All Rough Inspection - Residential Passed 7/29/2022 7/29/2022 07/29/2022
Misc
Resolved
07/29/2022
Gas Service Inspection - Residential Passed 7/29/2022 7/29/2022 07/29/2022
Misc
Resolved
07/29/2022
Driveway Inspection Partial 8/12/2022 8/12/2022 08/12/2022
Misc
Informational
08/12/2022
8-12-22 RH. Driveway is formed up and aggregate is placed and compacted.
Sidewalk Inspection Partial 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. Sidewalk was formed up and aggregate was placed and compacted.
Erosion Control Inspection Residential Passed 11/22/2022 11/22/2022 11/22/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
11/22/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Plot Plan Inspection Passed 11/22/2022 11/22/2022 11/22/2022
Occupancy Inspection - Codes Residential Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/22/2022
-driveway and sidewalk inspections toons required, contact development services to schedule -no covered deck piers inspection performed -set attic access cover at garage -spindles at basement stairs -Install outlet at master vanity -set outlets and cover plates at wet bar -splash blocks -set sewer tracer box to grade
Driveway Inspection Passed 11/29/2022 11/29/2022 11/29/2022
Misc
Informational
08/12/2022
8-12-22 RH. Driveway is formed up and aggregate is placed and compacted.
Informational
11/29/2022
it has been poured and appears to meet ada standards.
Sidewalk Inspection Passed 11/29/2022 11/29/2022 11/29/2022
Misc
Informational
08/25/2022
8-25-22 RH. Sidewalk was formed up and aggregate was placed and compacted.
Misc
Informational
11/29/2022
it has been poured and appears to meet ada standards.
Occupancy Inspection - Codes Residential Full C of O 12/14/2022 12/14/2022 12/14/2022
Misc
Resolved
12/14/2022
Documents & Images
Date Uploaded File Type Document Name
11/22/2021 CB #5 - PERMIT APPLICATION
11/23/2021 Approved Plans APPROVED TRUSS LAYOUT
11/23/2021 Approved Plans APPROVED TRUSS PACKAGE
11/23/2021 Approved Plans APPROVED PLANS
11/24/2021 Permit Codes Residential Plan Review
11/30/2021 Plot Plan APPROVED PLOT PLAN
11/30/2021 Permit Codes Residential Plan Review
11/30/2021 Permit DS Building Permit
11/30/2021 Receipt Receipt for transaction:2021-008987
12/20/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
12/21/2021 Letter INSPECTION SUMMARY
01/31/2022 Letter INSPECTION SUMMARY
01/31/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/17/2022 CB - Engineering Letter to address city inspection items
07/17/2022 Receipt Receipt for transaction:2022-005829
07/22/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
12/09/2022 CB-5 Deck Piers #2
12/09/2022 CB-5 PIERS
12/14/2022 Letter Field Certificate of Occupancy
12/14/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home