Permit Application Status

PRRES20215093


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20215093
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE. ROOF TRUSSES. STOP WORK ORDER generated on 12/13/2021 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 01/12/2022 12:00 AM by username 'Patrick Schonfeldt'.
09/29/2021
10/19/2021
04/06/2022
02/24/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 10/19/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 10/19/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 10/19/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/19/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/19/2021
9110078-Valuation Fee New Single Family $1,434.35 $1,434.35 Paid 10/19/2021
8331504-EFHB Middle Big Creek, Full $669.60 $669.60 Paid 10/19/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 02/08/2023
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 02/08/2023
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 02/08/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/08/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/12/2021 11/12/2021
Misc
Informational
11/12/2021
APPROVED PER BRADLEY HUXOL 11/9/21
Erosion Control Inspection Residential Failed 12/8/2021 12/08/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/08/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Failed 12/8/2021 12/8/2021 12/08/2021
Misc
Corrective Action Required
12/08/2021
-EROSION CONTROL MUST BE IN COMPLIANCE FOR INSPECTION -NO PREMISES IDENTIFICATION
Underslab Plumbing Inspection - Residential Not Ready 12/13/2021 12/13/2021 12/13/2021
Misc
Corrective Action Required
12/08/2021
-EROSION CONTROL MUST BE IN COMPLIANCE FOR INSPECTION -INSPECTION DENIED EROSION CONTROL STILL NOT IN COMPLAINCE Mitchell Schwarz 12/13/2021 9:33 AM
Erosion Control Inspection Residential Failed - Stop Work 12/13/2021 12/13/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/08/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 12/13/2021 9:34 AM
Underslab Plumbing Inspection - Residential Not Ready 12/15/2021 12/15/2021 12/15/2021
Misc
Corrective Action Required
12/13/2021
-EROSION CONTROL MUST BE IN COMPLIANCE FOR INSPECTION -INSPECTION DENIED EROSION CONTROL STILL NOT IN COMPLAINCE Mitchell Schwarz 12/13/2021 9:33 AM STILL NOT IN COMPLAINCE Mitchell Schwarz 12/15/2021 9:06 AM
Erosion Control Inspection Residential Not Ready 12/15/2021 12/15/2021 12/15/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/13/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 12/13/2021 9:34 AM STILL NOT COMPLAINT Mitchell Schwarz 12/15/2021 9:07 AM
Sewer Service Inspection - R Passed 1/12/2022 (10:15) 1/12/2022 01/12/2022
Water Service Inspection - R Partial 1/12/2022 1/12/2022 01/12/2022
Water Service Inspection - R Passed 1/13/2022 (10:30) 1/13/2022 01/13/2022
Erosion Control Inspection Residential Failed 1/13/2022 01/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 12/13/2021 9:34 AM STILL NOT COMPLAINT Mitchell Schwarz 12/15/2021 9:07 AM
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. Mitchell Schwarz 01/13/2022 11:24 AM
Underslab Plumbing Inspection - Residential Failed 1/20/2022 1/20/2022 01/20/2022
Misc
Corrective Action Required
12/15/2021
COMPLETE SEWER LINE CONNECTION TO STUB AT FOUNDATION, 4" CLEANOUT REQUIRED
Underslab Plumbing Inspection - Residential Passed 1/24/2022 1/24/2022 01/24/2022
Misc
Resolved
01/24/2022
COMPLETE SEWER LINE CONNECTION TO STUB AT FOUNDATION, 4" CLEANOUT REQUIRED
Erosion Control Inspection Residential Partial 1/24/2022 1/24/2022 01/24/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/24/2022
Misc
Corrective Action Required
01/24/2022
EROSION CONTROL ACCEPTACLE AT TIME OF INSPECTION
All Rough Inspection - Residential Not Ready 7/19/2022 7/19/2022 07/19/2022
Misc
Corrective Action Required
07/19/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
Electrical Service Inspection Failed 7/19/2022 7/19/2022 07/19/2022
Misc
Corrective Action Required
07/19/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
Gas Service Inspection - Residential Failed 7/19/2022 7/19/2022 07/19/2022
Misc
Corrective Action Required
07/19/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
Erosion Control Inspection Residential Failed 7/19/2022 7/19/2022 07/19/2022
Misc
Resolved
07/19/2022
EROSION CONTROL ACCEPTACLE AT TIME OF INSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/19/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 7/20/2022 7/20/2022 07/20/2022
Misc
Resolved
07/20/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
Gas Service Inspection - Residential Passed 7/20/2022 7/20/2022 07/20/2022
Misc
Resolved
07/20/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
All Rough Inspection - Residential Failed 7/20/2022 7/20/2022 07/20/2022
Misc
Resolved
07/20/2022
INSPECTION DENIED -MAINTAIN EROSION CONTROL ON LOT -NO CITY APPROVED PLANS ON SITE AT TIME OF INSPECTION
Misc
Corrective Action Required
07/20/2022
-address top plate to header connection at garage portal frame -missing lib bracing garage E wall -fire block furr and it into furr down in garage -protect NM within 6’ of attic access in garage -anchor bolts to be in the middle 1/3 of sill plate -anchor bolts to be within 12” of plate breaks and not closer than 7x the diameter of the bolt -read covered patio not framed to plans -address holes drilled in floor joist above great room for pex closer than 2” to one another -address over notched stud right of fireplace -address holes drilled for pex in floor joist above foyer and office closer than 2” from one another -missing hold downs and hangers for trusses at front patio -protect NM within 6’ of attic access 2nd floor -missing hold downs for gt truss bed 2 closet -missing stud pack for gt bearing bath 2 -missing hold down on gt truss in bed 4 -seal top plate penetration bed 1 near hvac chase -insulate behind tub walls throughout -strap top plate to code at dryer vent -properly support duct work in basement -solid block under kitchen island per plans specifications
All Rough Inspection - Residential Failed 8/8/2022 8/8/2022 08/08/2022
Misc
Corrective Action Required
07/20/2022
-covered patio provide joist hangers for rafters to ledger and H2.5 clips at lvl bearing -address holes drilled in floor joist above great room for pex closer than 2” to one another (submit engineer letter on field fix) -address holes drilled for pex in floor joist above foyer and office closer than 2” from one another (submit engineer letter for field fix) -seal top and bottom plate electrical penetration to on master bed -properly support and connect HVAC duct work in basement
All Rough Inspection - Residential Passed 8/12/2022 8/12/2022 08/12/2022
Misc
Resolved
08/12/2022
-covered patio provide joist hangers for rafters to ledger and H2.5 clips at lvl bearing -address holes drilled in floor joist above great room for pex closer than 2” to one another (submit engineer letter on field fix) -address holes drilled for pex in floor joist above foyer and office closer than 2” from one another (submit engineer letter for field fix) -seal top and bottom plate electrical penetration to on master bed -properly support and connect HVAC duct work in basement
Driveway Inspection Partial 8/15/2022 08/15/2022
Misc
Informational
08/15/2022
8.15.2022 I conducted a driveway inspection and pass the subgrade to pour concrete
Sidewalk Inspection Partial 8/18/2022 8/18/2022 08/18/2022
Misc
Informational
08/18/2022
8.18.2022 I performed a sidewalk inspection and pass the subgrade to pour concrete
Driveway Inspection Passed 8/19/2022 8/19/2022 08/25/2022
Misc
Informational
08/15/2022
8.15.2022 I conducted a driveway inspection and pass the subgrade to pour concrete 8-25-22 RH. Driveway meet LS AND ADA Specifiction.
Sidewalk Inspection Passed 8/25/2022 8/25/2022 08/25/2022
Misc
Informational
08/25/2022
8-25-22 RH. Sidewalk meets LS and ADA specification.
Piers/Caissons Inspection - Residential Passed 1/18/2023 01/18/2023
Erosion Control Inspection Residential Passed 1/18/2023 01/18/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/18/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Plot Plan Inspection Passed 1/18/2023 01/18/2023
Occupancy Inspection - Codes Residential Failed 1/18/2023 1/18/2023 01/18/2023
Misc
Corrective Action Required
01/18/2023
-pay all fees -bring water meter to grade. Maintain 14”-18” from meter top to to well lid ring -guard rail at front stoop where required by code -outlets for counter top space right and left of fireplace -attic access cover in garage -provide proper access to mechanical and electrical for spa tub in master see E4209.4 and P2720.1
Occupancy Inspection - Codes Residential Full C of O 2/24/2023 2/24/2023 02/24/2023
Misc
Resolved
02/24/2023
-pay all fees -bring water meter to grade. Maintain 14”-18” from meter top to to well lid ring -outlets for counter top space right and left of fireplace -attic access cover in garage -provide proper access to mechanical and electrical for spa tub in master see E4209.4 and P2720.1
Documents & Images
Date Uploaded File Type Document Name
09/29/2021 RR #73 - PERMIT APPLICATION
10/04/2021 Approved Plans APPROVED DRAWINGS
10/04/2021 Approved Plans APPROVED TRUSS PACKAGE
10/04/2021 Approved Plans APPROVED TRUSS LAYOUT
10/04/2021 Approved Plans APPROVED TRUSS LAYOUT
10/05/2021 Permit Codes Residential Plan Review
10/07/2021 Permit Codes Residential Plan Review
10/08/2021 Permit Codes Residential Plan Review
10/19/2021 Plot Plan APPROVED PLOT PLAN
10/19/2021 Permit Codes Residential Plan Review
10/19/2021 Permit DS Building Permit
10/19/2021 Receipt Receipt for transaction:2021-008097
11/12/2021 Footing inspection
11/12/2021 Letter INSPECTION SUMMARY
12/07/2021 73 Reserve at Stoney Creek FDTN
12/08/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter Stop Work Order
12/15/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
01/12/2022 Letter INSPECTION SUMMARY
01/12/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/10/2022 73 Reserve at Stoney Creek Letter #2
08/12/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
01/12/2023 Letter Codes 140 Day Letter
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
01/18/2023 Letter INSPECTION SUMMARY
02/08/2023 Receipt Receipt for transaction:2023-000767
02/24/2023 Letter Field Certificate of Occupancy
02/24/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home