Permit Application Status

PRRES20214745


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20214745
Building Permit - Residential
Certificate of Occupancy
PFEIFER HOMES INC
NEW SINGLE FAMILY
NEW HOUSE. COVERED DECK. WALKOUT BASEMENT. FINISHED BASEMENT. ENGINEERED FLOOR JOIST SYSTEM - DEFERRED. STOP WORK ORDER generated on 05/22/2023 12:00 AM by username 'Shawn Hoffman'. STOP WORK ORDER removed on 05/25/2023 12:00 AM by username 'Shawn Hoffman'.
09/09/2021
09/20/2021
03/14/2022
03/14/2024
Locations
Contacts
PFEIFER HOMES INC, Address:1550 SW MARKET ST STE 210, Phone:(816) 524-5245  
PFEIFER HOMES INC, Address:1550 SW MARKET ST STE 210  
Rick holbrook , Address:528 NW. AA Highway  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
tim@pfeiferhomes.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $540.00 $540.00 Paid 09/20/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 09/20/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 09/20/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/20/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/20/2021
9110078-Valuation Fee New Single Family $1,291.91 $1,291.91 Paid 09/20/2021
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/08/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/24/2021 (10:00) 9/24/2021 09/24/2021
Misc
Informational
09/24/2021
UFER LOCATED NORTH BASEMENT FOUNDATION WALL ABOUT 4' FROM FRONT OF HOUSE (3) 36 X 36 X 18 PADS FORMED UP AT DECK PIERS PLANS CALL FOR (2) J 18 X 36 & (1)K 24 X 36 36" DEEP CONCRETE PIER INTO UNDISTURBED ORIGINAL SOIL
Piers/Caissons Inspection - Residential Failed 9/24/2021 09/24/2021
Miscellaneous Correction
Corrective Action Required
09/24/2021
(3) 36 X 36 X 18 PADS FORMED UP AT DECK PIERS PLANS CALL FOR (2) J 18 X 36 & (1)K 24 X 36 36" DEEP CONCRETE PIER INTO UNDISTURBED ORIGINAL SOIL
Underslab Plumbing Inspection - Residential Passed 10/27/2021 10/27/2021 10/27/2021
Sewer Service Inspection - R Partial 11/23/2021 11/23/2021
Misc
Informational
11/23/2021
PARTIAL 23' FROM FOUNDATION TO MIDDLE OF GARAGE
Sewer Service Inspection - R Passed 11/29/2021 (11:30) 11/29/2021 11/29/2021
Misc
Informational
11/23/2021
PARTIAL 23' FROM FOUNDATION TO MIDDLE OF GARAGE
Erosion Control Inspection Residential Failed 1/21/2022 1/21/2022 01/21/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE AT FRONT OF LOT, GRAVEL FILTER, CLEAN DEBRIS FROM STREET, CLEAN DEBRIS FROM STORM INLET
Erosion Control Inspection Residential Failed 4/1/2022 04/01/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
01/21/2022
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE AT FRONT OF LOT, GRAVEL FILTER, CLEAN DEBRIS FROM STREET, CLEAN DEBRIS FROM STORM INLET
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/01/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER CLEAN STREET OF MUD & GRAVEL MAINTAIN GUTTER BUDDY
Electrical Service Inspection Passed 5/27/2022 5/27/2022 05/27/2022
Gas Service Inspection - Residential Passed 5/27/2022 5/27/2022 05/27/2022
All Rough Inspection - Residential Failed 5/27/2022 5/27/2022 05/27/2022
Miscellaneous Correction
Corrective Action Required
05/27/2022
- Block sheeting breaks garage - Nail top plate to header per PFG detail - Provide 1” clearance for B vent at garage top plate - Security blocking at door to deck 3 bays out - I beam at kitchen wall calling for 7 studs - Address rafters landing on blocks over I beam in great room - Fire block penetration floor in chase near stairs main floor - Provide 3 studs both sides under double LVL over stairs, one side missing at cripple wall and the other 2 pack not nailed together - Solid block sheet breaks office and w-I rooms - Complete ductwork master toilet - Finnish RA panning around plumbing in bedroom 3 basement multiple locations - Fire block top plate bedroom 2 shower exterior wall - Security blocking at basement door 3 bays out - Fire block fur out at top plate bedroom 4 - Fire block fur out at top plate bedroom 4 closet - Nail hangers on header at garage steps basement - Provide Egress window basement
All Rough Inspection - Residential Failed 6/6/2022 6/6/2022 06/06/2022
Miscellaneous Correction
Corrective Action Required
05/27/2022
- Address rafters landing on blocks over I beam in great room - Fire block penetration floor in chase near stairs main floor - Provide Egress window basement
All Rough Inspection - Residential Failed 6/6/2022 6/6/2022 06/06/2022
Miscellaneous Correction
Corrective Action Required
06/06/2022
OK TO INSULATE - Provide Egress window basement
Water Service Inspection - R Passed 7/1/2022 (10:30) 7/1/2022 07/01/2022
Driveway Inspection Partial 7/29/2022 7/29/2022 07/29/2022
Misc
Informational
07/29/2022
Driveway was framed up with aggregate in and compacted. 7/29/22 ES
Sidewalk Inspection Partial 7/29/2022 7/29/2022 07/29/2022
Misc
Informational
07/29/2022
Sidewalk wasn’t fully prepared, waiting for crews to remove dirt before forming/pouring. 7/29/22 ES
Driveway Inspection Passed 8/5/2022 8/5/2022 08/15/2022
Misc
Informational
07/29/2022
Driveway was framed up with aggregate in and compacted. 7/29/22 ES Driveway meets LS and Ada spec. 8/15/22 ES
Sidewalk Inspection Partial 8/5/2022 8/5/2022 08/15/2022
Misc
Informational
07/29/2022
Sidewalk wasn’t fully prepared, waiting for crews to remove dirt before forming/pouring. 7/29/22 ES Sidewalk still not framed up. 8/15/22 ES
Erosion Control Inspection Residential Failed 10/11/2022 10/11/2022 10/11/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/01/2022
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE AT FRONT OF LOT, GRAVEL FILTER, CLEAN DEBRIS FROM STREET, CLEAN DEBRIS FROM STORM INLET
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/01/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER CLEAN STREET OF MUD & GRAVEL MAINTAIN GUTTER BUDDY
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN lol COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain silt fence
Erosion Control Inspection Residential Failed 2/22/2023 02/22/2023
DCM3 ESC REQUIRED 2 DAY
Resolved
02/22/2023
1-21-22 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -MAINTAIN SILT FENCE AT FRONT OF LOT, GRAVEL FILTER, CLEAN DEBRIS FROM STREET, CLEAN DEBRIS FROM STORM INLET
DCM2 ESC DEFICIENT INSTALLATION
Resolved
02/22/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER CLEAN STREET OF MUD & GRAVEL MAINTAIN GUTTER BUDDY
DCM3 ESC REQUIRED 2 DAY
Resolved
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN lol COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Resolved
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Resolved
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Maintain silt fence
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/22/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/22/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/22/2023
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Sidewalk Inspection Failed 3/8/2023 3/8/2023 03/08/2023
Misc
Informational
08/15/2022
Sidewalk wasn’t fully prepared, waiting for crews to remove dirt before forming/pouring. 7/29/22 ES Sidewalk still not framed up. 8/15/22 ES 3-8-23 DP. Subgrade is saturated from rain all night. This will not be able to be poured until it dries up. Call back in for reinspection once dry.
Sidewalk Inspection Partial 3/14/2023 3/14/2023 03/14/2023
Misc
Informational
03/08/2023
Sidewalk wasn’t fully prepared, waiting for crews to remove dirt before forming/pouring. 7/29/22 ES Sidewalk still not framed up. 8/15/22 ES 3-8-23 DP. Subgrade is saturated from rain all night. This will not be able to be poured until it dries up. Call back in for reinspection once dry. 3-14-23 DP. SW if formed, aggregate is compacted and cross slope is in compliance but conditions can change. Approved to pour.
Sidewalk Inspection Passed 4/7/2023 4/7/2023 04/07/2023
Misc
Informational
03/14/2023
Sidewalk wasn’t fully prepared, waiting for crews to remove dirt before forming/pouring. 7/29/22 ES Sidewalk still not framed up. 8/15/22 ES 3-8-23 DP. Subgrade is saturated from rain all night. This will not be able to be poured until it dries up. Call back in for reinspection once dry. 3-14-23 DP. SW if formed, aggregate is compacted and cross slope is in compliance but conditions can change. Approved to pour 4-7-23 DP. SW was poured, cross slopes are in compliance and forms have been removed. Passed.
Driveway Inspection Failed 4/7/2023 4/7/2023 04/07/2023
Miscellaneous Correction
Corrective Action Required
04/07/2023
4-7-23 DP. When I came out to do a sidewalk inspection, my practice is to check cross slopes across the driveway as well. The entire driveway is 2.8% to 3.0% which is out of ADA compliance that maxes out at 2.0% cross slope. This Driveway approach needs to be replaced.
Driveway Inspection Passed 4/17/2023 04/18/2023
Miscellaneous Correction
Corrective Action Required
04/07/2023
4-7-23 DP. When I came out to do a sidewalk inspection, my practice is to check cross slopes across the driveway as well. The entire driveway is 2.8% to 3.0% which is out of ADA compliance that maxes out at 2.0% cross slope. This Driveway approach needs to be replaced.
Misc
Informational
04/18/2023
Came back out to inspect with differnt level and different direction. Found driveway to be compiant in all 4 area's that level was placed.
Erosion Control Inspection Residential Failed 05/17/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/22/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/17/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
02/22/2023
5/17/23 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 5/22/2023 5/22/2023 05/22/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/17/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/17/2023
5/17/23 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/22/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. STOP WORK ORDED PLACED 5/20/23
Erosion Control Inspection Residential Passed 5/25/2023 05/25/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/25/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
05/25/2023
5/17/23 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/25/2023
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. STOP WORK ORDED PLACED 5/20/23
Piers/Caissons Inspection - Residential Passed 05/26/2023
Miscellaneous Correction
Resolved
05/26/2023
(3) 36 X 36 X 18 PADS FORMED UP AT DECK PIERS PLANS CALL FOR (2) J 18 X 36 & (1)K 24 X 36 36" DEEP CONCRETE PIER INTO UNDISTURBED ORIGINAL SOIL
All Rough Inspection - Residential Passed 05/26/2023
Miscellaneous Correction
Resolved
05/26/2023
OK TO INSULATE - Provide Egress window basement
Occupancy Inspection - Codes Residential Failed 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/26/2023
-Complete final grade, sod, foundation drainage -Seal top of meter can and all exterior penetrations -Sidewalk inspection pending -Obtain lawn irrigation permit and backflow certification -Install all front door hardware -Install all security screws per code as follows: A.At least two (2) wood screws, three (3) inches in length, penetrating at least one inch into wall structure shall be used. Solid wood fillers or shims shall be used to eliminate any space between the wall structure and door frame behind each hinge. Exterior door strike plates shall be a minimum of eighteen (18) gauge metal with four (4) offset screw holes. Strike plates shall be attached to wood with not less than three (3) inch wood screws, which shall have a minimum of one inch penetration into the nearest stud. Note: For side lighted units, refer to Section 7-1408.5. -Garage door must self close and latch -Stairs to vary not more than 3/8" at garage -Install anti siphon device at hose bib on hot water heater
Occupancy Inspection - Codes Residential Ready for Temp CO 5/31/2023 5/31/2023 05/31/2023
Misc
Corrective Action Required
05/26/2023
-Complete final grade, sod, foundation drainage -Seal top of meter can and all exterior penetrations-will check after sod -Sidewalk inspection pending -Obtain lawn irrigation permit and backflow certification
Plot Plan Inspection Passed 10/13/2023 10/13/2023
Occupancy Inspection - Codes Residential Failed 10/13/2023 10/13/2023 10/13/2023
Misc
Corrective Action Required
05/31/2023
- Pay fees.
Occupancy Inspection - Codes Residential Full C of O 03/14/2024
Misc
Resolved
03/14/2024
- Pay fees.
Documents & Images
Date Uploaded File Type Document Name
09/15/2021 Approved Plans APPROVED DRAWINGS
09/15/2021 Permit Codes Residential Plan Review
09/20/2021 Plot Plan APPROVED PLOT PLAN
09/20/2021 Permit Codes Residential Plan Review
09/20/2021 Application Form APPLICATION
09/20/2021 Permit DS Building Permit
09/20/2021 Receipt Receipt for transaction: 2021-007428
09/24/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
04/01/2022 Letter INSPECTION SUMMARY
05/03/2022 130 NW Ambersham Pier Inspection Letter to City
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 130 Ambersham 06 02 22
06/06/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
02/22/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/14/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter Stop Work Order
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
10/13/2023 Letter INSPECTION SUMMARY
10/13/2023 Letter INSPECTION SUMMARY
03/01/2024 Letter Codes 140 Day Letter
03/08/2024 Certificate/License Codes Temporary Certificate of Occupancy
03/08/2024 Receipt Receipt for transaction:2024-001468
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home