Summary
PRRES20214027
Building Permit - Residential
Certificate of Occupancy
NZC HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE. COVERED DECK. FINISHED BASEMENT. STOP WORK ORDER generated on 06/09/2022 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 06/22/2022 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER generated on 09/08/2023 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 05/16/2024 12:00 AM by username 'Jeanne Nixon'.
08/03/2021
09/14/2021
02/21/2022
05/30/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZC HOMES LLC, Address:1009 INDUSTRIAL DR  
Nick Zvacek, Address:1009 Industrial Drive, Phone:(816) 325-3440  
COMFORT SYSTEMS HTG/CLG, Address:17232 BEL-RAY PL, Phone:(816) 322-1013  
Arrow Circle Electric, Address:7801 Blue Ridge Blvd , Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
JEFF.BOEHM@ZVACEKCONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 09/14/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 09/14/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 09/14/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/14/2021
9110078-Valuation Fee New Single Family $1,305.14 $1,305.14 Paid 09/14/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/14/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/20/2024
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/20/2024
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/20/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Not Ready 11/2/2021 11/02/2021
Misc
Corrective Action Required
11/02/2021
NOT READY FOR INSPECTION. RE-INSPECTION FEE ASSESSED
Underslab Plumbing Inspection - Residential Passed 11/4/2021 11/4/2021 11/04/2021
Misc
Resolved
11/04/2021
NOT READY FOR INSPECTION. RE-INSPECTION FEE ASSESSED
Footing Inspection - Residential Passed 11/04/2021
Informational
11/04/2021
FOOTING APPROVED BY ENGINEER
Sewer Service Inspection - R Passed 11/4/2021 (11:00) 11/4/2021 11/04/2021
Water Service Inspection - R Passed 11/9/2021 (8:00) 11/9/2021 11/09/2021
Piers/Caissons Inspection - Residential Passed 11/16/2021 11/16/2021
Erosion Control Inspection Residential Failed 05/02/2022
Miscellaneous Correction
Corrective Action Required
05/02/2022
5-2-22 AN stilt in roadway and storm inlet needs to be cleaned up.
Erosion Control Inspection Residential Passed 5/5/2022 5/5/2022 05/16/2022
Miscellaneous Correction
Corrective Action Required
05/02/2022
5-2-22 AN stilt in roadway and storm inlet needs to be cleaned up.
All Rough Inspection - Residential Failed 5/20/2022 5/20/2022 05/20/2022
Misc
Corrective Action Required
05/20/2022
**RESTORE EROSION CONTROL ALONG THE STREET -Nail siding to sill plates per code -Nail hanger above main floor/mud stair landing -Protect plumbing at mud closet and half bathroom -Complete return air above master bathtub -Connect ducting to all bathroom fans -Protect plumbing at master bed/toilet wall -Nail ceiling beam hanger above master bedroom -Nail ceiling beam hanger above great room -Install roof flashings for plumbing vent -Complete return air at front 2nd fl bedroom -Protect plumbing at 2nd fl bed and bathroom walls -Install stud shoe at over bored bathtub wall stud -Add another strut to support ridge above 3x beam -Nail hanger above basement stair landing -Install missing stud at basement bathroom **OK TO INSULATE
Electrical Service Inspection Passed 5/20/2022 5/20/2022 05/20/2022
Gas Service Inspection - Residential Passed 5/20/2022 5/20/2022 05/20/2022
All Rough Inspection - Residential Failed 5/27/2022 5/27/2022 05/27/2022
Misc
Corrective Action Required
05/20/2022
**RESTORE EROSION CONTROL ALONG THE STREET **5/27-INSPECTION DENIED FOR FAILURE TO CORRECT THE EROSION CONTROL -Nail siding to sill plates per code -Nail hanger above main floor/mud stair landing -Protect plumbing at mud closet and half bathroom -Complete return air above master bathtub -Connect ducting to all bathroom fans -Protect plumbing at master bed/toilet wall -Nail ceiling beam hanger above master bedroom -Nail ceiling beam hanger above great room -Install roof flashings for plumbing vent -Complete return air at front 2nd fl bedroom -Protect plumbing at 2nd fl bed and bathroom walls -Install stud shoe at over bored bathtub wall stud -Add another strut to support ridge above 3x beam -Nail hanger above basement stair landing -Install missing stud at basement bathroom **OK TO INSULATE
Erosion Control Inspection Residential Failed 6/8/2022 06/08/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL ALONG THE STREET SHALL BE RESTORED/REPAIRED. MUD AND DEBRIS SHALL BE CLEANED OFF THE STREET IMMEDIATELY. PROVIDE 6" OF 3/4" GRAVEL AT LOT ENTRANCE **EROSION CONTROL AND STREET CLEANUP SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Not Ready 6/8/2022 6/8/2022 06/08/2022
Misc
Corrective Action Required
05/27/2022
**RESTORE EROSION CONTROL ALONG THE STREET **5/27-INSPECTION DENIED FOR FAILURE TO CORRECT THE EROSION CONTROL **6/8-INSPECTION DENIED. REINSPECTION FEE ASSESSED -Nail siding to sill plates per code -Nail hanger above main floor/mud stair landing -Protect plumbing at mud closet and half bathroom -Complete return air above master bathtub -Connect ducting to all bathroom fans -Protect plumbing at master bed/toilet wall -Nail ceiling beam hanger above master bedroom -Nail ceiling beam hanger above great room -Install roof flashings for plumbing vent -Complete return air at front 2nd fl bedroom -Protect plumbing at 2nd fl bed and bathroom walls -Install stud shoe at over bored bathtub wall stud -Add another strut to support ridge above 3x beam -Nail hanger above basement stair landing -Install missing stud at basement bathroom **OK TO INSULATE
Erosion Control Inspection Residential Failed - Stop Work 6/9/2022 06/09/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/08/2022
EROSION CONTROL REQUIRED. EROSION CONTROL ALONG THE STREET SHALL BE RESTORED/REPAIRED. MUD AND DEBRIS SHALL BE CLEANED OFF THE STREET IMMEDIATELY. PROVIDE 6" OF 3/4" GRAVEL AT LOT ENTRANCE **EROSION CONTROL AND STREET CLEANUP SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Not Ready 6/9/2022 06/09/2022
Misc
Corrective Action Required
06/08/2022
**RESTORE EROSION CONTROL ALONG THE STREET **5/27-INSPECTION DENIED FOR FAILURE TO CORRECT THE EROSION CONTROL **6/8-INSPECTION DENIED. REINSPECTION FEE ASSESSED **6/9-INSPECTION DENIED. REINSPECTION FEE ASSESSED **6/9-STOP-WORK ISSUED. -Nail siding to sill plates per code -Nail hanger above main floor/mud stair landing -Protect plumbing at mud closet and half bathroom -Complete return air above master bathtub -Connect ducting to all bathroom fans -Protect plumbing at master bed/toilet wall -Nail ceiling beam hanger above master bedroom -Nail ceiling beam hanger above great room -Install roof flashings for plumbing vent -Complete return air at front 2nd fl bedroom -Protect plumbing at 2nd fl bed and bathroom walls -Install stud shoe at over bored bathtub wall stud -Add another strut to support ridge above 3x beam -Nail hanger above basement stair landing -Install missing stud at basement bathroom **OK TO INSULATE
All Rough Inspection - Residential Passed 6/22/2022 6/22/2022 06/22/2022
Misc
Resolved
06/22/2022
**RESTORE EROSION CONTROL ALONG THE STREET **5/27-INSPECTION DENIED FOR FAILURE TO CORRECT THE EROSION CONTROL **6/8-INSPECTION DENIED. REINSPECTION FEE ASSESSED **6/9-INSPECTION DENIED. REINSPECTION FEE ASSESSED **6/9-STOP-WORK ISSUED. **OK TO INSULATE
Erosion Control Inspection Residential Partial 6/22/2022 6/22/2022 06/22/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/09/2022
MAINTAIN EROSION CONTROL AND STREET THROUGHOUT CONSTRUCTION
Driveway Inspection Partial 6/23/2022 6/27/2022 06/27/2022
Misc
Informational
06/27/2022
6-27-22 AN forms are in place and aggregate is present and compacted
Sidewalk Inspection Partial 6/23/2022 6/27/2022 06/27/2022
Misc
Informational
06/27/2022
6-27-22 AN forms are in place and aggregate is present and compacted
Driveway Inspection Partial 7/1/2022 7/1/2022 07/06/2022
Misc
Informational
06/27/2022
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Sidewalk Inspection Failed 7/1/2022 4/5/2023 04/05/2023
Misc
Corrective Action Required
04/05/2023
4-5-2023 NS. Site visited and the sidewalk and driveway have dirt piles and forms will come back to do final once this is removed.
Driveway Inspection Failed 4/5/2023 04/05/2023
Misc
Informational
07/06/2022
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
04/05/2023
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed.
Erosion Control Inspection Residential Failed 04/11/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/22/2022
MAINTAIN EROSION CONTROL AND STREET THROUGHOUT CONSTRUCTION 4-11-23 site visited erosion control has failed. Storm gutter full of mud. Will need to be cleaned out. Street full of mud. Sidewalks are full of mud. Need to be cleaned ASAP. Silt fence needs to be replaced or fixed on both sides of the house. Please call me when you have a crew on there way to fix this. Nick Scott 816-977-5652
Driveway Inspection Partial 4/19/2023 04/19/2023
Misc
Informational
04/05/2023
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
04/05/2023
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed. 4-5-23 NS Site Visited and the dirt piles still have not been removed the erosion control has not been fixed and the gutter buddies has not been cleaned out.
Sidewalk Inspection Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Corrective Action Required
04/05/2023
4-5-2023 NS. Site visited and the sidewalk and driveway have dirt piles and forms will come back to do final once this is removed. 4-26-23 NS Site visited the dirt pile has been removed but the sidewalk still needs to be cleaned.
Driveway Inspection Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Informational
04/19/2023
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
04/19/2023
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed. 4-5-23 NS Site Visited and the dirt piles still have not been removed the erosion control has not been fixed and the gutter buddies has not been cleaned out. 4-26-23 NS Site Visited the gutter buddy has been cleaned out but the sidewalk still is dirty.
Sidewalk Inspection Partial 6/7/2023 6/7/2023 06/08/2023
Misc
Corrective Action Required
04/26/2023
4-5-2023 NS. Site visited and the sidewalk and driveway have dirt piles and forms will come back to do final once this is removed. 4-26-23 NS Site visited the dirt pile has been removed but the sidewalk still needs to be cleaned. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned.
Driveway Inspection Partial 6/7/2023 6/7/2023 06/08/2023
Misc
Informational
04/26/2023
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
04/26/2023
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed. 4-5-23 NS Site Visited and the dirt piles still have not been removed the erosion control has not been fixed and the gutter buddies has not been cleaned out. 4-26-23 NS Site Visited the gutter buddy has been cleaned out but the sidewalk still is dirty. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned.
Sidewalk Inspection Partial 6/29/2023 8/3/2023 08/04/2023
Misc
Corrective Action Required
06/08/2023
4-5-2023 NS. Site visited and the sidewalk and driveway have dirt piles and forms will come back to do final once this is removed. 4-26-23 NS Site visited the dirt pile has been removed but the sidewalk still needs to be cleaned. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned. 8-4-23 NS Site Visited and the sidewalk and driveway still has not been cleaned
Erosion Control Inspection Residential Failed - Stop Work 9/8/2023 09/08/2023
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/11/2023
MAINTAIN EROSION CONTROL AND STREET THROUGHOUT CONSTRUCTION 4-11-23 site visited erosion control has failed. Storm gutter full of mud. Will need to be cleaned out. Street full of mud. Sidewalks are full of mud. Need to be cleaned ASAP. Silt fence needs to be replaced or fixed on both sides of the house. Please call me when you have a crew on there way to fix this. Nick Scott 816-977-5652 9-8-23-Nothing has been done. Damaged silt fence need to be replaced and mud cleaned off sidewalk, street, and storm inlet
Erosion Control Inspection Residential Failed - Stop Work 03/18/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/13/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down, debris on sidewalk and storm inlet needs cleaned 3-18-24 Dustin A, conditions have not been resolved. STOP WORK order issued
Erosion Control Inspection Residential Failed - Stop Work 3/18/2024 3/18/2024 03/18/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
09/08/2023
MAINTAIN EROSION CONTROL AND STREET THROUGHOUT CONSTRUCTION 4-11-23 site visited erosion control has failed. Storm gutter full of mud. Will need to be cleaned out. Street full of mud. Sidewalks are full of mud. Need to be cleaned ASAP. Silt fence needs to be replaced or fixed on both sides of the house. Please call me when you have a crew on there way to fix this. Nick Scott 816-977-5652 9-8-23-Nothing has been done. Damaged silt fence need to be replaced and mud cleaned off sidewalk, street, and storm inlet
Occupancy Inspection - Codes Residential Failed 5/21/2024 5/21/2024 05/21/2024
Misc
Corrective Action Required
05/21/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city -Sidewalk and driveway not approved on record -Clean out storm inlet -Install splash blocks at downspout -Provide min 6” clearance from siding to grade -Raise AC support pad above grade -Provide sewer tracer wire port at grade -Move items away from garage wall -Stair light cannot be extrude more than 4” from wall or must be located min 6 ft 8” above stair -Provide box extension for all electrical boxes recessed more than 1/4” behind non-combustible wall finish (wet bar) -Install single plug receptacle for dump pump or provide gfci protection -Provide breaker lock for oven -Remove all metal ties from foundation wall -Screw the exterior door embedded jamb brace into studs
Driveway Inspection Partial 5/23/2024 5/23/2024 05/23/2024
Misc
Informational
06/08/2023
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
06/08/2023
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed. 4-5-23 NS Site Visited and the dirt piles still have not been removed the erosion control has not been fixed and the gutter buddies has not been cleaned out. 4-26-23 NS Site Visited the gutter buddy has been cleaned out but the sidewalk still is dirty. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned. 5-23-24 NS Site visited checked the ADA and the driveway did not pass. 2.8% and higher. Needs to be 1.5%
Misc
Informational
05/24/2024
5-24-24 Dustin A, DW is formed and compacted to city specs, Approved to pour
Sidewalk Inspection Partial 5/23/2024 5/23/2024 05/23/2024
Misc
Informational
05/23/2024
5-23-24 NS Site visited it appears sidewalk has passed besides one sidewalk panel that has been cracked. and will need to be replaced.
Sidewalk Inspection Partial 11/1/2023 5/23/2024 05/24/2024
Misc
Corrective Action Required
08/04/2023
4-5-2023 NS. Site visited and the sidewalk and driveway have dirt piles and forms will come back to do final once this is removed. 4-26-23 NS Site visited the dirt pile has been removed but the sidewalk still needs to be cleaned. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned. 8-4-23 NS Site Visited and the sidewalk and driveway still has not been cleaned 5-24-24 Dustin A, Sw has been reformed to fix previous issue, Approved to pour
Driveway Inspection Passed 5/28/2024 5/28/2024 05/28/2024
Misc
Informational
05/23/2024
6-27-22 AN forms are in place and aggregate is present and compacted (wrong address called in )
Misc
Corrective Action Required
05/23/2024
4-5-2023 NS. Site visited and dirt piles and forms are still up. I will come back and check once these are removed. 4-5-23 NS Site Visited and the dirt piles still have not been removed the erosion control has not been fixed and the gutter buddies has not been cleaned out. 4-26-23 NS Site Visited the gutter buddy has been cleaned out but the sidewalk still is dirty. 6-7-23 NS Site Visited and the sidewalk and driveway still has not been cleaned. 5-23-24 NS Site visited checked the ADA and the driveway did not pass. 2.8% and higher. Needs to be 1.5%
Misc
Informational
05/28/2024
5-28-24 Dustin A, Dw is poured to city specs.Passed
Sidewalk Inspection Passed 5/28/2024 5/28/2024 05/28/2024
Misc
Informational
05/24/2024
5-23-24 NS Site visited it appears sidewalk has passed besides one sidewalk panel that has been cracked. and will need to be replaced.
Misc
Informational
05/28/2024
5-28-24 Dustin A, SW has been poured to city specs. Passed
Erosion Control Inspection Residential Passed 05/29/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
05/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Silt fence down, debris on sidewalk and storm inlet needs cleaned 3-18-24 Dustin A, conditions have not been resolved. STOP WORK order issued
Occupancy Inspection - Codes Residential Failed 5/29/2024 05/29/2024
Misc
Corrective Action Required
05/21/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city **permit still not issued
Occupancy Inspection - Codes Residential Full C of O 5/30/2024 05/30/2024
Misc
Resolved
05/30/2024
-Obtain lawn irrigation permit and submit backflow valve test report to city **permit still not issued
Documents & Images
Date Uploaded File Type Document Name
08/03/2021 Lot 145 Residental Permit Application_1
08/03/2021 Lot 145 License_Tax_Application
08/05/2021 Permit Codes Residential Plan Review
08/09/2021 Permit Codes Residential Plan Review
08/25/2021 Permit Codes Residential Plan Review
09/01/2021 Plot Plan APPROVED PLOT PLAN
09/01/2021 Letter LETTER
09/01/2021 Permit Codes Residential Plan Review
09/14/2021 DS Building Permit
09/14/2021 Receipt Receipt for transaction: 2021-007320
09/28/2021 Approved Plans APPROVED DRAWINGS
10/13/2021 M L Crose 4721 Jamestown Dr LSMO Monticello Lot 145 3rd Party Footing Inspection Report 10-8-21
11/02/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/04/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/16/2021 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/09/2022 Letter Stop Work Order
06/09/2022 Letter Stop Work Order
06/09/2022 Stop Work Order (All Recipients) 20220609094823
06/09/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
04/05/2023 Letter INSPECTION SUMMARY
04/05/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
09/08/2023 Letter Stop Work Order
09/08/2023 Letter Stop Work Order
03/13/2024 Letter INSPECTION SUMMARY
03/13/2024 Letter INSPECTION SUMMARY
03/18/2024 Letter Stop Work Order
03/18/2024 Letter Stop Work Order
03/18/2024 Letter Stop Work Order
05/20/2024 Receipt Receipt for transaction: 2024-003692
05/21/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/23/2024 Letter INSPECTION SUMMARY
05/24/2024 Letter INSPECTION SUMMARY
05/24/2024 Letter INSPECTION SUMMARY
05/28/2024 Letter INSPECTION SUMMARY
05/28/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Letter Codes Final Certificate of Occupancy
05/30/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home