Summary
PRRES20212956
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO STOP WORK ORDER generated on 07/23/2021 12:00 AM by username 'Patrick Schonfeldt'. STOP WORK ORDER removed on 07/23/2021 12:00 AM by username 'Patrick Schonfeldt'.
06/09/2021
06/11/2021
07/29/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,183.45 $1,183.45 Paid 06/11/2021
Right of Way Permit Fee $80.00 $80.00 Paid 06/11/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/11/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 06/11/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/11/2021
Water Meter Fee $455.54 $455.54 Paid 06/11/2021
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
INSPECTION DENIED -FOOTING POURED WITHOUT INSPECTION - STOP WORK ISSUED -POST ADDRESS
Footing Inspection - Residential Failed - Stop Work 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
FOOTING POURED WITHOUT INSPECTION - SUBMIT ENGINEER REPORT THIRD PARTY INSPECTION REPORTS ARE REQUIRED TO BE UPLOADED TO PERMIT WITHIN 48 HOURS OF INSPECTION
Footing Inspection - Residential Passed 7/23/2021 7/23/2021 07/23/2021
Misc
Resolved
07/23/2021
Underslab Plumbing Inspection - Residential Passed 7/26/2021 7/26/2021 07/26/2021
Misc
Resolved
07/26/2021
Sewer Service Inspection - R Passed 10/20/2021 10/20/2021 10/20/2021
Water Service Inspection - R Partial 10/20/2021 10/20/2021 10/20/2021
Misc
Informational
10/20/2021
PARTIAL INSPECTION ON PEX TO HOUSE ENTRY
Water Service Inspection - R Passed 10/21/2021 (11:30) 10/21/2021 10/21/2021
Misc
Resolved
10/21/2021
PARTIAL INSPECTION ON PEX TO HOUSE ENTRY
Erosion Control Inspection Residential Failed 10/21/2021 10/21/2021 10/21/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/21/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 1/7/2022 1/7/2022 01/07/2022
Gas Service Inspection - Residential Not Ready 1/7/2022 1/7/2022 01/07/2022
Misc
Corrective Action Required
01/07/2022
NOT READY FOR INSPECTION INSTALL GAS LINES
All Rough Inspection - Residential Failed 1/7/2022 1/7/2022 01/07/2022
Misc
Corrective Action Required
01/07/2022
-remove all trash and debris at rear of lot -fireblock vertical to horizontal at bump outs for plumbing and HVAC at furred downs in basement -address top plate to top plate connection as required by code at East garage wall and south garage wall at front entry -fireblock garage wall at north corner -fur down at garage ceiling to allow for insulation at HVAC -protect NM within 6’ of attic access -Install protection plate at pex bottom plate bath 1st floor -Install back door -snow block at pantry -support all DWV every 48” oc, traps not considered support, see 1st floor -Fireblock chases at great room windows -complete gas line install at fireplace -fireblock between top plates at bump out fireplace -add joist hanger sgl joist to lvl connection great room -seal all top and bottom plate penetrations, see foyer,1st floor stair landing for basement, 2nd floor hall closet, bed#3 -land NM to box at wall, 1st floor front flex -CS-PF bracing per plans at front flex room wall, see detail in plans IRC R602.10.6.4 -All truss hangers per plans -all truss lateral bracing per plans -fireblock between wall studs at bath#2 and bed#2 closet, open to attic space above with ceiling height difference -snow block master bed, bed#3 -Nail off H2.5 truss clip at master bed dbl girder truss -install protection plate bottom plate pex bath#3 tub 2nd floor -fur out from tub at bath#3 2nd floor -LIB bracing per plans at bed #2 2nd floor -add joist hanger at dbl 2x10 beam at East basement stair wall, not supported by the steel beam -properly support stair landings -Install gas lines -dbl rim joist at basement egress window should be extended passed the window opening on wall in order to be able to distribute the load, install per plans or engineer letter -Set and anchor SCH 40 steel columns at basement -Address floor joist bored for sump pump discharge less than 2” from end of joist basement -address floor joist cut for HVAC above furnace -(2) 2x10 floor joist at foundation corner next to furnace per plans -nail all exterior sheathing per plans
All Rough Inspection - Residential Failed 1/21/2022 1/21/2022 01/21/2022
Misc
Corrective Action Required
01/07/2022
-remove all trash and debris at rear of lot -fireblock vertical to horizontal at bump outs for plumbing and HVAC at furred downs in basement -address top plate to top plate connection as required by code at East garage wall and south garage wall at front entry -fireblock garage wall at north corner -fur down at garage ceiling to allow for insulation at HVAC -protect NM within 6’ of attic access -Install protection plate at pex bottom plate bath 1st floor -Install back door -snow block at pantry -support all DWV every 48” oc, traps not considered support, see 1st floor -Fireblock chases at great room windows -secure gas flex line at fireplace -fireblock through floor penetration of gas line at fireplace -fireblock between top plates at bump out fireplace -add joist hanger sgl joist to lvl connection great room -seal all top and bottom plate penetrations, see foyer,1st floor stair landing for basement, 2nd floor hall closet, bed#3 -land NM to box at wall, 1st floor front flex -CS-PF bracing per plans at front flex room wall, see detail in plans IRC R602.10.6.4 -All truss hangers per plans -all truss lateral bracing per plans -fireblock between wall studs at bath#2 and bed#2 closet, open to attic space above with ceiling height difference -snow block master bed, bed#3 -Nail off H2.5 truss clip at master bed dbl girder truss -install protection plate bottom plate pex bath#3 tub 2nd floor -fur out from tub at bath#3 2nd floor -LIB bracing per plans at bed #2 2nd floor -add joist hanger at dbl 2x10 beam at East basement stair wall, not supported by the steel beam -properly support stair landings -dbl rim joist at basement egress window should be extended passed the window opening on wall in order to be able to distribute the load, install per plans or engineer letter -Set and anchor SCH 40 steel columns at basement -Address floor joist bored for sump pump discharge less than 2” from end of joist basement -address floor joist cut for HVAC above furnace -(2) 2x10 floor joist at foundation corner next to furnace per plans -nail all exterior sheathing per plans
Gas Service Inspection - Residential Passed 1/21/2022 1/21/2022 01/21/2022
Misc
Resolved
01/21/2022
All Rough Inspection - Residential Failed 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
01/21/2022
-address top plate to top plate connection as required by code at East garage wall left of DWV -protect NM within 6’ of attic access -Install protection plate at pex bottom plate bath 1st floor -secure gas flex line at fireplace -fireblock through floor penetration of gas line at fireplace -seal all top and bottom plate penetrations, see foyer,1st floor stair landing for basement, 2nd floor hall closet, bed#3 -land NM to box at wall, 1st floor front flex -all truss lateral bracing per plans -fireblock between wall studs at bath#2 and bed#2 closet, open to attic space above with ceiling height difference -install protection plate bottom plate pex bath#3 tub 2nd floor -properly support stair landings -Address floor joist bored for sump pump discharge less than 2” from end of joist basement -(2) 2x10 floor joist at foundation corner next to furnace per plans -nail all exterior sheathing per plans see cspf
Erosion Control Inspection Residential Failed 3/1/2022 03/01/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/01/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/01/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN GRAVEL FILTER
All Rough Inspection - Residential Failed 3/1/2022 3/1/2022 03/01/2022
Misc
Corrective Action Required
02/22/2022
-nail all exterior sheathing per code/plans see cspf okay to insulate
All Rough Inspection - Residential Passed 3/14/2022 3/14/2022 03/14/2022
Misc
Resolved
03/14/2022
-nail all exterior sheathing per code/plans see cspf okay to insulate
Driveway Inspection Passed 4/26/2022 4/26/2022 04/26/2022
Misc
Informational
04/26/2022
On Tuesday, 4-26-2022 I performed a driveway inspection and passed the sub-grade and forming for concrete placement.
Piers/Caissons Inspection - Residential Passed 5/31/2022 05/31/2022
Misc
Informational
05/31/2022
addressed in third party footing inspection.
Erosion Control Inspection Residential Failed 5/31/2022 05/31/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/31/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN GRAVEL FILTER
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/31/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. maintain silt fence
Occupancy Inspection - Codes Residential Failed 5/31/2022 5/31/2022 05/31/2022
Misc
Corrective Action Required
05/31/2022
-submit as graded plot plan -sod -check water meter at time of sod -guard rail required at front porch when more than 30” from ground 36” out -master toilet bath fan not working -remove tabs for smoke detectors to activate
Occupancy Inspection - Codes Residential Temporary C of O 6/27/2022 6/27/2022 06/27/2022
Misc
Corrective Action Required
05/31/2022
7/27/22 -submit as graded plot plan
Plot Plan Inspection Passed 7/14/2022 07/14/2022
Occupancy Inspection - Codes Residential Failed 7/14/2022 7/14/2022 07/14/2022
Misc
Corrective Action Required
06/27/2022
uncover man hole lid
Erosion Control Inspection Residential Passed 7/14/2022 07/14/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. maintain silt fence
Occupancy Inspection - Codes Residential Full C of O 7/29/2022 7/29/2022 07/29/2022
Misc
Resolved
07/29/2022
uncover man hole lid
Documents & Images
Date Uploaded File Type Document Name
06/09/2021 H4 #101 - PERMIT APP
06/10/2021 Approved Plans Approved Drawings
06/10/2021 Approved Plans Approved Truss Layout
06/10/2021 Approved Plans Approved Truss Package
06/11/2021 Plot Plan Approved Plot Plan
06/11/2021 Permit Codes Residential Plan Review
06/11/2021 Permit DS Building Permit
06/11/2021 Receipt Receipt for transaction:2021-004300
07/23/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter Stop Work Order
07/23/2021 Lot 101 Hawthorne Ridge footing inspection
07/23/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter INSPECTION SUMMARY
10/20/2021 Letter INSPECTION SUMMARY
10/20/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
01/07/2022 Letter INSPECTION SUMMARY
01/07/2022 Letter INSPECTION SUMMARY
01/07/2022 Letter INSPECTION SUMMARY
01/13/2022 101 hawthorne ridge field issue letter
01/21/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/28/2022 101 hawthorne ridge letter #2
03/01/2022 Letter INSPECTION SUMMARY
03/09/2022 101 hawthorne ridge letter #3
03/14/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/27/2022 Letter Codes Temporary Certificate of Occupancy
07/13/2022 Plot Plan Approved As Graded Plot Plan
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter Codes Final Certificate of Occupancy
08/02/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home