Permit Application Status

PRRES20212684


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20212684
Building Permit - Residential
Certificate of Occupancy
NLV PERGOLA PARK LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - ENG. FLOOR SYSTEM DEFERRED. STOP WORK ORDER generated on 11/11/2021 12:00 AM by username 'Michael Harkins'. STOP WORK ORDER removed on 11/11/2021 12:00 AM by username 'Michael Harkins'.
05/24/2021
06/10/2021
11/22/2021
01/08/2024
Locations
Contacts
LANDROCK SIGNATURE HOMES LLC, Address:4335 MCGEE ST, Phone:(816) 863-5588  
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
JP Roberts, Address:4335 McGee St  
JP@LANDROCKKC.COM  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $540.00 $540.00 Paid 06/10/2021
$0.00
Right of Way Permit Fee $80.00 $80.00 Paid 06/10/2021
Residential Excise Tax Fee $0.00 $0.00 Paid 05/24/2021
$1,077.12
Valuation Fee New Single Family $1,568.67 $1,568.67 Paid 06/10/2021
New Longview Road and Bridge Escrow $1,077.12 $1,077.12 Paid 06/10/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/10/2021
Water Meter Fee $455.54 $455.54 Paid 06/10/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/11/2022
Temporary Occupancy Fee $50.00 $50.00 Paid 08/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection - R Passed 9/13/2021 (9:15) 9/13/2021 09/13/2021
Underslab Plumbing Inspection - Residential Passed 9/29/2021 9/29/2021 09/29/2021
All Rough Inspection - Residential Failed 11/11/2021 11/11/2021 11/11/2021
SEC. 7-1403 PREMISES IDENTIFICATION
Corrective Action Required
11/11/2021
Approved numbers or addresses shall be provided for all new dwelling unit structures in such a position as to be plainly visible and legible from the street or road fronting the property. Each dwelling unit within a multiple dwelling unit structure shall be identified at the main entry with premises identification unique to each dwelling unit. Residential dwelling units and structures housing multiple dwelling units accessed by private drive(s) or parking lot(s) shall also provide approved numbers or addresses in such a position as to be plainly visible and legible from such drive(s) or parking lot(s). Approved numbers or address characters shall be a minimum height of 4 inches (76 mm) and minimum stroke of 0.5 inches (12.7 mm). Approved numbers or address characters shall be of a contrasting color to the background itself.
Miscellaneous Correction
Corrective Action Required
11/11/2021
INSPECTION DENIED NO FOOTING INSPECTION ON RECORD NO ADDRESS POSTED WE WILL NOT PERFORM SEPARATE PORTAL FRAME INSPECTIONS - THESE WILL BE COMPLETEDAT THE ALL ROUGH 1ST INSPECTION
Footing Inspection - Residential Failed - Stop Work 11/11/2021 11/11/2021
Miscellaneous Correction
Corrective Action Required
11/11/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR
Footing Inspection - Residential Passed 11/11/2021 11/11/2021
Miscellaneous Correction
Resolved
11/11/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR
Misc
Informational
11/11/2021
3RD PARTY FOOTING BY DEREK PEREZ AT EVERSTEAD SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED BASEMENT FOUNDATION NEAE SE (RIGHT REAR ) CORNER OF GARAGE FOUNDATION WALL
Miscellaneous Inspection Passed 3/31/2022 03/31/2022
Misc
Informational
03/31/2022
stop by address. active working on house.
Erosion Control Inspection Residential Failed 3/31/2022 03/31/2022
Miscellaneous Correction
Corrective Action Required
03/31/2022
maintain erosion control provide a gravel filter.
Electrical Service Inspection Passed 4/11/2022 4/11/2022 04/11/2022
Gas Service Inspection - Residential Not Ready 4/11/2022 4/11/2022 04/11/2022
Miscellaneous Correction
Corrective Action Required
04/11/2022
Not ready, no pipe installed
Erosion Control Inspection Residential Failed 4/11/2022 04/11/2022
Miscellaneous Correction
Corrective Action Required
03/31/2022
maintain erosion control Restore gravel filter. Clean storm inlet Remove debris from street
All Rough Inspection - Residential Failed 4/11/2022 4/11/2022 04/11/2022
SEC. 7-1403 PREMISES IDENTIFICATION
Resolved
04/11/2022
Approved numbers or addresses shall be provided for all new dwelling unit structures in such a position as to be plainly visible and legible from the street or road fronting the property. Each dwelling unit within a multiple dwelling unit structure shall be identified at the main entry with premises identification unique to each dwelling unit. Residential dwelling units and structures housing multiple dwelling units accessed by private drive(s) or parking lot(s) shall also provide approved numbers or addresses in such a position as to be plainly visible and legible from such drive(s) or parking lot(s). Approved numbers or address characters shall be a minimum height of 4 inches (76 mm) and minimum stroke of 0.5 inches (12.7 mm). Approved numbers or address characters shall be of a contrasting color to the background itself.
Miscellaneous Correction
Corrective Action Required
11/11/2021
- submit changes to for approval and upload revision to account for bedroom 4, and under front porch and any additional changes - - support ridge in mud room - Complete DWV first floor closet - Finish ductwork first floor bathroom - Seal penetrations in floor hvac chase at master bedroom - Provide steel columns per plan - Provide anchor bolts basement - No gas line, furnace incomplete - Strap top plate at 2x6 to 2x4 transition under double lvl second floor stairs - Address no top plate at small window above stairs - Provide rafter ties in bedroom 4 - Fire block chase at top plate behind tub bedroom 4 - Complete plumbing for toilet at bedroom 4 - Bedroom 4 has 8’ ceiling on plan submit changes - Bvent for fire place does not exit attic space - Nail corners to code through out - Support 2x10 lvls over garage dormer - Complete bathroom vent in studio - Plumbing for studio bathroom not complete - Provide I- joist packet
Gas Service Inspection - Residential Passed 4/21/2022 4/21/2022 04/21/2022
Miscellaneous Correction
Resolved
04/21/2022
All Rough Inspection - Residential Failed 4/21/2022 4/21/2022 04/21/2022
Miscellaneous Correction
Corrective Action Required
04/11/2022
- submit changes to for approval and upload revision to account for bedroom 4, and under front porch and any additional changes - - Strap top plate at 2x6 to 2x4 transition under double lvl second floor stairs - Address no top plate at small window above stairs - Provide rafter ties in bedroom 4 - Fire block chase at top plate behind tub bedroom 4 - Bedroom 4 has 8’ ceiling on plan submit changes - Bvent for fire place does not exit attic space - Support 2x10 lvls over garage dormer - Complete bathroom vent in studio - Plumbing for studio bathroom not complete - Provide I- joist packet 4/21/22 Framers working \ corrections not complete \ reschedule when ready
All Rough Inspection - Residential Failed 4/22/2022 4/22/2022 04/22/2022
Miscellaneous Correction
Corrective Action Required
04/21/2022
- submit changes to for approval and upload revision to account for bedroom 4, and under front porch and any additional changes - - Strap top plate at 2x6 to 2x4 transition under double lvl second floor stairs - Address no top plate at small window above stairs - Bedroom 4 has 8’ ceiling on plan submit changes - Bvent for fire place does not exit attic space - Support 2x10 lvls over garage dormer - Complete bathroom roof vent boot in studio - Provide I- joist packet Leave inspection items accessible OK to insulate
Erosion Control Inspection Residential Failed 5/2/2022 05/02/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/11/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Restore gravel filter. Clean storm inlet Remove debris from street
All Rough Inspection - Residential Failed 5/2/2022 5/2/2022 05/02/2022
Miscellaneous Correction
Corrective Action Required
04/22/2022
-Strap top plate at 2x6 to 2x4 transition under double lvl second floor stairs No further inspections until erosion control is in compliance
All Rough Inspection - Residential Passed 5/4/2022 05/04/2022
Miscellaneous Correction
Resolved
05/04/2022
Erosion Control Inspection Residential Failed 5/4/2022 05/04/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/02/2022
EROSION CONTROL REQUIRED. Restore gravel filter. Clean storm inlet
Driveway Inspection Partial 5/23/2022 5/23/2022 05/23/2022
Misc
Informational
05/23/2022
Driveway was framed up with aggregate in and compacted. 5/23/22 ES
Sidewalk Inspection Partial 5/23/2022 (3:00) 5/23/2022 05/24/2022
Misc
Informational
05/24/2022
Sidewalk was framed up with aggregate in place. 5/23/22 ES
Driveway Inspection Passed 5/27/2022 5/27/2022 05/27/2022
Misc
Informational
05/23/2022
Driveway was framed up with aggregate in and compacted. 5/23/22 ES Driveway meets LS and ADA specs. 5/27/22 ES
Sidewalk Inspection Partial 5/27/2022 5/27/2022 05/27/2022
Misc
Informational
05/27/2022
Sidewalk on Pergola park side of house was framed up with aggregate in and compacted. 5/23/22 ES
Sidewalk Inspection Partial 05/27/2022
Misc
Informational
05/27/2022
Sidewalk on Pergola park side of house was framed up with aggregate in and compacted. 5/23/22 ES Sidewalk on Pergola park side meets LS and ADA spec. Sidewalk on both sides of driveway will still need to be inspected when ready. 5/27/22 ES
Sidewalk Inspection Partial 7/20/2022 7/20/2022 07/20/2022
Misc
Informational
05/27/2022
Sidewalk on Pergola park side of house was framed up with aggregate in and compacted. 5/23/22 ES Sidewalk on Pergola park side meets LS and ADA spec. Sidewalk on both sides of driveway will still need to be inspected when ready. 5/27/22 ES Sidewalk on west side of house was framed up with aggregate in and compacted. 7/20/22 ES
Sidewalk Inspection Passed 7/29/2022 7/29/2022 07/29/2022
Misc
Informational
07/20/2022
Sidewalk on Pergola park side of house was framed up with aggregate in and compacted. 5/23/22 ES Sidewalk on Pergola park side meets LS and ADA spec. Sidewalk on both sides of driveway will still need to be inspected when ready. 5/27/22 ES Sidewalk on west side of house was framed up with aggregate in and compacted. 7/20/22 ES Sidewalk meets LS and ADA spec. 7/29/22 ES
Occupancy Inspection - Codes Residential Failed 8/10/2022 8/10/2022 08/10/2022
Miscellaneous Correction
Corrective Action Required
08/10/2022
pay fee’s Final grading and sod Obtain irrigation permit and submit back flow Handrail at 4 side fron patio Secondary lock on front door Post address in contrasting colors and illuminated Spark rings needed at kitchen counter outlets Complete handrail on stairs to loft Complete hardware on garage and side entry One outlet in pantry not tripping gfci Outlets and covers in kitchen incomplete Handrail basement stairs unfinished Range vent
Occupancy Inspection - Codes Residential Failed 8/12/2022 8/12/2022 08/12/2022
Miscellaneous Correction
Corrective Action Required
08/10/2022
- Final grading and sod - Obtain irrigation permit and submit back flow - Handrail at 4 side fron patio **New, no sewer service inspection found. **
Sewer Service Inspection - R Passed 08/15/2022
Misc
Informational
08/15/2022
NO CITY INSPECTION DONE, LETTER SUBMITTED FROM PLUMBER ON DATE ON INSTALATION.
Occupancy Inspection - Codes Residential Ready for Temp CO 8/15/2022 8/15/2022 08/15/2022
Miscellaneous Correction
Corrective Action Required
08/12/2022
- Obtain irrigation permit and submit back flow TofO expiration 9/30/22
Erosion Control Inspection Residential Failed 8/15/2022 08/15/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
05/04/2022
EROSION CONTROL REQUIRED. Maintain erosion control until sod is complete
Erosion Control Inspection Residential Failed 08/19/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/15/2022
- CLEAN STORM INLET BOX.
Plot Plan Inspection Passed 08/19/2022
Occupancy Inspection - Codes Residential Failed 8/19/2022 8/19/2022 08/19/2022
Miscellaneous Correction
Corrective Action Required
08/15/2022
- Obtain irrigation permit and submit back flow CHECKED 8/19/22 permit incomplete. verifing contractor. TofO expiration 9/30/22
Erosion Control Inspection Residential Passed 1/8/2024 01/08/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
01/08/2024
- CLEAN STORM INLET BOX.
Sidewalk Inspection Passed 1/8/2024 01/08/2024
Misc
Informational
01/08/2024
1-8-24 Dustin A, Sw is poured and slopes ae in compliance, passed
Occupancy Inspection - Codes Residential Full C of O 1/8/2024 01/08/2024
Miscellaneous Correction
Corrective Action Required
08/19/2022
- Obtain irrigation permit and submit back flow CHECKED 8/19/22 permit incomplete. verifing contractor. TofO expiration 9/30/22
Documents & Images
Date Uploaded File Type Document Name
05/24/2021 3206 SW Pergola Park Dr_ Permit Application
05/24/2021 3206 SW Pergola Park Dr_ Excise Tax Application
05/26/2021 Permit Codes Residential Plan Review
06/01/2021 Plot Plan APPROVED PLOT PLAN
06/07/2021 Approved Plans APPROVED PLANS
06/08/2021 Permit Codes Residential Plan Review
06/10/2021 Permit DS Building Permit
06/10/2021 Receipt Receipt for transaction:2021-004276
09/13/2021 Letter INSPECTION SUMMARY
09/29/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter INSPECTION SUMMARY
11/11/2021 Letter Stop Work Order
11/11/2021 Stop work order.jpeg
11/11/2021 82 Pergola Park-FTNG
11/11/2021 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
03/31/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/22/2022 Approved Plans APPROVED JOIST DRAWINGS
04/22/2022 Letter INSPECTION SUMMARY
04/25/2022 3206 SW Pergola Park Rough in Inspection
05/02/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/29/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/11/2022 Receipt Receipt for transaction:2022-006607
08/12/2022 Letter INSPECTION SUMMARY
08/13/2022 Lot 82 Sewer Inspection
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Receipt Receipt for transaction:2022-006676
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
01/06/2023 Letter Codes 140 Day Letter
02/15/2023 Letter Codes 180 Day Letter
01/08/2024 Letter INSPECTION SUMMARY
01/08/2024 Letter INSPECTION SUMMARY
01/08/2024 Letter Codes Final Certificate of Occupancy
01/08/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home