Summary
PRRES20212634
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
05/20/2021
05/21/2021
07/15/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
LOREN@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $972.98 $972.98 Paid 05/21/2021
Right of Way Permit Fee $80.00 $80.00 Paid 05/21/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/21/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 05/21/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 05/21/2021
Water Meter Fee $455.54 $455.54 Paid 05/21/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/30/2021 7/30/2021 07/30/2021
Misc
Informational
07/30/2021
APPROVED PER BRADLEY HUXOL 7/6/21
Underslab Plumbing Inspection - Residential Passed 8/24/2021 8/24/2021 08/24/2021
Sewer Service Inspection - R Passed 8/25/2021 (1:00) 8/25/2021 08/25/2021
Water Service Inspection - R Passed 8/27/2021 (9:45) 8/27/2021 08/27/2021
Erosion Control Inspection Residential Failed 8/27/2021 8/27/2021 08/27/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/27/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Service Inspection - Residential Passed 3/3/2022 3/3/2022 03/03/2022
Erosion Control Inspection Residential Failed 3/3/2022 03/03/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/03/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/03/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. ADDRESS EROSION CONTROL AT BACK OF LOT
Electrical Service Inspection Passed 3/3/2022 3/3/2022 03/03/2022
All Rough Inspection - Residential Failed 3/3/2022 3/3/2022 03/03/2022
Misc
Corrective Action Required
03/03/2022
Maintain gravel filter before further inspections -all truss hangers per plans -install rear sliding door -All anchor bolts to be in the middle 1/3 of sill plate -block under entry closet -lib per plans see owners entry and bed 3 -hold downs at gt truss above laundry -fire block stud bay with dwv to garage soffit area -nail all intersecting wall corners 12” OC -secure gas line behind fire place -h2.5 on truss SW corner kitchen -strap top plate bed 2 closet where top plates lapped less than 24” -anchor all steel columns in basement -address joist notched above steel beam in basement
Erosion Control Inspection Residential Failed 3/17/2022 03/17/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/03/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. ADDRESS EROSION CONTROL AT BACK OF LOT erosion control at back of lot still not present Mitchell Schwarz 03/17/2022 9:33 AM
All Rough Inspection - Residential Failed 3/17/2022 3/17/2022 03/17/2022
Misc
Corrective Action Required
03/03/2022
-inspection denied no erosion control at back of lot Mitchell Schwarz 03/17/2022 9:34 AM -Maintain gravel filter before further inspections -all truss hangers per plans -install rear sliding door -All anchor bolts to be in the middle 1/3 of sill plate -block under entry closet -lib per plans see owners entry and bed 3 -hold downs at gt truss above laundry -fire block stud bay with dwv to garage soffit area -nail all intersecting wall corners 12” OC -secure gas line behind fire place -h2.5 on truss SW corner kitchen -strap top plate bed 2 closet where top plates lapped less than 24” -anchor all steel columns in basement -address joist notched above steel beam in basement
All Rough Inspection - Residential Failed 3/24/2022 3/24/2022 03/24/2022
Misc
Corrective Action Required
03/17/2022
-Maintain gravel filter before further inspections -hold downs at gt truss above laundry -anchor all steel columns in basement -address joist notched above steel beam in basement
All Rough Inspection - Residential Failed 3/28/2022 3/28/2022 03/28/2022
Misc
Corrective Action Required
03/24/2022
Inspection denied address gravel filter Mitchell Schwarz 03/28/2022 10:08 AM -Maintain gravel filter before further inspections -hold downs at gt truss above laundry -anchor all steel columns in basement -address joist notched above steel beam in basement
Erosion Control Inspection Residential Failed 3/28/2022 03/28/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
03/28/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. ADDRESS EROSION CONTROL AT BACK OF LOT erosion control at back of lot still not present Mitchell Schwarz 03/17/2022 9:33 AM
DCM5 ESC INSP DENIED
Corrective Action Required
03/28/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. address gravel filter
Erosion Control Inspection Residential Failed 3/30/2022 03/30/2022
DCM5 ESC INSP DENIED
Resolved
03/30/2022
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION. address gravel filter
Misc
Corrective Action Required
03/30/2022
GRAVEL FILTER BACK IN COMPLIANCE Mitchell Schwarz 03/30/2022 8:52 AM
Misc
Corrective Action Required
03/30/2022
clean gravel from street/curb address erosion control straw wattle not working effectivly
All Rough Inspection - Residential Failed 3/30/2022 3/30/2022 03/30/2022
Misc
Corrective Action Required
03/28/2022
-address joist notched above steel beam in basement( FIX TO ENGINEER SPECIFICATIONS SEE NAILING PATTERN)
All Rough Inspection - Residential Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Resolved
04/08/2022
-address joist notched above steel beam in basement( FIX TO ENGINEER SPECIFICATIONS SEE NAILING PATTERN)
Piers/Caissons Inspection - Residential Passed 4/14/2022 (1:00) 4/14/2022 04/14/2022
Driveway Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/15/2022
Driveway was framed up with aggregate in and compacted. 4/15/22 ES
Driveway Inspection Passed 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/15/2022
Driveway was framed up with aggregate in and compacted. 4/15/22 ES
Misc
Informational
04/22/2022
Driveway meets LS specs. 4/22/22 ES
Occupancy Inspection - Codes Residential Failed 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/13/2022
-final grade and sod -check water meter at time of final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -seal all exterior penetrations top of meter, a/c disconnect, lights, etc. -obtain lawn irrigation permit -handrail and guard rail at front stoop -address to be properly illuminated
Misc
Corrective Action Required
06/13/2022
-final grade and sod -check water meter at time of final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -seal all exterior penetrations top of meter, a/c disconnect, lights, etc. -obtain lawn irrigation permit -handrail and guard rail at front stoop -address to be properly illuminated
Misc
Corrective Action Required
06/13/2022
-final grade and sod -check water meter at time of final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -seal all exterior penetrations top of meter, a/c disconnect, lights, etc. -obtain lawn irrigation permit -handrail and guard rail at front stoop -address to be properly illuminated -set screw for water anti syphon device installed and sheared off
Plot Plan Inspection Passed 7/15/2022 07/15/2022
Erosion Control Inspection Residential Passed 7/15/2022 07/15/2022
Misc
Resolved
07/15/2022
GRAVEL FILTER BACK IN COMPLIANCE Mitchell Schwarz 03/30/2022 8:52 AM
Misc
Resolved
07/15/2022
clean gravel from street/curb address erosion control straw wattle not working effectivly
Occupancy Inspection - Codes Residential Full C of O 7/15/2022 7/15/2022 07/15/2022
Misc
Resolved
07/15/2022
-final grade and sod -check water meter at time of final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -seal all exterior penetrations top of meter, a/c disconnect, lights, etc. -obtain lawn irrigation permit -handrail and guard rail at front stoop -address to be properly illuminated
Misc
Resolved
07/15/2022
-final grade and sod -check water meter at time of final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -seal all exterior penetrations top of meter, a/c disconnect, lights, etc. -obtain lawn irrigation permit -handrail and guard rail at front stoop -address to be properly illuminated
Documents & Images
Date Uploaded File Type Document Name
05/20/2021 H4 #110 - PERMIT APPLICATION
05/21/2021 Approved Plans Approved Drawings
05/21/2021 Approved Plans Approved Truss Layout
05/21/2021 Approved Plans Approved Truss Package
05/21/2021 Permit Codes Residential Plan Review
05/21/2021 Permit DS Building Permit
05/21/2021 Receipt Receipt for transaction:2021-003369
05/21/2021 Plot Plan Approved Plot Plan
07/30/2021 Lot 110 Hawthorne Ridge Footing Inspection
07/30/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
02/23/2022 Letter Codes 180 Day Letter
03/03/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/09/2022 110 Hawthrone Ridge Field Issue
03/17/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
03/30/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter Codes Final Certificate of Occupancy
07/15/2022 Letter Field Certificate of Occupancy
07/15/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home