Summary
PRRES20211858
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
04/19/2021
04/19/2021
03/22/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JOSH@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/21/2021 04/19/2021
Kim Brennan
Residential Plan Review Approved 04/21/2021 04/19/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,073.80 $1,073.80 Paid 04/19/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/19/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/19/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 04/19/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/19/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/19/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/18/2021 (1:45) 5/18/2021 05/18/2021
Misc
Informational
05/18/2021
UFER LOCATED CENTER OF REAR GARAGE FOUNDATION WALL
Underslab Plumbing Inspection - Residential Passed 6/18/2021 6/17/2021 06/17/2021
Sewer Service Inspection - R Passed 8/5/2021 (1:15) 8/5/2021 08/05/2021
Water Service Inspection - R Passed 8/9/2021 08/09/2021
All Rough Inspection - Residential Failed 9/8/2021 9/8/2021 09/08/2021
Miscellaneous Correction
Corrective Action Required
09/08/2021
: PFH PORTAL FRAME ONLY : - 5/8 ANCHOR BOLTS SHALL BE IN MIDDLE 1/3 THE WIDTH OF PLATE - CHECK ABOVE ON ALL ROUGH OK TO COVER EXTERIOR AT PFH PORTAL
Driveway Inspection Partial 10/4/2021 10/04/2021
Misc
Informational
10/04/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Passed 10/8/2021 10/8/2021 10/08/2021
Misc
Informational
10/04/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
10/08/2021
Driveway looks good and has expansion joints at curb and right of way 10-8-21 AN
Electrical Service Inspection Passed 12/7/2021 12/7/2021 12/07/2021
Gas Service Inspection - Residential Passed 12/7/2021 12/7/2021 12/07/2021
All Rough Inspection - Residential Failed 12/7/2021 12/7/2021 12/07/2021
Miscellaneous Correction
Corrective Action Required
09/08/2021
: PFH PORTAL FRAME ONLY : - 5/8 ANCHOR BOLTS SHALL BE IN MIDDLE 1/3 THE WIDTH OF PLATE - CHECK ABOVE ON ALL ROUGH OK TO COVER EXTERIOR AT PFH PORTAL
Miscellaneous Correction
Corrective Action Required
12/07/2021
Seal fire blocking dead space at entry closet Provide fire blocking landing at entry NW corner Seal Nm conductors in plenums kitchen Seal upward penetration at HVAC chase mud room near joist hanger Seal fire blocking above refrigerator Provide 3 studs under triple LVL garage behind range Fire block radon furr out rear garage wall 5/8 anchor bolts at PFH portal frame shall land in middle 1/3 the width of plate Anchor bolts garage shall land in middle 1/3 the width of plate Provide anchor bolt end of plate garage near entry closet Address cut joist pantry Seal fire blocking chases great room Seal fire blocking above fireplace Seal top plate penetration bed 1 closet Strap top plate bed 1 closet Nail stud shoe master vanity Provide boca plate laundry room Nail exterior wall sheathing per code
All Rough Inspection - Residential Passed 12/14/2021 12/14/2021 12/14/2021
Miscellaneous Correction
Resolved
12/14/2021
: PFH PORTAL FRAME ONLY : OK TO COVER EXTERIOR AT PFH PORTAL
Miscellaneous Correction
Resolved
12/14/2021
Plot Plan Inspection Passed 2/24/2022 02/24/2022
Erosion Control Inspection Residential Passed 2/24/2022 02/24/2022
Piers/Caissons Inspection - Residential Passed 2/24/2022 02/24/2022
Misc
Resolved
02/24/2022
Third party inspection
Occupancy Inspection - Codes Residential Failed 2/24/2022 2/24/2022 02/24/2022
Miscellaneous Correction
Corrective Action Required
02/24/2022
- Provide outlet covers for kitchen counters - Cover missing at refrigerator - Secondary lock required on back door - Garage entry door must self close and latch - Outlet cover missing back bedroom near laundry - Provide handrail to basement - Insulate cantilever basement left of service panel - Correct unfinished stairs to basement to code - Sump discharge 36” from foundation - Seal all exterior penetrations - Seal A/C disconnect - Seal Meter can
Occupancy Inspection - Codes Residential Full C of O 3/22/2022 3/22/2022 03/22/2022
Miscellaneous Correction
Resolved
03/22/2022
Documents & Images
Date Uploaded File Type Document Name
04/19/2021 Application Form Permit Application and License Tax Form
04/19/2021 Approved Plans Approved Drawings
04/19/2021 Approved Plans Approved Truss Layout
04/19/2021 Approved Plans Approved Truss Package
04/19/2021 Receipt Receipt for transaction:2021-002058
04/19/2021 Letter DS Building Permit
04/20/2021 Plot Plan Approved Plot Plan
05/18/2021 Letter INSPECTION SUMMARY
05/19/2021 Lot 64 Woodside Ridge Footing inspection
06/17/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
08/09/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
10/04/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter Codes Final Certificate of Occupancy
03/22/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home