PRRES20211762
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
04/13/2021
04/21/2021
10/11/2021
06/14/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
DIAMOND PLUMBING LLC, Address:683 NW Z HWY, Phone:(816) 786-7223  
ROBERT@SABHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/22/2021 04/20/2021
Kim Brennan
Deck location
Corrective Action Required
04/20/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show this as a covered deck
As-graded plot plan
Corrective Action Required
04/20/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 04/22/2021 04/20/2021
Kim Brennan
Plot Plan Review Rejected 04/16/2021 04/14/2021
Kim Brennan
Deck location
Corrective Action Required
04/14/2021

Deck location, with dimensions to property lines must be provided on the plot plan. Please show this as a covered deck
As-graded plot plan
Corrective Action Required
04/14/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 04/16/2021 04/14/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $987.07 $987.07 Paid 04/21/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/21/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/21/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 04/21/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/21/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/21/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 7/9/2021 7/9/2021 07/09/2021
Sewer Service Inspection - R Passed 7/12/2021 (8:45) 7/12/2021 07/12/2021
Water Service Inspection - R Passed 7/13/2021 (1:15) 7/13/2021 07/13/2021
Piers/Caissons Inspection - Residential Passed 7/14/2021 (9:45) 7/14/2021 07/14/2021
All Rough Inspection - Residential Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-Install ceiling beam hanger above foyer -Nail king stud to master bedroom window header -Move smoke alarm outside master bedroom higher -Nail ceiling beam hanger above rear dining corner -Anchor sill plate within 12” of break at stair; at rear corner of basement family room; at rear basement bedroom -Provide min 12” horizontal clearance from light to basement closet storage space **OK TO INSULATE
Gas Service Inspection - Residential Passed 1/18/2022 1/18/2022 01/18/2022
Electrical Service Inspection Failed 1/18/2022 1/18/2022 01/18/2022
Misc
Corrective Action Required
01/18/2022
-Remove the top cover screws. I’m not blessed with height
Electrical Service Inspection Passed 1/24/2022 1/24/2022 01/24/2022
Misc
Resolved
01/24/2022
-Remove the top cover screws. I’m not blessed with height
All Rough Inspection - Residential Failed 1/24/2022 1/24/2022 01/24/2022
Misc
Corrective Action Required
01/18/2022
-Move smoke alarm outside master bedroom higher **Provide smoke alarm installation doc -Provide min 12” horizontal clearance from light to basement closet storage space **Min 12” horizontal clearance is required for surface-mounted LED luminaire. Storage space is defined as a space on the left&right and rear sides of closet, 12” out from walls extending from floor to ceiling and 24” from wall from floor to clothes hanger height.
Erosion Control Inspection Residential Failed 1/28/2022 1/28/2022 01/28/2022
Misc
Corrective Action Required
01/28/2022
-Re establish silt fence, gravel filter and clean storm inlet and street
All Rough Inspection - Residential Passed 1/28/2022 1/28/2022 01/28/2022
Misc
Resolved
01/28/2022
-Move smoke alarm outside master bedroom higher **Provide smoke alarm installation doc -Provide min 12” horizontal clearance from light to basement closet storage space **Min 12” horizontal clearance is required for surface-mounted LED luminaire. Storage space is defined as a space on the left&right and rear sides of closet, 12” out from walls extending from floor to ceiling and 24” from wall from floor to clothes hanger height.
Driveway Inspection Partial 4/6/2022 4/6/2022 04/06/2022
Misc
Informational
04/06/2022
4-6-22 AN forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Passed 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/06/2022
4-6-22 AN forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
04/08/2022
4-8-22 AN driveway looks good and has expansion joints at curb and right of way. Meets ADA spec
Footing Inspection - Residential Passed 04/11/2022
Informational
04/11/2022
FOOTING APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 5/17/2022 5/17/2022 05/17/2022
Misc
Corrective Action Required
05/17/2022
**RESTORE EROSION CONTROL ALONG THE STREET. CLEAN MUD/DEBRIS OFF STREET AND STORM INLET. PROTECT THE REAR STORM INLET -Provide guardrail at front edge of stoop where more than 30” above grade, as measured 36” horizontal from edge down to grade -As-graded plot plan is required prior to sodding -Final grade, sod, downspout and sump pump extension -Remove filter around rear storm inlet after sodding -Provide sewer tracer wire port at grade -Deck: provide 2 lags at each end of ledger board (4 ends); ledger screws must go through spacers; support outer joists with proper device; provide two 1/2” through bolts at deck beam-post connections -Provide receptacle at fireplace countertop wall space as required per NEC 210.52 -Install secondary locks for slide doors per security code -Support water expansion tank per manufacturer -Install backflow preventer at hose bibb -Provide combustion air openings per code
Occupancy Inspection - Codes Residential Failed 6/3/2022 6/3/2022 06/03/2022
Misc
Corrective Action Required
05/17/2022
-Provide guardrail at front edge of stoop where more than 30” above grade, as measured 36” horizontal from edge down to grade -As-graded plot plan is required prior to sodding -Final grade, sod, downspout and sump pump extension -Remove filter around rear storm inlet after sodding. Protect rear storm inlet -Provide sewer tracer wire port at grade -Deck: provide 2 lags at each end of ledger board (4 ends); ledger screws must go through spacers; support outer joists with proper device; provide two 1/2” through bolts at deck beam-post connections -Support water expansion tank per manufacturer **I downloaded the manual from Amtrol. It’s required that the tank be supported vertically. -Install backflow preventer at hose bibb -Provide combustion air openings per code
Plot Plan Inspection Passed 6/7/2022 06/07/2022
Occupancy Inspection - Codes Residential Failed 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/03/2022
-Provide combustion air openings per code **Not done. The space is not min 50 cubic ft per 1K btu of gas thermal input (furnace+water heater); therefore, combustion air openings are required. The submitted combustible air opening calculation letter requires 160 sq inches for each opening.
Occupancy Inspection - Codes Residential Full C of O 6/14/2022 6/14/2022 06/14/2022
Misc
Resolved
06/14/2022
-Provide combustion air openings per code **Not done. The space is not min 50 cubic ft per 1K btu of gas thermal input (furnace+water heater); therefore, combustion air openings are required. The submitted combustible air opening calculation letter requires 160 sq inches for each opening.
Documents & Images
Date Uploaded File Type Document Name
04/13/2021 Application Form Permit Application
04/13/2021 Application Form License Tax Form
04/13/2021 MO150 - Air Combustion
04/14/2021 Approved Plans Approved Drawings
04/14/2021 Letter Codes Residential Plan Review
04/20/2021 Plot Plan Approved Plot Plan
04/21/2021 Receipt Receipt for transaction:2021-002096
04/21/2021 Letter DS Building Permit
06/21/2021 M L Crose 4724 NE Freehold Dr LSMO Monticello Lot 150 3rd Party Footing Inspection Report 6-21-21
07/09/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/03/2022 Plot Plan Approved As Graded Plot Plan
06/07/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter Codes Final Certificate of Occupancy
06/14/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home