PRRES20211434
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES
03/30/2021
04/02/2021
06/22/2022
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/02/2021 03/31/2021
Brandon Kalwei
Residential Plan Review Approved 04/02/2021 03/31/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $860.71 $860.71 Paid 04/02/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 04/02/2021
Right of Way Permit Fee $80.00 $80.00 Paid 04/02/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 04/02/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 04/02/2021
Water Meter Fee $455.54 $455.54 Paid 04/02/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/24/2021 6/24/2021 06/24/2021
Underslab Plumbing Inspection - Residential Passed 8/2/2021 8/2/2021 08/02/2021
Sewer Service Inspection - R Passed 8/31/2021 (8:00) 8/31/2021 08/31/2021
Water Service Inspection - R Passed 8/31/2021 8/31/2021 08/31/2021
Erosion Control Inspection Residential Failed 8/31/2021 8/31/2021 08/31/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/31/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 1/5/2022 1/5/2022 01/05/2022
Gas Service Inspection - Residential Passed 1/5/2022 1/5/2022 01/05/2022
All Rough Inspection - Residential Failed 1/5/2022 1/5/2022 01/05/2022
Misc
Corrective Action Required
01/05/2022
-add bocca protection plate at bottom plate DWV laundry -solid block at sheathing breaks front entry, front bedroom walls -secure all vertical DWV 2” or less at mid point -seal all top and bottom plate penetrations, see kitchen, great room -seal through floor penetration for gas line at fireplace -secure gas flex line at fireplace -seal deadspace open to attic above basement stairs, master bath/bed wall -address damaged truss above basement stairs -address top plate to top plate connection, N garage wall and front entry wall -Min (4) 2x4 stud pack at girder truss bearing ends per plans -(2) 2x4 trimmer studs at garage entry per plans -LIB bracing garage per plans -add joist hangers basement Stair wall joists to beams -Nail all exterior sheathing per plans
All Rough Inspection - Residential Failed 1/11/2022 1/11/2022 01/11/2022
Misc
Corrective Action Required
01/05/2022
-add joist hangers basement Stair wall joists to beams, see rear N side of stairs behind stair stringer -Nail all exterior sheathing per plans
All Rough Inspection - Residential Passed 1/13/2022 1/13/2022 01/13/2022
Misc
Resolved
01/13/2022
-add joist hangers basement Stair wall joists to beams, see rear N side of stairs behind stair stringer -Nail all exterior sheathing per plans
Driveway Inspection Passed 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/18/2022
On Monday, 4-18-2022. I passed a driveway sub-grade and forms for placement of concrete.
Sidewalk Inspection Passed 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/18/2022
On Monday, 4-18-2022. I passed side walk for concrete placement.
Erosion Control Inspection Residential Failed 4/26/2022 04/26/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/26/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
04/26/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 04/26/2022 2:49 PM
Occupancy Inspection - Codes Residential Failed 4/29/2022 4/29/2022 04/29/2022
Misc
Corrective Action Required
04/29/2022
-inspection denied erosion control not in compliance Clean up street clean storm inlet and top of storm box erosion control to be in compliance
Occupancy Inspection - Codes Residential Temporary C of O 5/6/2022 5/6/2022 05/06/2022
Misc
Resolved
05/06/2022
-inspection denied erosion control not in compliance Clean up street clean storm inlet and top of storm box erosion control to be in compliance
Miscellaneous Correction
Corrective Action Required
05/06/2022
- Final grading and sod - Provide gutters and down spouts - Provide splash blocks - Obtain an irrigation permit and submit back flow certification - Seal all exterior penetrations - Sump discharge is 36” away from foundation Seal top of meter can and HVAC disconnect
Erosion Control Inspection Residential Failed 5/6/2022 05/06/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
05/06/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Mitchell Schwarz 04/26/2022 2:49 PM
Misc
Corrective Action Required
05/06/2022
Remove debris from street Clean storm inlet
Piers/Caissons Inspection - Residential Passed 6/13/2022 06/13/2022
Misc
Informational
06/13/2022
Addressed in third party footing inspection.
Occupancy Inspection - Codes Residential Failed 6/13/2022 6/13/2022 06/13/2022
Miscellaneous Correction
Corrective Action Required
05/06/2022
-submit as graded plot plan
Plot Plan Inspection Passed 6/22/2022 06/22/2022
Erosion Control Inspection Residential Passed 6/22/2022 06/22/2022
Misc
Corrective Action Required
05/06/2022
Remove debris from street Clean storm inlet
Occupancy Inspection - Codes Residential Full C of O 6/22/2022 6/22/2022 06/22/2022
Miscellaneous Correction
Resolved
06/22/2022
-submit as graded plot plan
Documents & Images
Date Uploaded File Type Document Name
03/30/2021 Application Form APPLICATION
03/31/2021 93 HAWTHORNE RIDGE ROOF LAYOUT
03/31/2021 LOT 93 FINAL
03/31/2021 H3 #93 - Westport - Craftsman - F12x12C - Sheets- signed
03/31/2021 I45026742_H3-93
03/31/2021 Approved Plans APPROVED PLANS
03/31/2021 Approved Plans APPROVED TRUSS DRAWINGS
03/31/2021 Approved Plans APPROVED TRUSS LAYOUT
03/31/2021 Plot Plan APPROVED PLOT PLAN
04/02/2021 Receipt Receipt for transaction:2021-001699
04/02/2021 Letter DS Building Permit
06/24/2021 Lot 93 Hawthorne Ridge Footing Inspection
06/24/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/05/2022 Letter INSPECTION SUMMARY
01/10/2022 H3-93 LETTER
01/11/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter Codes Temporary Certificate of Occupancy
05/06/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/21/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
06/22/2022 Letter Codes Final Certificate of Occupancy
06/22/2022 Letter Field Certificate of Occupancy
06/22/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home