Permit Application Status

PRRES20211236


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211236
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
03/18/2021
03/24/2021
09/15/2021
04/08/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JOSH@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/26/2021 03/24/2021
Kim Brennan
Legal description
Corrective Action Required
03/24/2021

The legal description, including plat or phase number and lot number, and street address must be provided on the plot plan. Please add LN to address
Basement opening elevations
Corrective Action Required
03/24/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. MBOE's were removed on the revised MDP
Residential Plan Review Approved 03/26/2021 03/24/2021
Kim Brennan
Planning Review (RES) Approved 03/23/2021 03/19/2021
Shannon McGuire
Plot Plan Review Rejected 03/22/2021 03/19/2021
Kim Brennan
Legal description
Corrective Action Required
03/19/2021

The legal description, including plat or phase number and lot number, and street address must be provided on the plot plan. Please add LN to address
Basement opening elevations
Corrective Action Required
03/19/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. MBOE's were removed on the revised MDP
Residential Plan Review Approved 03/22/2021 03/19/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,348.05 $1,348.05 Paid 03/24/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/24/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 03/24/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 03/24/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/24/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/24/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/17/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/17/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 02/07/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 02/07/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 02/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/22/2021 04/22/2021
Underslab Plumbing Inspection - Residential Passed 6/11/2021 6/11/2021 06/10/2021
All Rough Inspection - Residential Failed 7/9/2021 7/12/2021 07/12/2021
Misc
Informational
07/12/2021
-7/12/21 GARAGE PORTAL OK TO COVER, NO TRUSS PLANS ON SITE FOR COVERED PORCH/DECK INSPECTION
Miscellaneous Correction
Corrective Action Required
10/08/2021
Sewer Service Inspection - R Passed 7/27/2021 07/27/2021
Water Service Inspection - R Passed 7/29/2021 07/29/2021
Erosion Control Inspection Residential Failed 10/8/2021 10/08/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/08/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE - MAINTAIN SILT FENCE - - MAINTAIN WEEDS - - CONTAIN TRASH AND DEBRIS SO AS NOT TO BLOW OR WASH INTO THE STORM DRAINAGE SYSTEM OR OTHER PROPERT OWNERS - - CLEAN STREET -.
All Rough Inspection - Residential Not Ready 10/8/2021 10/8/2021 10/08/2021
Misc
Informational
07/12/2021
-7/12/21 GARAGE PORTAL OK TO COVER, NO TRUSS PLANS ON SITE FOR COVERED PORCH/DECK INSPECTION
Miscellaneous Correction
Corrective Action Required
10/08/2021
- INSPECTION DENIED - - NO TRUSS CITY APPROVED TRUSS LAYOUT & DETAIL PACKAGE ON SITE - - EROSION CONTROL FAILED -
All Rough Inspection - Residential Not Ready 10/12/2021 10/12/2021 10/12/2021
Misc
Corrective Action Required
10/12/2021
-7/12/21 GARAGE PORTAL OK TO COVER, NO TRUSS PLANS ON SITE FOR COVERED PORCH/DECK INSPECTION
Miscellaneous Correction
Corrective Action Required
10/08/2021
- INSPECTION DENIED - - NO TRUSS CITY APPROVED TRUSS LAYOUT & DETAIL PACKAGE ON SITE - - EROSION CONTROL FAILED -
Misc
Corrective Action Required
10/12/2021
3rd time- provide full set of plans at time of inspection. 2 fees
Gas Service Inspection - Residential Failed 10/14/2021 10/14/2021 10/14/2021
G2417.4.1 Test Pressure
Corrective Action Required
10/14/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Electrical Service Inspection Passed 10/14/2021 10/14/2021 10/14/2021
All Rough Inspection - Residential Failed 10/14/2021 10/14/2021 10/14/2021
Misc
Resolved
10/14/2021
-7/12/21 GARAGE PORTAL OK TO COVER, NO TRUSS PLANS ON SITE FOR COVERED PORCH/DECK INSPECTION
Miscellaneous Correction
Corrective Action Required
10/12/2021
-(2) rows 16d sinkers 3” oc at top plate to header PFH -Address single car bay to attached at top plates at return wall -Tighten anchor bolt NE corner garage -Attic access required at 2 car bay -Complete furouts and subsequent fireblocking at DWV in garage -Address exterior walls not connected at top plate at garage/pantry -Header off cut floor joists at chase in pantry-pantry wall is non load bearing wall -Seal through floor penetrations near cooktop -Complete gas and fireplace installation and secure csst -Strap top plates at fireplace not overlapping 24” -(3) 2x4 for lvl bearing in garage/pantry -H2.5 on both plies GT master closet -Attic access per code upstairs -1” minimum clearance to combustibles required at b vent in master bed chase -Complete electrical for outlet at whirlpool tub- this must remain accessible -Protection of dwv in master bath needs to extend 2” past top of plate as well where plate line is lower than top of wall -Block between joists above beam where joist ends do not overlap near stairs -Seal gaps between foundation wall and garage at ufer pocket and beam pocket -Identify White current insulated conductors as current carrying conductors at both points of termination -Repair damaged sheathing at sec -no pressure at gas gauge
Misc
Resolved
10/14/2021
3rd time- provide full set of plans at time of inspection. 2 fees
Gas Service Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
G2417.4.1 Test Pressure
Corrective Action Required
10/14/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe. 10/20/2021 no pressure on gauge.
All Rough Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
Miscellaneous Correction
Corrective Action Required
10/14/2021
-Address single car bay to attached at top plates at return -Complete gas and fireplace installation and secure -Seal gaps between foundation wall and garage at ufer pocket and beam pocket -Repair damaged sheathing at sec -no pressure at gas gauge
All Rough Inspection - Residential Not Ready 11/2/2021 11/2/2021 11/02/2021
Miscellaneous Correction
Corrective Action Required
10/21/2021
-Address single car bay to attached at top plates at return -Complete gas and fireplace installation and secure counter strike gas line & provide shield at entry to fireplace, connect gas line at fireplace and provide minimum 10 PSI 15 minutes -Repair damaged sheathing at sec ( service entry cable above service panel still damaged 11/2/21) -no pressure at gas gauge ( still 0 PSI 11/2/21
Gas Service Inspection - Residential Not Ready 11/2/2021 11/2/2021 11/02/2021
G2417.4.1 Test Pressure
Corrective Action Required
10/21/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe. 10/20/2021 no pressure on gauge.
Misc
Corrective Action Required
10/28/2021
INSTALL FIREPLACE CONNECT GAS LINE
Misc
Corrective Action Required
11/02/2021
CONNECT GAS LINE TO FIRE PLACE PROVIDE SHIELD FOR COUNTERSTRIKE AT ENTRY TO FIREPLACE 0 PSI AT GAUGE PROVIDE MIN 10 PSI FOR 15 MINUTES
Driveway Inspection Partial 11/8/2021 11/8/2021 11/08/2021
Misc
Informational
11/08/2021
Driveway was framed in, had aggregate in place and compacted. Meets LS and ADA specs. 11/8 ES
Erosion Control Inspection Residential Failed 11/9/2021 11/09/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/08/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE - MAINTAIN SILT FENCE - - MAINTAIN WEEDS - - CONTAIN TRASH AND DEBRIS SO AS NOT TO BLOW OR WASH INTO THE STORM DRAINAGE SYSTEM OR OTHER PROPERT OWNERS - - CLEAN STREET -.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/09/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE -
Gas Service Inspection - Residential Passed 11/9/2021 11/9/2021 11/09/2021
G2417.4.1 Test Pressure
Resolved
11/09/2021
INSPECTION, TESTING AND PURGING. AMENDED 7-945. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe. 10/20/2021 no pressure on gauge.
Misc
Resolved
11/09/2021
INSTALL FIREPLACE CONNECT GAS LINE
Misc
Resolved
11/09/2021
CONNECT GAS LINE TO FIRE PLACE PROVIDE SHIELD FOR COUNTERSTRIKE AT ENTRY TO FIREPLACE 0 PSI AT GAUGE PROVIDE MIN 10 PSI FOR 15 MINUTES
All Rough Inspection - Residential Passed 11/9/2021 11/9/2021 11/09/2021
Miscellaneous Correction
Resolved
11/09/2021
Driveway Inspection Passed 11/12/2021 11/12/2021 11/12/2021
Misc
Informational
11/08/2021
Driveway was framed in, had aggregate in place and compacted. Meets LS and ADA specs. 11/8 ES
Misc
Informational
11/12/2021
Driveway meets LS and ADA spec. 11/12 ES
Occupancy Inspection - Codes Residential Failed 2/4/2022 2/4/2022 02/04/2022
Misc
Corrective Action Required
02/04/2022
Misc
Corrective Action Required
02/04/2022
-Pay all fees due before occupancy -Sidewalk inspection pending -Illuminated address required for occupancy -Maintain erosion control until sod is in place -Place range on anti tip device -Secure post at mid stair landing -Secure handrail to basement -Provide ladder at egress well -Garage door must self close and latch -Set attic access cover at garage -Obtain lawn irrigation permit and backflow certification -Final grade, sod, splash blocks, sump extension
Plot Plan Inspection Passed 2/7/2022 02/07/2022
Occupancy Inspection - Codes Residential Temporary C of O 2/18/2022 2/18/2022 02/18/2022
Misc
Corrective Action Required
02/04/2022
-Sidewalk inspection pending -Maintain erosion control until sod is in place -Obtain lawn irrigation permit and backflow certification -Final grade, sod, splash blocks, sump extension
Erosion Control Inspection Residential Failed 3/18/2022 03/18/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/09/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE - MAINTAIN SILT FENCE - - MAINTAIN WEEDS - - CONTAIN TRASH AND DEBRIS SO AS NOT TO BLOW OR WASH INTO THE STORM DRAINAGE SYSTEM OR OTHER PROPERT OWNERS - - CLEAN STREET -.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/09/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE -
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/18/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN SILT FENCE UNTIL SOD COMPLETE
Occupancy Inspection - Codes Residential Temporary C of O 3/18/2022 03/18/2022
Misc
Corrective Action Required
02/18/2022
-Sidewalk inspection pending -Maintain erosion control until sod is in place -Final grade, sod, splash blocks, sump extension - SOD NOT DONE EXTEND TCO TIL 4/15/22 - Michael Harkins 03/18/2022 10:48 AM
Sidewalk Inspection Partial 3/21/2022 3/21/2022 03/21/2022
Misc
Informational
03/21/2022
Forms were placed and aggregate was present and compacted. Needed some more aggregate next to the driveway. Contractor dug it out and added extra aggregate. RP 3-21-22
Sidewalk Inspection Passed 4/1/2022 4/1/2022 04/01/2022
Misc
Informational
03/21/2022
Forms were placed and aggregate was present and compacted. Needed some more aggregate next to the driveway. Contractor dug it out and added extra aggregate. RP 3-21-22
Misc
Informational
04/01/2022
Finished sidewalk meets LS and ADA specs. RP 4-1-22
Occupancy Inspection - Codes Residential Full C of O 4/8/2022 4/8/2022 04/08/2022
Misc
Resolved
04/08/2022
Documents & Images
Date Uploaded File Type Document Name
03/18/2021 Application Form Permit Application and License Tax Form
03/19/2021 Approved Plans Approved Drawings
03/19/2021 Approved Plans Approved Truss Layout
03/19/2021 Approved Plans Approved Truss Package
03/19/2021 Letter Codes Residential Plan Review
03/24/2021 Plot Plan Approved Plot Plan
03/24/2021 Receipt Receipt for transaction:2021-001486
03/24/2021 Letter DS Building Permit
04/22/2021 Letter INSPECTION SUMMARY
06/10/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/27/2021 Letter INSPECTION SUMMARY
07/27/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/17/2021 Receipt Receipt for transaction:2021-008036
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
11/02/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/08/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/09/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
02/04/2022 Letter INSPECTION SUMMARY
02/07/2022 Plot Plan Approved As Graded Plot Plan
02/07/2022 Receipt Receipt for transaction:2022-000635
02/07/2022 Letter INSPECTION SUMMARY
02/18/2022 Letter Codes Temporary Certificate of Occupancy
03/18/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter Codes Temporary Certificate of Occupancy
03/21/2022 Letter INSPECTION SUMMARY
04/01/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter Field Certificate of Occupancy
04/08/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home