Permit Application Status

PRRES20204715


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204715
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - SUSPENDED SLAB - FINISHED AND UNFINISHED BASEMENT
12/10/2020
01/11/2021
06/26/2021
10/12/2022
Locations
Contacts
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
DANDDBUILDINGCO@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/30/2020 12/28/2020
Brandon Kalwei
Residential Plan Review Approved 12/30/2020 12/28/2020
Brandon Kalwei
06 Designate use of each room or space
Corrective Action Required
12/28/2020

Designate use of each room or space including but not limited to; basement storage, garages, and attic areas intended for storage space. - Storage/garage space needs to be labeled underneath suspended slab
07 Identify emergency escape openings from bedrooms
Corrective Action Required
12/28/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) bedroom #2 needs to have egress labeled
12 Detail required separation between garage and living area including door
Corrective Action Required
12/28/2020

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) The door in the garage space undeneath suspended slab will need go be self closing.
Plot Plan Review Approved 12/14/2020 12/22/2020
Brandon Kalwei
Residential Plan Review Rejected 12/14/2020 12/22/2020
Brandon Kalwei
06 Designate use of each room or space
Corrective Action Required
12/10/2020

Designate use of each room or space including but not limited to; basement storage, garages, and attic areas intended for storage space. - Storage/garage space needs to be labeled underneath suspended slab
07 Identify emergency escape openings from bedrooms
Corrective Action Required
12/10/2020

Identify emergency escape openings from bedrooms and basement(s). (IRC Section R310 as amended per Ordinance) bedroom #2 needs to have egress labeled
12 Detail required separation between garage and living area including door
Corrective Action Required
12/10/2020

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) The door in the garage space undeneath suspended slab will need go be self closing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,297.35 $1,297.35 Paid 01/12/2021
8331507-Sewer Connection Fee $510.00 $510.00 Paid 01/12/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 01/12/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 01/12/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 01/12/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 01/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/12/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 1/26/2021 (1:00) 1/26/2021 01/26/2021
Misc
Corrective Action Required
01/26/2021
Installation does not match approved submittals. Revise and resubmit for review/approval
Footing Inspection - Residential Failed 1/26/2021 01/27/2021
Misc
Corrective Action Required
01/26/2021
Installation does not match approved submittals. Revise and resubmit for review/approval
Misc
Corrective Action Required
01/27/2021
Tuesday 3:30pm 1/26/21. I talked with Troy Shaw and we agreed because of the weather to pour the footing including the retaining wall portion. we will hold off with the placement of the foundation wall until all plans are revised and approved through our department. After receiving the VM from Dan from Kevin. i called multiple times and Kevin did not answer. I called and talked to Jack that gave me Tom's number. Explained everything to Tom, that is on the front end of the builds , now he is aware to resubmit the proper plans for review. At this time no foundation shall be set or poured or a stop construction hold will be placed on the permit. MARK HARDING 01/27/2021 11:35 AM
Underslab Plumbing Inspection - Residential Not Ready 3/2/2021 03/02/2021
Misc
Corrective Action Required
03/02/2021
Not ready for inspection, no underslab DWV installed
Erosion Control Inspection Residential Failed 3/2/2021 03/02/2021
Misc
Corrective Action Required
03/02/2021
Immediate street cleanup required, no further inspections until resolved
Miscellaneous Inspection Failed 3/2/2021 03/02/2021
Misc
Corrective Action Required
03/02/2021
Post site address
Erosion Control Inspection Residential Failed 3/10/2021 03/10/2021
Misc
Resolved
03/17/2021
Immediate street cleanup required, no further inspections until resolved
Misc
Corrective Action Required
03/10/2021
-Erosion control requires continuous maintenance. Re-establish removed section at curb within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
Underslab Plumbing Inspection - Residential Failed 3/10/2021 3/10/2021 03/10/2021
Misc
Corrective Action Required
03/02/2021
Inspection denied. Noncompliance with erosion control inspection report dated 03/02/2021
Miscellaneous Inspection Failed 3/10/2021 03/10/2021
Misc
Corrective Action Required
03/02/2021
Post site address THIRD notification, no further inspections until resolved
Sewer Service Inspection - R Passed 3/29/2021 03/29/2021
Underslab Plumbing Inspection - Residential Failed 3/29/2021 03/29/2021
Misc
Corrective Action Required
03/10/2021
no underslab inspection on record, basement slab is poured
Miscellaneous Inspection Failed 3/15/2021 03/29/2021
Misc
Corrective Action Required
03/10/2021
Post site address FINAL NOTICE
Water Service Inspection - R Passed 3/30/2021 03/30/2021
Erosion Control Inspection Residential Failed 4/27/2021 04/27/2021
Misc
Corrective Action Required
03/10/2021
-Erosion control requires continuous maintenance, repair damaged sections within 48 hours -Immediate street cleanup required, oil spill in the street from material delivery vehicle. Total cleanup required within 48 hours or the city will abate the condition and charge the permit holder no further inspections until resolved
Misc
Resolved
04/27/2021
Noncompliance with erosion control inspection report dated 03/02/2021 -Erosion control requires continuous maintenance. Re-establish removed section at curb within 48 hours -immediate street cleanup required -provide and maintain gravel filter -no further inspections until issues are resolved
All Rough Inspection - Residential Failed 5/12/2021 5/12/2021 05/12/2021
Misc
Corrective Action Required
05/12/2021
Inspection denied due to lack of compliance with erosion control inspection reports
Erosion Control Inspection Residential Failed 5/12/2021 05/12/2021
Misc
Corrective Action Required
04/27/2021
-Erosion control requires continuous maintenance, repair damaged sections and establish methods at front curb within 48 hours -Immediate street cleanup required no further inspections until resolved
Erosion Control Inspection Residential Failed 5/18/2021 05/18/2021
Misc
Corrective Action Required
05/12/2021
-Erosion control requires continuous maintenance, repair damaged sections and establish methods at front curb within 48 hours -Immediate street cleanup required no further inspections until resolved -FINAL NOTICE- STOP WORK ORDER WILL BE ISSUED IN 48 HOURS IF ISSUES ARE NOT RESOLVED
Piers/Caissons Inspection - Residential Passed 7/29/2021 07/29/2021
Gas Service Inspection - Residential Passed 10/8/2021 10/8/2021 10/08/2021
Electrical Service Inspection Passed 10/8/2021 10/8/2021 10/08/2021
Erosion Control Inspection Residential Failed 10/8/2021 10/08/2021
Misc
Corrective Action Required
05/18/2021
**HOMEOWNER OF ADJACENT PROPERTY COMPLAINTED ABOUT SILT FENCE ENCROACHING ONTO HER PROPERTY, BLOCKING SPRINKLER HEAD. PLEASE CONTACT THAT HOMEONWER TO RESOLVE THIS ISSUE
Underslab Plumbing Inspection - Residential Passed 10/8/2021 10/08/2021
Misc
Informational
10/08/2021
Signed letter from the plumbing contractor was received, stating the underslab plumbing is compliance with code.
All Rough Inspection - Residential Failed 10/8/2021 10/8/2021 10/08/2021
Misc
Corrective Action Required
05/12/2021
-Footing not approved -Provide roof truss layout and truss package and floor TJI plan on site. -Provide 2”x2”x3/16” washers at garage PFH walls -Fb foyer closet wall and duct space from roof -Slope the plumbing vent in attic toward drain -Strap exterior wall top plates where bored more than 50% -Install wall header above kitchen hood duct -Nail corner studs per code -Security blocking for deck doors, 3 stud space out or to corner -Fb the back side of fireplace from roof -Complete framing and fasten fireplace to framing -Provide min 1” clearance from fireplace flue to combustible -Strap cut wall top plates to lvl header at rear master bedroom -Provide engineer report for truss repair above stair -Tie down front bedroom roof trusses to wall -Nail together girder trusses per plan -Tie down girder truss with device that can resist the uplift forces. See the girder page. -Fb basement wall vertically at ten ft or less; fb all wall space from soffits; insulation used as fire blocking material shall be secured in place; fb the stair stringer space from ceiling space; fb stair wall from ceiling space ; fb wall top plates penetrations -Extend supply air duct in unfinished basement to ceiling level -Anchor basement sill plates within 12” of breaks -Water lines are outside of wall space at front basement bedroom -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT INSULATE
All Rough Inspection - Residential Failed 2/24/2022 2/24/2022 02/24/2022
Misc
Corrective Action Required
10/08/2021
could not enter home no lock box no code Mitchell Schwarz 02/24/2022 9:00 AM -Footing not approved -Provide roof truss layout and truss package and floor TJI plan on site. -Provide 2”x2”x3/16” washers at garage PFH walls -Fb foyer closet wall and duct space from roof -Slope the plumbing vent in attic toward drain -Strap exterior wall top plates where bored more than 50% -Install wall header above kitchen hood duct -Nail corner studs per code -Security blocking for deck doors, 3 stud space out or to corner -Fb the back side of fireplace from roof -Complete framing and fasten fireplace to framing -Provide min 1” clearance from fireplace flue to combustible -Strap cut wall top plates to lvl header at rear master bedroom -Provide engineer report for truss repair above stair -Tie down front bedroom roof trusses to wall -Nail together girder trusses per plan -Tie down girder truss with device that can resist the uplift forces. See the girder page. -Fb basement wall vertically at ten ft or less; fb all wall space from soffits; insulation used as fire blocking material shall be secured in place; fb the stair stringer space from ceiling space; fb stair wall from ceiling space ; fb wall top plates penetrations -Extend supply air duct in unfinished basement to ceiling level -Anchor basement sill plates within 12” of breaks -Water lines are outside of wall space at front basement bedroom -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT INSULATE
All Rough Inspection - Residential Failed 2/28/2022 2/28/2022 02/28/2022
Misc
Corrective Action Required
02/24/2022
MAINTAIN GRAVEL FILTER AT LOT ENTRANCE Truss layout and plans not on site could not fully inspect Mitchell Schwarz 02/28/2022 10:59 AM -Footing not approved -Provide roof truss layout and truss package and floor TJI plan on site -Fb foyer closet wall and duct space from roof SEAL GAPS -Strap cut wall top plates to lvl header at rear master bedroom NAIL OFF ATRAPS COMPLETELY AND PROVIDE ON BOTH TOP PLATES -Provide engineer report for truss repair above stair -Tie down girder truss with device that can resist the uplift forces. See the girder page. -Fb basement wall vertically at ten ft or less; fb all wall space from soffits; insulation used as fire blocking material shall be secured in place; fb the stair stringer space from ceiling space; fb stair wall from ceiling space ; fb wall top plates penetrations -Extend supply air duct in unfinished basement to ceiling level -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT INSULATE
Erosion Control Inspection Residential Failed 2/28/2022 02/28/2022
Misc
Resolved
02/28/2022
**HOMEOWNER OF ADJACENT PROPERTY COMPLAINTED ABOUT SILT FENCE ENCROACHING ONTO HER PROPERTY, BLOCKING SPRINKLER HEAD. PLEASE CONTACT THAT HOMEONWER TO RESOLVE THIS ISSUE
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/28/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Passed 3/4/2022 03/04/2022
Misc
Corrective Action Required
01/27/2021
Installation does not match approved submittals. Revise and resubmit for review/approval
Misc
Corrective Action Required
01/27/2021
Tuesday 3:30pm 1/26/21. I talked with Troy Shaw and we agreed because of the weather to pour the footing including the retaining wall portion. we will hold off with the placement of the foundation wall until all plans are revised and approved through our department. After receiving the VM from Dan from Kevin. i called multiple times and Kevin did not answer. I called and talked to Jack that gave me Tom's number. Explained everything to Tom, that is on the front end of the builds , now he is aware to resubmit the proper plans for review. At this time no foundation shall be set or poured or a stop construction hold will be placed on the permit. MARK HARDING 01/27/2021 11:35 AM
All Rough Inspection - Residential Failed 3/4/2022 3/4/2022 03/04/2022
Misc
Corrective Action Required
02/28/2022
-Provide engineer report for truss repair above stair -Extend supply air duct in unfinished basement to ceiling level -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT COVER AREAS STILL IN NEED OF INSPECTION
All Rough Inspection - Residential Failed 3/16/2022 3/16/2022 03/16/2022
Misc
Corrective Action Required
03/04/2022
-Provide engineer report for truss repair above stair -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT COVER AREAS STILL IN NEED OF INSPECTION
All Rough Inspection - Residential Passed 3/22/2022 3/22/2022 03/22/2022
Misc
Resolved
03/22/2022
-Provide engineer report for truss repair above stair -Have engineer address CSPF walls at breakfast and master bedroom not constructed per plan **DO NOT COVER AREAS STILL IN NEED OF INSPECTION
Driveway Inspection Passed 5/27/2022 5/27/2022 06/14/2022
Misc
Informational
05/27/2022
On 5.27.2022 I performed a driveway inspection and pass the subgrade to pour concrete
Misc
Informational
06/14/2022
On Tuesday, 6-14-2022, I viewed the driveway already poured for sign off. Driveway meets and passes inspection.
Erosion Control Inspection Residential Passed 9/13/2022 09/13/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/13/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Plot Plan Inspection Passed 9/13/2022 09/13/2022
Occupancy Inspection - Codes Residential Failed 9/13/2022 9/13/2022 09/13/2022
Misc
Corrective Action Required
09/13/2022
-address piers poured without inspection -pay all fees -obtain lawn irrigation permit -address pending driveway and sidewalk inspections -spark ring at fire place outlet -security screws at basement patio door -(2)1/2” through bolts at each deck post to beam connection -provide pan for water heater
Driveway Inspection Passed 6/14/2022 10/12/2022
Misc
Informational
05/27/2022
On 5.27.2022 I performed a driveway inspection and pass the subgrade to pour concrete
Misc
Informational
10/12/2022
On Wednesday, 10-12-2022 I performed a visual inspection and found driveway to pass city acceptance.
Occupancy Inspection - Codes Residential Full C of O 10/12/2022 10/12/2022 10/12/2022
Misc
Resolved
10/12/2022
-pay all fees
Documents & Images
Date Uploaded File Type Document Name
12/10/2020 Application Form APPLICATION
12/10/2020 DD-7155 (LOT 12 WHISPERING WOODS) REV 11-6-20 (1)
12/22/2020 Letter Codes Residential Plan Review
12/22/2020 Plot Plan APPROVED PLOT PLAN
12/22/2020 Approved Plans approved suspended slab details
12/28/2020 Approved Plans APPROVED PLANS
01/11/2021 Receipt Receipt for transaction:2021-000143
01/11/2021 Letter DS Building Permit
01/12/2021 Receipt Receipt for transaction:2021-000154
01/26/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/28/2021 WW 12 FINAL REV
01/28/2021 DD-7155 (LOT 12 WHISPERING WOODS) RESEALED
01/28/2021 Approved Plans APPROVED PLANS
01/28/2021 Plot Plan APPROVED PLOT PLAN
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/17/2021 Letter INSPECTION SUMMARY
03/17/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
04/06/2021 12ww Miller Plumbing letter
04/07/2021 Final_2021_03_31_SusSlab_Lees Summit_D&D
04/27/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
10/12/2021 Approved Plans APPROVED TRUSS PACKAGE
10/14/2021 Approved Plans APPROVED TRUSS LAYOUT
02/24/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/16/2022 Letter INSPECTION SUMMARY
03/17/2022 20-002-44 DD-7155 Field Modification Response
03/22/2022 Letter INSPECTION SUMMARY
05/27/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
10/12/2022 Letter INSPECTION SUMMARY
10/12/2022 Receipt Receipt for transaction:2022-008214
10/12/2022 Letter Field Certificate of Occupancy
10/12/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home