Permit Application Status

PRRES20204591


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204591
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
12/03/2020
12/16/2020
08/09/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
Reliable Mechanical Services, Inc. , Address:1025 W Couchman Dr.  
JOSH@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (RES) Approved 12/18/2020 12/16/2020
Kim Brennan
Plot Plan Review Approved 12/07/2020 12/15/2020
Kim Brennan
Residential Plan Review Approved 12/07/2020 12/04/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,218.75 $1,218.75 Paid 12/16/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/16/2020
Right of Way Permit Fee $80.00 $80.00 Paid 12/16/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 12/16/2020
Water Meter Fee $455.54 $455.54 Paid 12/16/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 12/16/2020
Not Ready Inspection Fee $50.00 $50.00 Paid 08/06/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/06/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/06/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/7/2021 (2:00) 1/7/2021 01/07/2021
Misc
Informational
01/07/2021
- UFER @ REAR GARAGE FOUNDATION WALL -
Underslab Plumbing Inspection - Residential Passed 1/25/2021 1/25/2021 01/25/2021
Misc
Corrective Action Required
01/25/2021
- PROVIDE ADDRESS -
Sewer Service Inspection - R Passed 3/9/2021 (1:00) 3/9/2021 03/09/2021
Water Service Inspection - R Passed 3/11/2021 (9:00) 3/11/2021 03/11/2021
Electrical Service Inspection Passed 4/6/2021 4/6/2021 04/06/2021
Gas Service Inspection - Residential Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
04/06/2021
- COMPLETE GAS LINES - - PROVIDE MIN 8 PSI FOR 15 MIN FOR GAS TEST -
All Rough Inspection - Residential Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
04/06/2021
Gas service FAIL Provide soffits/ furr outs garage Tighten anchor bolts garage Seal fire blocking top HVAC chases great room Provide 2 x 6 stud wall per plan (2.12) rear garage wall south of owner entry door Address stud packs under beam garage near porch plan calls for 3" SCH 40 column Provide (2) 9 1/4 LVLs per plan garage behind fridge to beam Repair floor powder room Insulate cantilevers prior to blocking (2.32) Provide solid blocking sheathing breaks above front door Provide fire blocking top plate bed #2 above ft porch Seal upward penetration bed #1 Provide roof boots radon penetration, vtr master bath, laundry vtr, bed #4 closet Complete dryer vent to roof connection Missing stud laundry/ bed #4 Provide H2.5 girder in loft Provide TJC37 hangers per truss schedule loft & stairway Provide lateral bracing K2,K3,K4 per plans loft Provide lateral bracing C5 per plan bed #1 Provide lateral bracing G trusses per plan bed #4 Provide truss layout for trusses beam to front of garage Provide solid blocking between joist under kitchen island per plan Provide joist hanger & nail joist hanger basement at stairway Provide 1" clearance low volt to B vent near water heater Tighten anchor bolts basement stairs Provide stud shoes snuff tube at fireplace bores Provide flashing above horizontal trim overhead doors Nail sheathing per code north of front stoop
All Rough Inspection - Residential Not Ready 4/16/2021 4/16/2021 04/16/2021
Misc
Corrective Action Required
04/06/2021
Gas service FAIL Provide soffits/ furr outs garage-complete at north end at HVAC Seal FB in soffits in garage Seal fire blocking top HVAC chases great room-north Insulate cantilevers prior to blocking Seal upward penetration bed #1 Provide lateral bracing K2,K3,K4 per plans loft Provide lateral bracing C5 per plan bed #1 Provide lateral bracing G trusses per plan bed #4 Provide truss layout for trusses beam to front of garage Provide flashing above horizontal trim overhead doors Nail sheathing per code north of front stoop
Gas Service Inspection - Residential Not Ready 4/16/2021 4/16/2021 04/16/2021
Misc
Corrective Action Required
04/06/2021
- PROVIDE MIN 10 PSI FOR 15 MIN FOR GAS TEST -
G2417.4 Test pressure measurement
Corrective Action Required
04/16/2021
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
All Rough Inspection - Residential Failed 4/19/2021 4/19/2021 04/19/2021
Misc
Corrective Action Required
04/16/2021
Gas service FAIL -FB soffits/ furr outs garage-complete at north end at HVAC Seal FB in chase in garage Seal fire blocking top HVAC chases great room-north Provide lateral bracing C5 per plan bed #1 Provide lateral bracing G6 trusses per plan bed #4 Provide flashing above horizontal trim overhead doors Nail sheathing per code north of front stoop
All Rough Inspection - Residential Passed 4/20/2021 4/20/2021 04/20/2021
Misc
Resolved
04/20/2021
Gas Service Inspection - Residential Passed 4/20/2021 4/20/2021 04/20/2021
Misc
Resolved
04/20/2021
- PROVIDE MIN 10 PSI FOR 15 MIN FOR GAS TEST -
G2417.4 Test pressure measurement
Resolved
04/20/2021
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
Driveway Inspection Partial 4/29/2021 4/29/2021 04/29/2021
Misc
Informational
04/29/2021
4-29-21 1:32pm The forms are set and the aggregate is compacted. They will be creaming the curb chips.
Driveway Inspection Partial 6/14/2021 6/14/2021 04/29/2021
Misc
Informational
04/29/2021
4-29-21 1:32pm The forms are set and the aggregate is compacted. They will be creaming the curb chips. They will need to stay ADA compliant.
Driveway Inspection Passed 5/7/2021 5/7/2021 05/07/2021
Misc
Informational
04/29/2021
4-29-21 1:32pm The forms are set and the aggregate is compacted. They will be creaming the curb chips. They will need to stay ADA compliant.
Misc
Informational
05/07/2021
Finished driveway meets LS and ADA specs. RP 5-7-21
Sidewalk Inspection Partial 6/14/2021 6/14/2021 06/14/2021
Misc
Informational
06/14/2021
6/14/21 15:30- Crew had 4in depth sidewalk, tamped down gravel, 5ft off the curb, and carried 2% or less.
Sidewalk Inspection Passed 6/18/2021 6/18/2021 06/18/2021
Misc
Informational
06/14/2021
6/14/21 15:30- Crew had 4in depth sidewalk, tamped down gravel, 5ft off the curb, and carried 2% or less.
Misc
Informational
06/18/2021
6/18/21 8:55- Sidewalk was poured, carried correct % and was cured correct.
Occupancy Inspection - Codes Residential Failed 7/8/2021 7/8/2021 07/08/2021
Misc
Corrective Action Required
07/08/2021
Pay not ready fees Irrigation permit #PRIRG20213213 Plot plan notes raise Manhole cover in front left of lot Provide sod & splash blocks Seal exterior light fixtures Provide Attic access garage per plan Remove construction debris from window well & Expose drain Seal top of meter can, low volt penetrations, gas meter, ac disconnect
Occupancy Inspection - Codes Residential Not Ready 7/14/2021 7/14/2021 07/14/2021
Misc
Corrective Action Required
07/08/2021
Pay not ready fees Irrigation permit #PRIRG20213213 Plot plan notes raise Manhole cover in front left of lot Provide sod & splash blocks Seal exterior light fixtures Provide Attic access garage per plan Remove construction debris from window well & Expose drain Seal top of meter can, low volt penetrations, gas meter, ac disconnect
Occupancy Inspection - Codes Residential Temporary C of O 8/6/2021 8/6/2021 08/06/2021
Misc
Corrective Action Required
07/14/2021
Pay not ready fees Plot plan notes raise Manhole cover in front left of lot ( raise lid to grade )
Plot Plan Inspection Passed 8/6/2021 08/06/2021
Occupancy Inspection - Codes Residential Full C of O 8/9/2021 8/9/2021 08/09/2021
Misc
Resolved
08/09/2021
Documents & Images
Date Uploaded File Type Document Name
12/03/2020 Application Form Permit Application and License Tax Form
12/04/2020 Approved Plans Approved Truss Layout
12/04/2020 Approved Plans Approved Truss Package
12/11/2020 Approved Plans Approved Drawings
12/15/2020 Plot Plan Approved Plot Plan
12/16/2020 Receipt Receipt for transaction:2020-008059
12/16/2020 Letter DS Building Permit
01/07/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/14/2021 Lot # 2 Woodside Ridge - Structural Inspection - Signed
04/16/2021 Letter INSPECTION SUMMARY
04/16/2021 Letter INSPECTION SUMMARY
04/16/2021 Letter INSPECTION SUMMARY
04/16/2021 Letter INSPECTION SUMMARY
04/19/2021 Approved Plans Approved Revised Truss Layout
04/19/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
05/07/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
06/18/2021 Letter INSPECTION SUMMARY
07/08/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter Codes Temporary Certificate of Occupancy
08/06/2021 Receipt Receipt for transaction:2021-006290
08/09/2021 Letter Field Certificate of Occupancy
08/09/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home