Summary
PRRES20203860
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES - COVERED DECK
10/21/2020
10/22/2020
07/23/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (RES) Approved 10/23/2020 10/21/2020
Dylan Eppert
Plot Plan Review Approved 10/23/2020 10/21/2020
Dylan Eppert
Residential Plan Review Approved 10/23/2020 10/21/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,266.08 $1,266.08 Paid 10/22/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 10/22/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 10/22/2020
Water Meter Fee $455.54 $455.54 Paid 10/22/2020
Right of Way Permit Fee $80.00 $80.00 Paid 10/22/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/6/2020 11/6/2020 11/06/2020
Underslab Plumbing Inspection - Residential Passed 12/16/2020 12/16/2020 12/16/2020
Sewer Service Inspection - R Passed 1/26/2021 (1:00) 1/26/2021 01/26/2021
Water Service Inspection - R Passed 1/28/2021 (2:00) 1/28/2021 01/28/2021
Gas Service Inspection - Residential Passed 2/22/2021 2/22/2021 02/22/2021
Electrical Service Inspection Passed 2/22/2021 2/22/2021 02/22/2021
All Rough Inspection - Residential Failed 2/22/2021 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/22/2021
-Complete fur downS and chase in garage -Seal all top and bottom plate penetrations see garage -Anchor bolts required within 12” of plate break in garage and basement -Install all nuts on anchor bolts in garage -Header off at HVAC box out chase in pantry, floor joist supported by non load bearing wall -Security blocking at exterior doors -Snow blocking in pantry, bed#4, bath#1, bed#1 closet -Address overbored floor joist for DWV, above kitchen/pantry wall R502.8.1 -Support DWV every 48” oc, traps not considered support -Secure gas flex line at fireplace -LIB bracing all locations per plans -(2) 2x4 at owner entry door per plans -H2.5 clips on hip trusses at covered deck -(4) stud pack at all girder truss ends per plans -All truss hangers per plans 2nd floor -B vent requires 1” clearance from combustibles, see pex at furnace in basement -(2) 2x10 above basement landing not seated on foundation wall -Address floor joist cut for DWV, SW side basement -3” diameter SCH column at pier location “A” basement stair wall -Full height 6x6 continuous cedar posts at deck -(2) bolts at all post/beam connections per code -Bolt outer ply of rim to ledger and add angel clip on inner ply at deck -Nail sheathing per plans, 6” edge 12” field
All Rough Inspection - Residential Failed 3/1/2021 3/1/2021 03/01/2021
Misc
Corrective Action Required
02/22/2021
-Address overbored floor joist for DWV, above kitchen/pantry wall R502.8.1 -submit engineer report on fix -secure electric box and NM at owner entry -Support DWV every 48” oc, traps not considered support - see bath#3/bed#5 -LIB bracing all locations per plans - garage -(2) 2x4 at owner entry door per plans - (2) jack studs -(4) stud pack at all girder truss ends per plans -2nd floor -3” diameter SCH column at pier location “A” basement stair wall -Full height 6x6 continuous cedar posts at deck-engineer to clarify if fix is acceptable
All Rough Inspection - Residential Failed 3/5/2021 3/5/2021 03/05/2021
Misc
Corrective Action Required
03/01/2021
-LIB bracing all locations per plans - see garage South wall -Full height 6x6 continuous cedar posts at deck- follow engineer revisions from letter - Install (2) 16-gauge ST12 Simpson galvanized straps per post per manufacturer’s specifications on both posts for deck and patio covering. Straps shall be centered over post cut and installed on opposite sides of post. **OK TO INSULATE**
All Rough Inspection - Residential Passed 3/9/2021 3/9/2021 03/09/2021
Misc
Resolved
03/09/2021
Driveway Inspection Passed 5/3/2021 05/04/2021
Misc
Informational
05/04/2021
On Monday, 5-03-2021. I performed a Drive Approach inspection that passed field inspections.
Sidewalk Inspection Passed 5/3/2021 05/04/2021
Misc
Informational
05/04/2021
On Monday, 5-03-2021. A field inspection for city sidewalk was performed and passed inspection.
Occupancy Inspection - Codes Residential Failed 6/16/2021 6/16/2021 06/16/2021
Misc
Corrective Action Required
06/16/2021
-Obtain lawn irrigation system permit -Final grade and sod -splash blocks all sump pump and downspout locations -Seal penetrations in siding, seal along top of AC disconnect and meter can -Address number color on house must contrast with background color -Guardrail at front porch -security screws at basement walkout, (2) 3” screws at each hinge and strike
Occupancy Inspection - Codes Residential Temporary C of O 6/24/2021 6/24/2021 06/24/2021
Misc
Corrective Action Required
06/16/2021
-Final grade and sod -splash blocks all sump pump and downspout locations -Seal penetrations in siding, seal along top of AC disconnect and meter can **OK FOR TCO - TCO EXPIRES 7/15/21**
Plot Plan Inspection Passed 7/20/2021 7/20/2021 07/20/2021
Erosion Control Inspection Residential Passed 07/20/2021
Occupancy Inspection - Codes Residential Failed 7/20/2021 7/20/2021 07/20/2021
Misc
Corrective Action Required
06/24/2021
-Sod less than 6" from siding on back west side of house -Ensure 6" of fall from foundation within first 10' at back west side of house
Occupancy Inspection - Codes Residential Full C of O 7/30/2021 7/30/2021 07/30/2021
Misc
Resolved
07/30/2021
Documents & Images
Date Uploaded File Type Document Name
10/21/2020 Application Form H4 #27 - PERMIT APPLICATION
10/21/2020 H4 #27 - TRUSS LAYOUT
10/21/2020 400640
10/21/2020 H4 #27 - Riverside - Modern Farmhouse - Sheets- signed
10/21/2020 LOT 27 FINAL
10/21/2020 Plans APPROVED HOUSE PLANS
10/21/2020 Specifications APPROVED TRUSS PACKAGE
10/21/2020 Drawing APPROVED TRUSS LAYOUT
10/21/2020 Plans APPROVED ELEVATIONS
10/21/2020 Plot Plan APPROVED PLOT PLAN
10/22/2020 Receipt Receipt for transaction:2020-007092
10/22/2020 Letter DS Building Permit
11/03/2020 27 Hawthorne Ridge Subgrade
11/05/2020 Lot 27 Hawthorne Ridge Footing Inspection
11/06/2020 Letter INSPECTION SUMMARY
11/20/2020 Lot 27 Hawthorne Ridge Wall Inspection
12/16/2020 Letter INSPECTION SUMMARY
01/26/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/04/2021 27 Hawthorne Ridge Non-continuous deck post letter
03/04/2021 27 Hawthorne Ridge Hole in Floor Joist Letter- signed (002)
03/05/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
06/16/2021 Letter INSPECTION SUMMARY
06/24/2021 Letter Codes Temporary Certificate of Occupancy
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter Field Certificate of Occupancy
07/30/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home