Permit Application Status

PRRES20203429


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20203429
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS - UNFINISHED BAEMENT
09/30/2020
10/06/2020
05/19/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/02/2020 10/05/2020
Dylan Eppert
Residential Plan Review Approved 10/02/2020 10/05/2020
Dylan Eppert
Planning Review (RES) Approved 10/05/2020 10/01/2020
Jennifer Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,266.08 $1,266.08 Paid 10/06/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 10/06/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 10/06/2020
Water Meter Fee $455.54 $455.54 Paid 10/06/2020
Right of Way Permit Fee $80.00 $80.00 Paid 10/06/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/06/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/13/2020 10/13/2020 10/13/2020
Underslab Plumbing Inspection - Residential Passed 11/13/2020 11/13/2020 11/13/2020
Electrical Service Inspection Passed 1/19/2021 1/19/2021 01/19/2021
Gas Service Inspection - Residential Passed 1/19/2021 1/19/2021 01/19/2021
All Rough Inspection - Residential Failed 1/19/2021 1/19/2021 01/19/2021
Misc
Corrective Action Required
01/19/2021
-Nail all garage portal straps -Seal all top plate penetrations-garage -Install nuts on garage PFH anchor bolts -Security blocking at exterior doors -12” oc nailing at all abutting and intersecting wall corners (braced wall panels) -support DWV every 48” oc, traps not considered support -LIB bracing all locations per plans -(2) 2x4 per plans at mud entry, owner entry, and kitchen window header per plans -Complete bath exhaust fan discharge - 2nd floor hall bath -Secure all vertical DWV 2” or less at mid point -Fireblock HVAC chase master bedroom/master bath -Truss bracing per plans -properly support 2nd floor stair landing -3” SCH 40 steel column at pier location “A” stair wall per plans -Nail exterior sheathing per plans 6” edge, 12” field -Install basement egress window per plans
All Rough Inspection - Residential Failed 1/21/2021 1/21/2021 01/21/2021
Misc
Corrective Action Required
01/19/2021
-Seal all top plate penetrations-garage-west wall -LIB bracing all locations per plans -(2) 2x4 per plans at mud entry and owner entry, per plans -properly support 2nd floor stair landing -3” SCH 40 steel column at pier location “A” stair wall per plans -Nail exterior sheathing per plans 6” edge, 12” field -Install basement egress window per plans
All Rough Inspection - Residential Failed 1/22/2021 1/22/2021 01/22/2021
Misc
Corrective Action Required
01/21/2021
***OK to insulate -3” SCH 40 steel column at pier location “A” stair wall per plans-Provide clarification as plans show (3) 2x4 and schedule calls for SCH 40 column—Address also that current 2x4 post is only supporting 1 member of double joist carrying point load from above -Nail exterior sheathing per plans 6” edge, 12” field-check SW corner seam and edges by egress window and seams on west side -Install basement egress window per plans
All Rough Inspection - Residential Failed 1/25/2021 1/25/2021 01/25/2021
Misc
Corrective Action Required
01/22/2021
***OK to insulate and Rock -Install basement egress window per plans
Sewer Service Inspection - R Passed 1/29/2021 (Ready Now) 1/29/2021 01/29/2021
Water Service Inspection - R Partial 1/29/2021 1/29/2021 01/29/2021
Misc
Informational
01/29/2021
-PARTIAL INSPECTION ON PEX FROM HOUSE ENTRANCE TO MID POINT FRONT YARD WHERE CONNECTION TO COPPER WILL TAKE PLACE
Water Service Inspection - R Passed 2/1/2021 (9:00) 2/1/2021 02/01/2021
Misc
Resolved
02/01/2021
-PARTIAL INSPECTION ON PEX FROM HOUSE ENTRANCE TO MID POINT FRONT YARD WHERE CONNECTION TO COPPER WILL TAKE PLACE
Driveway Inspection Passed 3/22/2021 3/22/2021 03/23/2021
Misc
Informational
03/23/2021
On Monday, 3-22-2021. I performed a driveway inspection at the property and passed the inspection for placement of concrete.
Sidewalk Inspection Passed 3/22/2021 3/22/2021 03/23/2021
Misc
Informational
03/23/2021
On Monday, 3-22-2021. I performed a sidewalk inspection and passed the inspection for concrete placement.
All Rough Inspection - Residential Passed 4/22/2021 4/22/2021 04/22/2021
Misc
Resolved
04/22/2021
Occupancy Inspection - Codes Residential Failed 4/22/2021 4/22/2021 04/22/2021
Misc
Corrective Action Required
04/22/2021
-Update plans, plot plan on permit from covered patio to covered deck -Final grade and sod -Splash blocks at all sump pump and downspout locations - seal all penetrations in siding, seal along top of AC disconnect and meter can -Guardrail at front porch, more than 30” from grade -Install spindles at 2nd floor guardrail -Install basement egress window ladder -Cap open breaker location at sub panel -Reattach fallen HVAC duct bracket NE side basement
Plot Plan Inspection Passed 05/19/2021
Erosion Control Inspection Residential Passed 05/19/2021
Occupancy Inspection - Codes Residential Full C of O 5/19/2021 5/19/2021 05/19/2021
Misc
Resolved
05/19/2021
Documents & Images
Date Uploaded File Type Document Name
09/30/2020 Application Form H4 #60 - PERMIT APPLICATION
09/30/2020 LOT 60 FINAL
09/30/2020 H4 #60 - Riverside - Modern Farm House - Sheets- signed
09/30/2020 400634
09/30/2020 H4 #60 - TRUSS LAYOUT
10/05/2020 Drawing APPROVED TRUSS LAYOUT
10/05/2020 Specifications APPROVED TRUSS PACKAGE
10/05/2020 Plans APPROVED HOUSE PLANS AND ELEVATIONS
10/06/2020 Receipt Receipt for transaction:2020-006738
10/06/2020 Letter DS Building Permit
10/12/2020 Lot 60 Hawthorn Ridge Footing Inspection
10/13/2020 Letter INSPECTION SUMMARY
10/22/2020 Lot 60 Hawthorn Ridge Wall Inspection
11/13/2020 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/21/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/22/2021 60 Hawthorne Ridge Support at footing letter
01/25/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
04/22/2021 Letter INSPECTION SUMMARY
04/22/2021 Letter INSPECTION SUMMARY
05/13/2021 LOT 60 FINAL 5-11-2021
05/13/2021 H4 #60 - Riverside - Modern Farm House - A1-A3 REVISION- signed
05/13/2021 Approved Plans approved suppl. page to plans
05/18/2021 LOT 60 FINAL 5-11-2021
05/19/2021 Plot Plan APPROVED PLOT PLAN
05/19/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter Field Certificate of Occupancy
05/19/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home