Summary
PRRES20202579
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
08/26/2020
09/10/2020
09/03/2021
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
C.M. MOSE & SON, Address:6603 ROYAL ST BLDG E, Phone:(816) 781-4707  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARKHOMES.MARK@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/02/2020 09/08/2020
Kim Brennan
06 Designate use of each room or space
Corrective Action Required
08/31/2020

Designate use of each room or space including but not limited to; basement storage, garages, and attic areas intended for storage space. Including all bathroomsa and laundry room
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
08/31/2020

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide square footage for screened in deck
Plot Plan Review Approved 09/02/2020 09/01/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,007.11 $1,007.11 Paid 09/10/2020
Right of Way Permit Fee $80.00 $80.00 Paid 09/10/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/10/2020
8331507-Sewer Connection Fee $510.00 $510.00 Paid 09/10/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 09/10/2020
Water Meter Fee $455.54 $455.54 Paid 09/10/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 11/9/2020 11/09/2020
Misc
Corrective Action Required
11/09/2020
Provide positive or neutral slope for interior under slab drain
Erosion Control Inspection Residential Failed 11/09/2020
Misc
Corrective Action Required
11/09/2020
-Erosion control requires continuous maintenance. Repair damage sections within two business days -Immediate Street clean up required
Erosion Control Inspection Residential Failed 11/13/2020 11/13/2020 11/13/2020
Misc
Corrective Action Required
11/09/2020
-Immediate Street clean up required
Underslab Plumbing Inspection - Residential Passed 11/13/2020 11/13/2020 11/13/2020
Misc
Resolved
11/13/2020
Provide positive or neutral slope for interior under slab drain
Rough Framing Inspection - Residential Failed 1/28/2021 01/28/2021
Misc
Corrective Action Required
01/28/2021
-Nail sheathing to sill plates w/8d@3" oc; nail sheathing to lvl w/8"@3" grid pattern
Gas Service Inspection - Residential Passed 2/22/2021 2/22/2021 02/22/2021
All Rough Inspection - Residential Failed 2/22/2021 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/22/2021
FRAMING: -Nail garage PFH sheathing to sill plates w/8d@3” oc -Fb all floor/ceiling penetrations; seal return air space penetrations; -Over notched ceiling joists at living room lvl support -Install security blocking for rear exterior door -Fb double stud wall at stair vertically into 10 ft or less sections; fb basement wall vertically at 10 ft or less; fb basement wall from soffit -Complete ceiling fur down in closet adjacent to stair and Fb as required; pan off return air space from the ceiling space MECHANICAL: -Vent bath fans -Unblock return air space at front basement bedroom closet and pan off return air space from ceiling space&soffit (check throughout the basement) **OK TO INSULATE
Electrical Service Inspection Failed 2/22/2021 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/22/2021
-Screw in the service main bonding screw
All Rough Inspection - Residential Passed 3/2/2021 3/2/2021 03/02/2021
Misc
Resolved
03/02/2021
FRAMING: -Nail garage PFH sheathing to sill plates w/8d@3” oc -Fb all floor/ceiling penetrations; seal return air space penetrations; -Over notched ceiling joists at living room lvl support -Install security blocking for rear exterior door -Fb double stud wall at stair vertically into 10 ft or less sections; fb basement wall vertically at 10 ft or less; fb basement wall from soffit -Complete ceiling fur down in closet adjacent to stair and Fb as required; pan off return air space from the ceiling space MECHANICAL: -Vent bath fans -Unblock return air space at front basement bedroom closet and pan off return air space from ceiling space&soffit (check throughout the basement) **OK TO INSULATE
Electrical Service Inspection Passed 3/2/2021 3/2/2021 03/02/2021
Misc
Resolved
03/02/2021
-Screw in the service main bonding screw
Sewer Service Inspection - R Passed 3/9/2021 (1:00) 3/9/2021 03/09/2021
Water Service Inspection - R Passed 3/10/2021 (1:00) 3/10/2021 03/10/2021
Driveway Inspection Partial 3/16/2021 3/16/2021 03/16/2021
Misc
Informational
03/16/2021
Driveway - forms and materials passed pre-inspection.
Sidewalk Inspection Partial 3/16/2021 3/16/2021 03/16/2021
Misc
Informational
03/16/2021
Sidewalk - forms and materials passed pre-inspection.
Sidewalk Inspection Partial 3/30/2021 3/30/2021 03/30/2021
Misc
Informational
03/16/2021
Sidewalk - forms and materials passed pre-inspection.
Sidewalk Inspection Passed 4/1/2021 4/1/2021 04/01/2021
Misc
Informational
03/30/2021
Sidewalk - forms and materials passed pre-inspection.
Misc
Informational
04/01/2021
Sidewalk - appears to pass inspection.
Driveway Inspection Passed 3/29/2021 3/29/2021 04/02/2021
Misc
Informational
03/16/2021
Driveway - forms and materials passed pre-inspection.
Misc
Informational
04/02/2021
Driveway - passed inspection.
Plot Plan Inspection Passed 7/21/2021 7/21/2021 07/21/2021
Piers/Caissons Inspection - Residential Passed 08/20/2021
Informational
08/20/2021
PIERS APPROVED BY ENGINEER
Footing Inspection - Residential Passed 08/20/2021
Informational
08/20/2021
FOOTING APPROVED BY ENGINEER
Rough Framing Inspection - Residential Passed 08/20/2021
Misc
Resolved
08/20/2021
-Nail sheathing to sill plates w/8d@3" oc; nail sheathing to lvl w/8"@3" grid pattern
Erosion Control Inspection Residential Passed 08/20/2021
Misc
Resolved
08/20/2021
-Immediate Street clean up required
Occupancy Inspection - Codes Residential Failed 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/20/2021
-Obtain lawn irrigation permit and submit the backflow test report to city -Water meter pit is filed with water. Provide verification that water line is not leaking -Final grade, sod, downspout and sump pump extensions -Seal exterior wall penetrations at sump pump discharge and AC line -Move the master bathroom receptacle box spark ring flush with combustible wall finish -Mid-stair landing depth is less than 3 ft -Seal foundation wall penetration at water service -Securely faster water heater circuit -Locate and make accessible the sewer clean out
Occupancy Inspection - Codes Residential Full C of O 9/3/2021 9/3/2021 09/03/2021
Misc
Resolved
09/03/2021
-Water meter pit is filed with water. Provide verification that water line is not leaking -Final grade, sod, downspout and sump pump extensions -Seal exterior wall penetrations at sump pump discharge and AC line -Move the master bathroom receptacle box spark ring flush with combustible wall finish -Mid-stair landing depth is less than 3 ft -Seal foundation wall penetration at water service -Securely faster water heater circuit -Locate and make accessible the sewer clean out
Documents & Images
Date Uploaded File Type Document Name
08/26/2020 Application Form Permit Application and license tax form
09/01/2020 Plot Plan Approved Plot Plan
09/01/2020 Letter Codes Residential Plan Review
09/08/2020 Approved Plans Approved Drawings
09/10/2020 Receipt Receipt for transaction:2020-006117
09/10/2020 Letter DS Building Permit
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/11/2020 M L Crose 4700 NE Saratoga Ct LSMO Monticello Lot 93 Trumark Permit 2020-2579 3rd Party Footing Inspection Report 10-28-20
11/11/2020 M L Crose 4700 NE Saratoga Ct LSMO Monticello Lot 93 Trumark Permit 2020-2579 3rd Party Pier Inspection Report 10-22-20
11/13/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/02/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/03/2021 Letter Codes Final Certificate of Occupancy
09/03/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home