Summary
PRRES20202213
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT
08/07/2020
08/14/2020
04/23/2021
Locations
Contacts
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
PAUL@BELLAHHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 08/12/2020 08/14/2020
Kim Brennan
Building elevations
Corrective Action Required
08/11/2020

Existing and finished elevations at building footprint corners must be provided on the plot plan. Please provide this information for the front corners of the building
Basement opening elevations
Corrective Action Required
08/11/2020

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. Per the approved MDP the front MBOE shoudl be 952.60 and the rear should be 948.30.
Basement egress
Corrective Action Required
08/11/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Planning Review (RES) Approved 08/14/2020 08/13/2020
Jennifer Thompson
Planning Review (RES) Rejected 08/12/2020 08/12/2020
Jennifer Thompson
Miscellaneous Correction
Corrective Action Required
08/12/2020

Label the exterior building materials for the side elevations.
Residential Plan Review Approved 08/12/2020 08/10/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $970.50 $970.50 Paid 08/18/2020
$1,077.12
Right of Way Permit Fee $80.00 $80.00 Paid 08/18/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/11/2020
$1,077.12
8331507-Sewer Connection Fee $480.00 $480.00 Paid 08/18/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 08/18/2020
Water Meter Fee $455.54 $455.54 Paid 08/18/2020
New Longview Road and Bridge Escrow $1,077.12 $1,077.12 Paid 08/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 9/3/2020 09/04/2020
Misc
Informational
09/04/2020
- 3rd PARTY FOOTING SIGNED & SEALED BY DAVID AINSWORTH - - UFER LOCATION NOT NOTED IN COMMENTS -
Sewer Service Inspection - R Passed 9/18/2020 (2:00) 9/18/2020 09/18/2020
Erosion Control Inspection Residential Failed 9/21/2020 9/21/2020 09/21/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/21/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Failed 9/21/2020 9/21/2020 09/21/2020
Misc
Corrective Action Required
09/21/2020
INSPECTION DENIED - EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - POST ADDRESS
Water Service Inspection - R Passed 9/21/2020 09/21/2020
Underslab Plumbing Inspection - Residential Passed 9/24/2020 9/24/2020 09/24/2020
Misc
Resolved
09/24/2020
INSPECTION DENIED - EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - POST ADDRESS
Erosion Control Inspection Residential Failed 11/06/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
09/21/2020
-Immediate Street clean up required
All Rough Inspection - Residential Failed 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/28/2020
-12” oc fastening stud to stud and abutting studs at brace wall corners -Unable to verify method PFG fastening at portal frame, install interior tension straps and fasten top plate to header with two rows of 16D sinkers at 3” OC per 2/S3.0 also provide washers & nuts at PFG anchor bolt locations -Joist hangers at ceiling joists connection to double 2 x 10 and at header for attic access, garage -sheath garage/dwelling separation wall per plan -4x4 structural post per plan, second floor cantilever and stairs under LVL at entry area -double king studs at openings in 2x6 walls per plan -Continue fire blocking vertical to horizontal above window in stairwell -Continue fire blocking vertical to horizontal, bedroom two closet exterior wall -Continue fire blocking vertical to horizontal, bedroom three exterior wall left of the window -Exterior wall bottom plates fastening 8” oc per plan -King stud to head or fastening per code -Anchor steel columns -Three studs stairs wall, basement -two 1 3/4x9 1/2 LVL, stairs load bearing wall basement -Joist hangers at headered Joists, basement -repair/replace solid blocking damaged or removed by other trades at beams and where joists run parallel to foundation per plan
Electrical Service Inspection Passed 12/28/2020 12/28/2020 12/28/2020
Gas Piping Inspection - Residential Passed 12/28/2020 12/28/2020 12/28/2020
Gas Service Inspection - Residential Passed 12/28/2020 12/28/2020 12/28/2020
All Rough Inspection - Residential Passed 1/4/2021 1/4/2021 01/04/2021
Misc
Resolved
01/04/2021
-12” oc fastening stud to stud and abutting studs at brace wall corners -Unable to verify method PFG fastening at portal frame, install interior tension straps and fasten top plate to header with two rows of 16D sinkers at 3” OC per 2/S3.0 also provide washers & nuts at PFG anchor bolt locations -Joist hangers at ceiling joists connection to double 2 x 10 and at header for attic access, garage -sheath garage/dwelling separation wall per plan -4x4 structural post per plan, second floor cantilever and stairs under LVL at entry area -double king studs at openings in 2x6 walls per plan -Continue fire blocking vertical to horizontal above window in stairwell -Continue fire blocking vertical to horizontal, bedroom two closet exterior wall -Continue fire blocking vertical to horizontal, bedroom three exterior wall left of the window -Exterior wall bottom plates fastening 8” oc per plan -King stud to head or fastening per code -Anchor steel columns -Three studs stairs wall, basement -two 1 3/4x9 1/2 LVL, stairs load bearing wall basement -Joist hangers at headered Joists, basement -repair/replace solid blocking damaged or removed by other trades at beams and where joists run parallel to foundation per plan
Erosion Control Inspection Residential Failed 01/12/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/06/2020
-Erosion control requires continuous maintenance. Repair damage sections within two business days -Immediate Street clean up required -No further inspections until issues are resolved
Sidewalk Inspection Partial 3/30/2021 03/30/2021
Misc
Informational
03/30/2021
Forms were placed and aggregate was present, but still needs to compacted. Also needs to remove piping underneath the sidewalk. Talked with Tim about those issues along with sidewalk finish and cure requirements. RP 3-30-21
Sidewalk Inspection Passed 4/9/2021 4/9/2021 04/09/2021
Misc
Informational
03/30/2021
Forms were placed and aggregate was present, but still needs to compacted. Also needs to remove piping underneath the sidewalk. Talked with Tim about those issues along with sidewalk finish and cure requirements. RP 3-30-21
Misc
Informational
04/09/2021
Finished sidewalk meets LS and ADA specs. RP 4-9-21
Occupancy Inspection - Codes Residential Failed 4/14/2021 4/14/2021 04/14/2021
Misc
Corrective Action Required
04/14/2021
-Maintenance of erosion control methods is required until sod is in place -Final grade and sod -Remove trash and construction debris from site -Immediate street cleanup required, also remove debris from curb/gutter -Provide tamper resistant Schrader valve caps at condensing unit -Seal all exterior penetrations, top and sides of AC disconnect, top and sides of electric meter enclosure and exterior lighting fixtures exposed to the elements -Downspouts and sump piping to discharge minimum 36 inches from foundation -Carbon monoxide alarm required outside master bedroom
Occupancy Inspection - Codes Residential Temporary C of O 4/21/2021 4/21/2021 04/21/2021
Misc
Corrective Action Required
04/14/2021
-Maintenance of erosion control methods is required until sod is in place -Final grade and sod -sump piping to discharge minimum 36 inches from foundation TCO valid through May 21, 2021
Occupancy Inspection - Codes Residential Full C of O 4/23/2021 4/23/2021 04/23/2021
Misc
Resolved
04/23/2021
-Maintenance of erosion control methods is required until sod is in place -Final grade and sod -sump piping to discharge minimum 36 inches from foundation TCO valid through May 21, 2021
Documents & Images
Date Uploaded File Type Document Name
08/07/2020 Letter Permit Application and license tax form
08/07/2020 BHPPergolaNorthhamptonLot103Sealed
08/12/2020 Plot Plan Approved Plot Plan
08/14/2020 Drawing Approved Drawings
08/14/2020 Letter DS Building Permit
08/17/2020 20200817S162310
08/18/2020 Receipt Receipt for transaction: 2020-005366
09/03/2020 3221 SW Mary St LSMO Pergola Park Lot 103 Bella P 2020-2213 3rd Party Footing Inspection 9-3-20
09/04/2020 Letter INSPECTION SUMMARY
09/18/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/24/2020 Letter INSPECTION SUMMARY
09/24/2020 Letter INSPECTION SUMMARY
11/06/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter Codes Residential Plan Review
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/30/2020 Letter 3221 SW Mary Street - Structural Inspection Letter (December 29 2020)
01/04/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter Codes Temporary Certificate of Occupancy
04/23/2021 Letter Codes Final Certificate of Occupancy
04/23/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home