Summary
PRRES20200103
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY UNFINISHED BASEMENT COVERED DECK
01/14/2020
01/29/2020
12/31/2020
Locations
Contacts
SPELLERBERG ENTERPRISES LLC, Address:613 NE VIEWPARK DR, Phone:(816) 550-5535  
SPELLERBERGENTERPRISES@GMAIL.COM  
NEW HEIGHTS ELECTRIC LLC, Address:P O BOX 163, Phone:(816) 625-9504  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/16/2020 01/17/2020
Steve Conrick
Residential Plan Review Approved 01/16/2020 01/17/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,369.34 $1,369.34 Paid 01/29/2020
8331507-Sewer Connection Fee $480.00 $480.00 Paid 01/29/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 01/29/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 01/29/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 01/29/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/29/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 3/5/2020 (8:00) 3/5/2020 03/05/2020
Misc
Corrective Action Required
03/05/2020
- No city approved plans on site -
Footing Inspection - Residential Passed 3/5/2020 3/5/2020 03/05/2020
Misc
Resolved
03/05/2020
Underslab Plumbing Inspection - Residential Passed 4/8/2020 4/8/2020 04/08/2020
Erosion Control Inspection Residential Failed 4/8/2020 04/08/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/08/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Sewer Service Inspection - R Passed 4/8/2020 4/8/2020 04/08/2020
Water Service Inspection - R Passed 4/10/2020 4/10/2020 04/10/2020
Piers/Caissons Inspection - Residential Passed 6/25/2020 (1:00) 6/25/2020 06/25/2020
Erosion Control Inspection Residential Failed 7/27/2020 07/27/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
04/08/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/27/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Electrical Service Inspection Passed 7/27/2020 07/27/2020
Gas Piping Inspection - Residential Passed 7/27/2020 07/27/2020
Gas Service Inspection - Residential Passed 7/27/2020 07/27/2020
All Rough Inspection - Residential Failed 7/27/2020 7/27/2020 07/27/2020
Misc
Corrective Action Required
07/27/2020
- PROVIDE FLASHING HORIZONTAL TRIM ABOVE GARAGE DOOR - - PROVIDE 5/8 ANCHOR BOLTS PFH PORTAL FRAME GARAGE PER PLAN - - SECURE BATH EXHAUST WITH METALLIC TAPE - - SECURE 2" DWV AT MIDPOINT - - COMPLETE SNOW BLOCKING MASTER CLOSET & TUB - - PROVIDE STRUT PER PLAN AT RIDGE NW BEDROOM - - -PROVIDE JOIST HANGERS ABOVE BREAKFAST NOOK - - HEADER OFF JOIST AT DWV GREAT ROOM - - TIGHTEN ANCHOR BOLT LANDING - - PROVIDE ANCHOR BOLTS SCH 40 COLUMNS BASEMENT - - PROVIDE SOLID BLOCKING BETWEEN JOIST AT 36" OC 48" OF 3 JOIST SPACES PARRALLEL TO FOUNDATION WALL PER PLAN -
All Rough Inspection - Residential Passed 7/31/2020 7/31/2020 07/31/2020
Misc
Resolved
07/31/2020
Driveway Inspection Partial 9/22/2020 9/22/2020 09/22/2020
Misc
Informational
09/22/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 9/28/2020 9/28/2020 10/05/2020
Misc
Informational
09/22/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 11/4/2020 (P.M.) 11/4/2020 11/04/2020
Misc
Informational
11/04/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 11/11/2020 11/11/2020 11/11/2020
Misc
Informational
11/04/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Plot Plan Inspection Passed 12/16/2020 12/16/2020 12/16/2020
Occupancy Inspection - Codes Residential Failed 12/16/2020 12/16/2020 12/16/2020
Misc
Corrective Action Required
12/16/2020
-No setback allowed with combustible surface - front dining room receptacles at wall trim -Cover plates on all switches and receptacles - kitchen -label all dedicated receptacles in garage and unfinished basement as not GFCI protected -Complete spindle install at 2nd floor stairs, a 4” sphere cannot pass through -Install light fixtures at top of basement stairs -AFCI/GFCI breaker for disposal/dishwasher stuck in off position -GFCI protection required for receptacles in light fixtures in unfinished basement -obtain lawn irrigation system permit -Splash blocks at all downspout discharge locations, minimum 36” from foundation -Secure AC electrical whip within 12” of disconnect -AC compressor requires min 31.9 ampacity to 50 amp max over current protection
Occupancy Inspection - Codes Residential Failed 12/21/2020 12/21/2020 12/21/2020
Misc
Corrective Action Required
12/16/2020
-GFCI protection required at dishwasher -Splash blocks at all downspout discharge locations, minimum 36” from foundation
Occupancy Inspection - Codes Residential Full C of O 12/31/2020 12/31/2020 12/31/2020
Misc
Resolved
12/31/2020
Documents & Images
Date Uploaded File Type Document Name
01/29/2020 Receipt Receipt for transaction: 2020-000350
01/29/2020 Letter DS Building Permit
01/30/2020 Plot Plan DOC013020-01302020084010
03/05/2020 Letter INSPECTION SUMMARY
03/05/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/27/2020 Letter INSPECTION SUMMARY
07/31/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
11/11/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
12/31/2020 Letter Field Certificate of Occupancy
12/31/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: