PRRES20192761
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - PARTIAL FINISHED BASEMENT
09/25/2019
10/18/2019
07/14/2020
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
JEFF.BOEHM@ZVACEKCONSTRUCTION.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/27/2019 10/14/2019
Dylan Eppert
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
09/25/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) ***COVERED DECK SQUARE FOOTAGE MUST BE ON CONSTRUCTION DRAWINGS.***
Plot Plan Review Approved 09/27/2019 10/02/2019
Dylan Eppert
Property boundary
Corrective Action Required
09/25/2019

Property boundary distances and bearings, as shown on the recorded plat, must be provided on the plot plan. ***EAST SIDE OF PLOT PLAN DOESN'T SHOW BEARING.***
Right-of-way
Corrective Action Required
09/25/2019

The right-of-way with dimensions must be provided on the plot plan.
Basement egress
Corrective Action Required
09/25/2019

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Sidewalks
Corrective Action Required
09/25/2019

Sidewalks with dimensions must be provided on the plot plan. ***SIDEWALK IS SHOWN ON THE MDP HOWEVER NOT SHOWN ON PLOT PLAN PLEASE CLARIFY.***
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,276.46 $1,276.46 Paid 10/18/2019
8331507-Sewer Connection Fee $630.00 $630.00 Paid 10/18/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 10/18/2019
Water Meter Fee $425.02 $425.02 Paid 10/18/2019
Right of Way Permit Fee $80.00 $80.00 Paid 10/18/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/18/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/28/2019 10/28/2019 at 1:45 PM 10/28/2019
Foundation Inspection - Residential Failed 11/13/2019 (8:00) 11/13/2019 at 9:55 AM 11/13/2019
Misc
Corrective Action Required
11/13/2019
-REBARS NOT INSTALLED PER PLAN. 10 FT WALL REQUIRES VERT. REBARS @ 8" OC. YOU HAVE WALL EXCEEDING THIS HEIGHT. GET THE ENGINEER INVOLVED
Foundation Inspection - Residential Passed 11/18/2019
Misc
Resolved
11/18/2019
-REBARS NOT INSTALLED PER PLAN. 10 FT WALL REQUIRES VERT. REBARS @ 8" OC. YOU HAVE WALL EXCEEDING THIS HEIGHT. GET THE ENGINEER INVOLVED
Underslab Plumbing Inspection - Residential Passed 11/25/2019 11/25/2019 at 8:15 AM 11/25/2019
Sewer Service Inspection - R Passed 11/25/2019 (1:00) 11/25/2019 at 1:50 PM 11/25/2019
Water Service Inspection - R Partial 11/25/2019 (1:00) 11/25/2019 11/25/2019
Water Service Inspection - R Passed 12/3/2019 (10:45) 12/3/2019 at 11:05 AM 12/03/2019
Piers/Caissons Inspection - Residential Passed 1/16/2020 1/16/2020 at 9:05 AM 01/16/2020
Electrical Service Inspection Passed 1/31/2020 1/31/2020 01/31/2020
Gas Service Inspection - Residential Passed 1/31/2020 1/31/2020 01/31/2020
All Rough Inspection - Residential Failed 1/31/2020 1/31/2020 at 3:20 PM 01/31/2020
Misc
Corrective Action Required
01/31/2020
**PROVIDE CITY-STAMPED PLAN ON SITE FRAMING: -Provide full stud support for (2)2x12 beam at front exterior wall of front bedroom -Install security blocking at rear exterior door -Anchor sill plates within 12” of breaks -Install hanger for ceiling joist at attic access -Support garage hip rafter at top -Provide full support underneath double joist above laundry -Seal all penetrations of return air space at studs and ceiling joists -Install double joist at stair floor opening -Toe nail all joists to sill plates -Complete framing at basement shower and fb as required -Steel column in unfinished basement below front bedroom not placed at correct location MECHANICAL: -Tape dryer duct joint -Pan off return air from I beam soffit at rear basement bedroom wall PLUMBING: -Protect plumbing in master closet. Use BOCA plates at bottom and top wall plate -Strap exterior wall and interior bearing wall top plates where bored more than 50% ELECTRICAL: -Protect wiring where within 1.25” of framing surface in master bedroom -Install a wall receptacle for wall longer than 2 ft at 2nd fl front bedroom **OK TO INSULATE
All Rough Inspection - Residential Failed 2/10/2020 2/10/2020 at 9:30 AM 02/10/2020
Misc
Corrective Action Required
01/31/2020
FRAMING: -Install double joist at stair floor opening **Code requires double header joist for floor frame opening. You can get the engineer to address this. In case the engineer also requires the double header joist, then you will have to redo the gas piping and retest. -Toe nail all joists to sill plates **Not done PLUMBING: -Strap exterior wall and interior bearing wall top plates where bored more than 50%
All Rough Inspection - Residential Passed 2/14/2020 2/14/2020 02/14/2020
Misc
Informational
02/14/2020
FRAMING: -Install double joist at stair floor opening **Code requires double header joist for floor frame opening. You can get the engineer to address this. In case the engineer also requires the double header joist, then you will have to redo the gas piping and retest DOUBLE JOIST INSTALLED GAS METER INSTALLED NO GAUGE FOR TEST 2/14/20 13:18
Gas Piping Inspection - Residential Passed 2/19/2020 2/19/2020 at 2:15 PM 02/19/2020
Sidewalk Inspection Partial 2/28/2020 (Ready Now) 2/28/2020 02/28/2020
Misc
Informational
02/28/2020
Sidewalk Pre inspection of forms & materials passed.
Driveway Inspection Failed 2/28/2020 (Ready Now) 2/28/2020 03/03/2020
Misc
Corrective Action Required
03/03/2020
Pre inspection of driveway failed due to the width exceeding approach design and construction specifications. Width of approach was over 38 feet I informed contractor that the driveway was out of compliance on 2/28/20 he said he would correct it. Drive was measured again on 3/3/20 width of drive was still over 38 feet. I called the Contractor to let him know that the driveway had failed .
Driveway Inspection Partial 3/10/2020 03/10/2020
Misc
Corrective Action Required
03/03/2020
Pre inspection of driveway failed due to the width exceeding approach design and construction specifications. Width of approach was over 38 feet I informed contractor that the driveway was out of compliance on 2/28/20 he said he would correct it. Drive was measured again on 3/3/20 width of drive was still over 38 feet. I called the Contractor to let him know that the driveway had failed .
Misc
Informational
03/10/2020
Driveway - forms and materials passed pre-inspection.
Driveway Inspection Passed 03/18/2020
Misc
Corrective Action Required
03/10/2020
Pre inspection of driveway failed due to the width exceeding approach design and construction specifications. Width of approach was over 38 feet I informed contractor that the driveway was out of compliance on 2/28/20 he said he would correct it. Drive was measured again on 3/3/20 width of drive was still over 38 feet. I called the Contractor to let him know that the driveway had failed .
Misc
Informational
03/10/2020
Driveway - forms and materials passed pre-inspection.
Misc
Informational
03/18/2020
Driveway - passed final inspection.
Sidewalk Inspection Passed 3/10/2020 03/18/2020
Misc
Informational
02/28/2020
Sidewalk Pre inspection of forms & materials passed.
Misc
Informational
03/18/2020
Sidewalk - passed final inspection.
Occupancy Inspection - Codes Residential Failed 7/1/2020 7/1/2020 at 10:15 AM 07/01/2020
Misc
Corrective Action Required
07/01/2020
-Obtain lawn irrigation permit -Lower water meter to grade. Make sure the meter to lid distance is 14”-18” -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Secure AC whip -Smoke alarm at rear corner bedroom not interconnected with others -Install hammer arrestor for dishwasher -Screw in the exterior door embedded brace into studs -Garage door not self closing -Extend the wall to floor at garage boxed out wall or install 1/2” gypsum underneath -Pendant light is located within the master bath tub zone -Provide clean out for furnace condensate drain -Remove all steel ties from foundation wall -Complete plumbing for master bathroom tub
Occupancy Inspection - Codes Residential Temporary C of O 7/10/2020 7/10/2020 at 2:05 PM 07/10/2020
Misc
Corrective Action Required
07/01/2020
-Lower water meter to grade. Make sure the meter to lid distance is 14”-18” **Grading around the meter must be per plot plan. Lower the meter down to final grade -Install the sewer tracer wire and port
Occupancy Inspection - Codes Residential Full C of O 7/14/2020 7/14/2020 at 7:45 AM 07/14/2020
Misc
Resolved
07/14/2020
-Lower water meter to grade. Make sure the meter to lid distance is 14”-18” **Grading around the meter must be per plot plan. Lower the meter down to final grade -Install the sewer tracer wire and port
Documents & Images
Date Uploaded File Type Document Name
09/25/2019 Letter Codes Residential Plan Review
10/01/2019 Letter Codes Residential Plan Review
10/18/2019 Receipt Receipt for transaction: 2019-006874
10/18/2019 Letter DS Building Permit
10/18/2019 Plot Plan DOC101819-003
10/28/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
11/25/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
01/16/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
02/10/2020 Letter INSPECTION SUMMARY
02/14/2020 Letter INSPECTION SUMMARY
02/19/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/10/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter Codes Temporary Certificate of Occupancy
07/14/2020 Letter Codes Final Certificate of Occupancy
07/14/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home