Permit Application Status

PRRES20191536


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20191536
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
06/13/2019
06/18/2019
09/28/2020
Locations
Contacts
SCOTT PRIER HOMES LLC, Address:404 SE HACKAMORE DR, Phone:(816) 509-8302  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
HOLSEY ELECTRIC, Inc, Address:1637 NW 100 RD, Phone:(816) 697-2112  
SUBURBAN PLUMBING, Address:20124 HOPS CREEK DR, Phone:(816) 985-0259  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/17/2019 06/17/2019
Steve Conrick
Residential Plan Review Approved 06/17/2019 06/13/2019
Kim Brennan
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
06/13/2019

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) no detector shown inside or outside of bedrroom/study
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
06/13/2019

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) does not specify uninterrupted height
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,294.86 $1,294.86 Paid 06/18/2019
Right of Way Permit Fee $80.00 $80.00 Paid 06/18/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/18/2019
8331507-Sewer Connection Fee $600.00 $600.00 Paid 06/18/2019
Water Tap Fee $3,409.00 $3,409.00 Paid 06/18/2019
Water Meter Fee $408.37 $408.37 Paid 06/18/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/28/2019 (2:00) 6/28/2019 at 2:15 PM 06/28/2019
Sewer Service Inspection - R Passed 7/19/2019 (1:00) 7/19/2019 at 1:45 PM 07/19/2019
Water Service Inspection - R Partial 7/19/2019 (1:00) 7/19/2019 07/19/2019
Erosion Control Inspection Residential Failed 7/24/2019 07/24/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/24/2019
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Passed 7/24/2019 7/24/2019 at 9:40 AM 07/24/2019
Water Service Inspection - R Passed 7/26/2019 (1:00) 7/26/2019 at 12:55 PM 07/26/2019
Erosion Control Inspection Residential Failed 7/26/2019 07/26/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/24/2019
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Piers/Caissons Inspection - Residential Passed 8/14/2019 (9:45) 8/14/2019 at 10:10 AM 08/14/2019
Erosion Control Inspection Residential Failed 9/12/2019 09/12/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/26/2019
DEFICIENT EROSION CONTROL INSTALLATION. -EROSION CONTROL IS NOT INSTALLED AROUND THE LOT -SILT FENCE ALONG THE STREET IS TORN DOWN AND MUST BE REPLACED -MUD AND DIRT SHALL BE CLEANED OFF THE STREET -CLEAN OUT MUD DEPOSIT AT GUTTY BUDDY **EROSION CONTROL SHALL BE IN COMPLIANCE IN TWO BUSINESS DAYS **INSPECTION DENIED
All Rough Inspection - Residential Failed 9/12/2019 9/12/2019 09/12/2019
Misc
Corrective Action Required
09/12/2019
**INSPECTION DENIED DUE TO EROSION CONTROL DEFICIENCY
Gas Service Inspection - Residential Failed 10/24/2019 10/24/2019 10/24/2019
Misc
Corrective Action Required
10/24/2019
-No pressure
Electrical Service Inspection Passed 10/24/2019 10/24/2019 10/24/2019
Erosion Control Inspection Residential Failed 10/24/2019 10/24/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/12/2019
DEFICIENT EROSION CONTROL INSTALLATION. -EROSION CONTROL IS NOT INSTALLED AROUND THE LOT -CLEAN OUT MUD DEPOSIT AT GUTTY BUDDY AND CLEAN OFF STREET **EROSION CONTROL SHALL BE IN COMPLIANCE IN TWO BUSINESS DAYS **NO INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
All Rough Inspection - Residential Failed 10/24/2019 10/24/2019 at 10:00 AM 10/24/2019
Misc
Corrective Action Required
09/12/2019
**EROSION CONTROL SHALL BE IN COMPLIANCE IN TWO BUSINESS DAYS **NO INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE FRAMING: -Block between garage ceiling joists under exterior wall line -Fb duct chase from joist space -Support top of hip above 1st fl bedroom -Security blocking for rear door at hinge side -Install hangers at lvl connections above pantry -Install hangers for joist connections to I beam -Install number of stud support for I beam per plan -Wrong size hangers for 2x10 joists at I beam connections above front dining -Snow-block at step flashing -Support ceiling joist above 2nd fl front bathroom ; also at lvl connections outside laundry/bedroom -Take roof load off non-bearing walls -Add more nailing at ceiling joist&rafter connections; support hips above master bathroom PLUMBING: -Support plumbing above garage at max 4 ft spacing -Move water line min 1” away from the b-vent -Vent trap above living room -Shall insulate the 3” waster stack inside the living rm exterior wall ELECTRICAL: -Install a dedicated 20 amp circuit to the garage and one receptacle per car bay -Protect wiring outside 1st fl bathroom -Secure SE cable within 12” of meter enclosure MECHANICAL: -B-vent undersized. Has 3 equivalent 90 deg bents resulting in 30% reduction in capacity. Reduced capacity is now 140 kbtu -Provide min 1” space between combustible and b-vent **OK TO INSULATE
All Rough Inspection - Residential Failed 11/1/2019 11/1/2019 at 3:00 PM 11/01/2019
Misc
Corrective Action Required
10/24/2019
-Fb duct chase from joist space -Install number of stud support for I beam (beam between living rm and foyer/front dining) per plan **I don't remember how many studs are shown on the plan. There should be min 3 studs at end of the I beam -Take roof load off non-bearing walls **Please install purlins to bearing wall. Max span of #2 2x6 rafter is around 12.5 ft -ADDENUM: provide full stud support under double joist at 1st fl bedroom **OK TO INSULATE
Driveway Inspection Partial 11/6/2019 11/6/2019 11/06/2019
Misc
Informational
11/06/2019
Driveway - forms and materials passed pre-inspection.
All Rough Inspection - Residential Failed 11/8/2019 at 1:15 PM 11/08/2019
Misc
Corrective Action Required
11/01/2019
-Fb duct chase from joist space -Install number of stud support for I beam (beam between living rm and foyer/front dining) per plan **I don't remember how many studs are shown on the plan. There should be min 3 studs at end of the I beam -Provide full stud support under double joist at 1st fl bedroom
All Rough Inspection - Residential Passed 11/14/2019 11/14/2019 at 8:50 AM 11/14/2019
Misc
Resolved
11/14/2019
-Fb duct chase from joist space -Install number of stud support for I beam (beam between living rm and foyer/front dining) per plan **I don't remember how many studs are shown on the plan. There should be min 3 studs at end of the I beam -Provide full stud support under double joist at 1st fl bedroom
Gas Service Inspection - Residential Passed 11/14/2019 11/14/2019 11/14/2019
Misc
Resolved
11/14/2019
-No pressure
Driveway Inspection Passed 11/14/2019
Misc
Informational
11/06/2019
Driveway - forms and materials passed pre-inspection.
Misc
Informational
11/14/2019
Driveway - passed final inspection.
Erosion Control Inspection Residential Passed 09/09/2020
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/09/2020
DEFICIENT EROSION CONTROL INSTALLATION. -EROSION CONTROL IS NOT INSTALLED AROUND THE LOT -CLEAN OUT MUD DEPOSIT AT GUTTY BUDDY AND CLEAN OFF STREET **EROSION CONTROL SHALL BE IN COMPLIANCE IN TWO BUSINESS DAYS **NO INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Occupancy Inspection - Codes Residential Failed 9/9/2020 9/9/2020 09/09/2020
Misc
Resolved
09/09/2020
-CHECK AT FINAL LANDSCAPING REQUIREMENT PER CITY ORDINANCE ALONG THE REAR OF LOT
Misc
Corrective Action Required
09/09/2020
-Fix ground fault condition for rear porch gfci receptacle -Provide a smoke and CO alarm outside 1st fl bedroom -Provide gfci protection for dish washer outlet per NEC 210.8(D). Install dual protection gfi and afci for circuit -Provide AFCI protection for all outlets required per NEC 210.12. All outlets located in the house (except garage, bathroom, unfinished basement, outdoor, attic) shall be afci-protected. Outlets include lighting and receptacle outlets as well. Please read this section of the code
Occupancy Inspection - Codes Residential Failed 9/21/2020 9/21/2020 09/21/2020
Misc
Corrective Action Required
09/09/2020
-Provide AFCI protection for all outlets required per NEC 210.12. All outlets located in the house (except garage, bathroom, unfinished basement, outdoor, attic) shall be afci-protected. Outlets include lighting and receptacle outlets as well. Please read this section of the code **NEED AFCI FOR THE MICROWAVE OUTLET
Occupancy Inspection - Codes Residential Full C of O 9/28/2020 9/28/2020 09/28/2020
Misc
Resolved
09/28/2020
-Provide AFCI protection for all outlets required per NEC 210.12. All outlets located in the house (except garage, bathroom, unfinished basement, outdoor, attic) shall be afci-protected. Outlets include lighting and receptacle outlets as well. Please read this section of the code **NEED AFCI FOR THE MICROWAVE OUTLET
Documents & Images
Date Uploaded File Type Document Name
06/13/2019 Letter Codes Residential Plan Review
06/18/2019 Receipt Receipt for transaction: 2019-003845
06/18/2019 Letter Codes Building Permit
06/19/2019 Plot Plan DOC061919-06192019084547
06/28/2019 Letter INSPECTION SUMMARY
07/19/2019 Letter INSPECTION SUMMARY
07/19/2019 Letter INSPECTION SUMMARY
07/24/2019 Letter INSPECTION SUMMARY
07/26/2019 Letter INSPECTION SUMMARY
07/26/2019 Letter INSPECTION SUMMARY
08/14/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
10/24/2019 Letter INSPECTION SUMMARY
10/24/2019 Letter INSPECTION SUMMARY
10/24/2019 Letter INSPECTION SUMMARY
10/24/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter INSPECTION SUMMARY
11/08/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
09/21/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter Codes Final Certificate of Occupancy
09/28/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home