Summary
PRRES20191322
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED PATIO
05/23/2019
06/06/2019
01/25/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 05/28/2019 06/05/2019
Steve Conrick
Lot elevations
Corrective Action Required
05/28/2019

Existing and finish elevations at all property corners must be provided on the plot plan. *Property corners don't line up with MDP. Call to clearify.
Residential Plan Review Approved 05/28/2019 05/23/2019
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $970.70 $970.70 Paid 06/06/2019
Right of Way Permit Fee $80.00 $80.00 Paid 06/06/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/06/2019
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/06/2019
Water Tap Fee $3,409.00 $3,409.00 Paid 06/06/2019
Water Meter Fee $408.37 $408.37 Paid 06/06/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/14/2019 (2:00) 6/14/2019 at 2:30 PM 06/14/2019
Underslab Plumbing Inspection - Residential Passed 7/19/2019 7/19/2019 07/19/2019
Piers/Caissons Inspection - Residential Passed 8/2/2019 (10:00) 8/2/2019 at 11:30 AM 08/02/2019
Sewer Service Inspection - R Passed 8/5/2019 8/5/2019 at 10:20 AM 08/05/2019
Water Service Inspection - R Partial 8/5/2019 at 10:31 AM 08/05/2019
Water Service Inspection - R Passed 8/9/2019 8/9/2019 at 2:56 PM 08/09/2019
Electrical Service Inspection Passed 9/26/2019 9/26/2019 09/26/2019
Gas Piping Inspection - Residential Passed 9/26/2019 9/26/2019 09/26/2019
All Rough Inspection - Residential Passed 9/26/2019 9/26/2019 09/26/2019
Driveway Inspection Partial 10/25/2019 (A.M.) 10/25/2019 10/25/2019
Misc
Informational
10/25/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 10/31/2019 11/05/2019
Misc
Informational
10/25/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 1/6/2020 1/6/2020 01/06/2020
Misc
Corrective Action Required
01/06/2020
Erosion control needs to be fixed and street/curb needs to be cleaned if all mud and debris -seal exterior light fixtures - two locking devices needed for back sliding door - underneath stair stringers in unfinished basement area need to be fire protected - as graded plot plan needs to be submitted and approved by front counter staff - final grade, side, water discharge needs to be 36” from foundation
Occupancy Inspection - Codes Residential Temporary C of O 1/16/2020 1/16/2020 01/16/2020
Misc
Corrective Action Required
01/06/2020
- as graded plot plan needs to be submitted and approved by front counter staff
Plot Plan Inspection Passed 08/21/2020
Occupancy Inspection - Codes Residential Failed 8/21/2020 8/21/2020 08/21/2020
Misc
Corrective Action Required
08/21/2020
- Schedule reinspect for final c of o after garage currently being used as model office is converted back to garage
Occupancy Inspection - Codes Residential Failed 1/19/2021 1/19/2021 01/19/2021
Misc
Corrective Action Required
08/21/2020
-GARAGE GFCI RECEPTACLES ON E WALL TESTING AS OPEN GROUND
Occupancy Inspection - Codes Residential Full C of O 1/25/2021 1/25/2021 01/25/2021
Misc
Resolved
01/25/2021
Documents & Images
Date Uploaded File Type Document Name
05/28/2019 Letter Codes Residential Plan Review
06/06/2019 Receipt Receipt for transaction: 2019-003315
06/06/2019 Letter Codes Building Permit
06/12/2019 Plot Plan DOC061219-06122019083307
06/14/2019 Letter INSPECTION SUMMARY
07/19/2019 Letter INSPECTION SUMMARY
08/02/2019 Letter INSPECTION SUMMARY
08/05/2019 Letter INSPECTION SUMMARY
08/05/2019 Letter INSPECTION SUMMARY
08/09/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
09/26/2019 Letter INSPECTION SUMMARY
10/25/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
01/06/2020 Letter INSPECTION SUMMARY
01/16/2020 Letter Codes Temporary Certificate of Occupancy
08/20/2020 Plot Plan As-Graded Plot Plan
08/21/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter Field Certificate of Occupancy
01/25/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home