PRRES20182959
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE COVERED DECK UNFINISHED BASEMENT / PARTIAL FINISHED STOP WORK ORDER removed on 11/14/2018 12:00 AM by username 'Jeanne Nixon'.
09/04/2018
09/28/2018
11/21/2019
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
DAVE RICHARDS HOMEBUILDING INC, Address:605 SW US HIGHWAY 40 #414, Phone:(816) 365-8034  
FIVE STAR MECHANICAL CONTRACT INC, Address:P O BOX 11964, Phone:(816) 358-4444  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DRDRICHARDS3@GMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 09/07/2018 09/17/2018
Brandon Kalwei
Plot Plan Review Approved 09/07/2018 09/06/2018
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $957.58 $957.58 Paid 09/28/2018
Right of Way Permit Fee $80.00 $80.00 Paid 09/28/2018
8331507-Sewer Connection Fee $360.00 $360.00 Paid 09/28/2018
Water Tap Fee $3,409.00 $3,409.00 Paid 09/28/2018
Water Meter Fee $408.37 $408.37 Paid 09/28/2018
Not Ready Inspection Fee $50.00 $50.00 Paid 06/03/2019
Valuation Fee New Single Family $63.42 $63.42 Paid 06/03/2019
$1,021.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Failed 11/13/2018 (1:00) 11/13/2018 at 2:20 PM 11/13/2018
Misc
Corrective Action Required
11/13/2018
NO SEWER WORK FOUND
Sewer Service Inspection - R Failed 11/14/2018 (1:15) 11/14/2018 at 1:55 PM 11/14/2018
Misc
Corrective Action Required
11/13/2018
tracer wire with split-bolt connection not installed
Sewer Service Inspection - R Passed 11/15/2018 (9:00) 11/15/2018 at 10:50 AM 11/15/2018
Misc
Resolved
11/15/2018
tracer wire with split-bolt connection not installed
Water Service Inspection - R Passed 11/16/2018 (8:00) 11/16/2018 at 2:20 PM 11/16/2018
Underslab Plumbing Inspection - Residential Failed 11/26/2018 11/26/2018 11/26/2018
Misc
Corrective Action Required
11/26/2018
-PLUMBING COVERED
Underslab Plumbing Inspection - Residential Failed 11/28/2018 11/28/2018 at 8:10 AM 11/28/2018
Misc
Corrective Action Required
11/26/2018
-PLUMBING COVERED **PLEASE UNCOVER THE PLUMBING BEFORE SCHEDULING AN INSPECTION.
Underslab Plumbing Inspection - Residential Passed 12/4/2018 12/4/2018 at 8:45 AM 12/04/2018
Misc
Resolved
12/04/2018
-PLUMBING COVERED **PLEASE UNCOVER THE PLUMBING BEFORE SCHEDULING AN INSPECTION.
All Rough Inspection - Residential Failed 1/9/2019 1/9/2019 at 9:45 AM 01/09/2019
Misc
Corrective Action Required
01/09/2019
GARAGE PORTAL WALL ONLY: BLOCK AND NAIL AT SEAMS; STRAP INTERIOR SIDE PER CODE
Gas Service Inspection - Residential Passed 2/15/2019 2/15/2019 02/15/2019
Electrical Service Inspection Failed 2/15/2019 2/15/2019 02/15/2019
Misc
Corrective Action Required
02/15/2019
-Shall connect the grounding electrode conductor to the bus bar where the service grounded conductor is connected to. NEC 250.24
All Rough Inspection - Residential Failed 2/15/2019 2/15/2019 at 10:05 AM 02/15/2019
Misc
Corrective Action Required
01/09/2019
FRAMING: -Block and nail at garage portal brace wall seams; strap headerl; install washer at anchor bolt -Anchor garage sill plates per code -Install steel column in garage. Frame around -Install ceiling beam hangers above master bedroom and bathroom. -Support spliced hip rafter above master bedroom -Fb fireplace space from roof -Install hangers for ceiling joist connections to triple beam above front bathroom; shall support end of this beam -Install hangers for ceiling beam above foyer -Frame and nail CSPF walls. See the plan detail -Install full support (4 studs) for kitchen I beam point load all the way to grade beam below -Install hangers and fully nail all of them throughout in basement -Toe nail joists to sill plate per code **DO NOT INSULATE
Electrical Service Inspection Failed 2/25/2019 2/25/2019 02/25/2019
Misc
Corrective Action Required
02/15/2019
-Shall connect the grounding electrode conductor to the bus bar where the service grounded conductor is connected to. NEC 250.24
All Rough Inspection - Residential Failed 2/25/2019 2/25/2019 at 9:00 AM 02/25/2019
Misc
Corrective Action Required
02/15/2019
FRAMING: -Block and nail at garage portal brace wall seams; strap headerl; install washer at anchor bolt **nail sheathing to block at seams; one anchor missing washer -Install steel column in garage. Frame around **Anchor the column down to floor please -Support spliced hip rafter above master bedroom -Fb fireplace space from roof **fb excessive gap -Support end of triple 2x10 beam in front bathroom **Not sure if the hanger is supported properly to the bearing wall. Get your engineer to look at this -Frame and nail CSPF walls. See the plan detail -Install full support (4 studs) for kitchen I beam point load all the way to grade beam below **see the plan -Install hangers and fully nail all of them throughout in basement **OK TO INSULATE
All Rough Inspection - Residential Failed 2/28/2019 2/28/2019 at 10:05 AM 02/28/2019
Misc
Corrective Action Required
02/25/2019
-Support end of triple 2x10 beam in front bathroom **Get your engineer to look at this -Frame and nail CSPF walls. See the plan detail **Straps not installed and siding not nailed per CSPF wall detail
Electrical Service Inspection Failed 2/28/2019 2/28/2019 02/28/2019
Misc
Corrective Action Required
02/25/2019
-Shall connect the grounding electrode conductor to the bus bar where the service grounded conductor is connected to. NEC 250.24 **Inside the service disconnect-The code requires that the grounding electrode conductor connect directly to the service grounded conductor (the bus bar that the service grounding conductor is connected to); or if the GEC is connected to a grouding bus bar, then the exception allows a main bonding jumper sized per 250.66 (same as GEC) to connect the bus bar where the service grounded conductor is connected to to the grounding bus bar
All Rough Inspection - Residential Passed 3/27/2019 3/27/2019 at 2:50 PM 03/27/2019
Misc
Resolved
03/27/2019
-Support end of triple 2x10 beam in front bathroom **Get your engineer to look at this -Frame and nail CSPF walls. See the plan detail **Straps not installed and siding not nailed per CSPF wall detail
Electrical Service Inspection Passed 3/27/2019 03/27/2019
Misc
Resolved
03/27/2019
-Shall connect the grounding electrode conductor to the bus bar where the service grounded conductor is connected to. NEC 250.24 **Inside the service disconnect-The code requires that the grounding electrode conductor connect directly to the service grounded conductor (the bus bar that the service grounding conductor is connected to); or if the GEC is connected to a grouding bus bar, then the exception allows a main bonding jumper sized per 250.66 (same as GEC) to connect the bus bar where the service grounded conductor is connected to to the grounding bus bar
Piers/Caissons Inspection - Residential Failed 4/10/2019 4/10/2019 at 8:10 AM 04/10/2019
Misc
Corrective Action Required
04/10/2019
-REMOVE ALL LOOSE SOIL AND GRAVEL FROM PIER HOLE. HOLES MUST BE DUG TO BEARING SOIL
Piers/Caissons Inspection - Residential Failed 4/10/2019 (1:00) 4/10/2019 at 1:15 PM 04/10/2019
Misc
Corrective Action Required
04/10/2019
-REMOVE ALL LOOSE SOIL. HOLES MUST BE DUG TO BEARING SOIL
Piers/Caissons Inspection - Residential Passed 4/10/2019 at 2:30 PM 04/10/2019
Misc
Resolved
04/10/2019
-REMOVE ALL LOOSE SOIL. HOLES MUST BE DUG TO BEARING SOIL
Driveway Inspection Partial 4/15/2019 (P.M.) 4/15/2019 04/19/2019
Corrective Action Required
04/18/2019
Not Ready
Misc
Informational
04/19/2019
Forms and materials passed pre-inspection.
Driveway Inspection Passed 4/19/2019 4/19/2019 04/25/2019
Misc
Informational
04/25/2019
Final Inspection Pased.
All Rough Inspection - Residential Passed 6/12/2019 6/12/2019 at 1:10 PM 06/12/2019
Occupancy Inspection - Codes Residential Failed 7/15/2019 7/15/2019 at 1:35 PM 07/15/2019
Misc
Corrective Action Required
07/15/2019
-Submit engineer approval report for the footing. Occupancy shall not be granted until the report is submitted to the city -Erosion control shall be installed along the street before TCO can be issued -Obtain lawn irrigation permit -Final grade, sod, splashblocks -Install sewer tracer box and wire at grade level -Provide the intersystem bonding terminal -Move the AC disconnect or AC unit to proper clearance; secure AC whip per code -Install tamper-proof caps at AC -Install security strike plate at rear door -Install range -Install box extension at kitchen countertop backsplash for all boxes recessed more than 1/4” behind backsplash surface; install box extension at floor receptacle -Panel cover not installed; paint sprayed inside of panel -Secure water service pex line per code -Secure furnace LFNC raceway per code; install cover plate for switch -Install breaker lock for water heater and multiwire branch circuit breakers
Occupancy Inspection - Codes Residential Temporary C of O 7/17/2019 7/17/2019 07/17/2019
Misc
Corrective Action Required
07/15/2019
Grading on rear of house needs to be at 6” or more from siding, needs to be re graded and called back in.
Misc
Resolved
07/17/2019
Occupancy Inspection - Codes Residential Failed 8/19/2019 at 10:10 AM 08/19/2019
Misc
Corrective Action Required
07/17/2019
Grading on the west side of the house not draining properly (standing water and dead grass). Needs to be re graded and called back in. **THE REAR LANDSCAPE DOES NOT MEET THE REQUIREMENT OF CITY ORDINANCE **SUBSTITUTE BILL NO. 15-118, ORDINANCE NO.7690 10. That builders be required to put in a minimum of three Evergreen trees, two ornamental trees and three shrubs, one each lot adjacent to the Lake Ridge Meadows and Dalton's Ridge subdivisions, acknowledging that the goal is to provide a visual buffer for the property to the north. No final certi?cate of occupancy shall be issued for an individually affected lot until such time as the required number of trees and shrubs are planted on said lot. The required landscaping shall be planted within 20 feet of the rear property line. The required landscaping shall meet the minimum size requirements of the U00 at the time of planting (i.e. 8' for Evergreen trees, 3” caliper for ornamental trees and 2- gallon container for shrubs).
Occupancy Inspection - Codes Residential Full C of O 11/21/2019 11/21/2019 11/21/2019
Misc
Resolved
11/21/2019
Grading on the west side of the house not draining properly (standing water and dead grass). Needs to be re graded and called back in. **THE REAR LANDSCAPE DOES NOT MEET THE REQUIREMENT OF CITY ORDINANCE **SUBSTITUTE BILL NO. 15-118, ORDINANCE NO.7690 10. That builders be required to put in a minimum of three Evergreen trees, two ornamental trees and three shrubs, one each lot adjacent to the Lake Ridge Meadows and Dalton's Ridge subdivisions, acknowledging that the goal is to provide a visual buffer for the property to the north. No final certi?cate of occupancy shall be issued for an individually affected lot until such time as the required number of trees and shrubs are planted on said lot. The required landscaping shall be planted within 20 feet of the rear property line. The required landscaping shall meet the minimum size requirements of the U00 at the time of planting (i.e. 8' for Evergreen trees, 3” caliper for ornamental trees and 2- gallon container for shrubs).
Documents & Images
Date Uploaded File Type Document Name
09/05/2018 Letter Codes Residential Plan Review
09/28/2018 Receipt Receipt for transaction: 2018-006613
09/28/2018 Letter Codes Building Permit
10/01/2018 Plot Plan DOC100118-10012018095813
11/14/2018 Letter Inspection Summary
11/16/2018 Letter INSPECTION SUMMARY
11/26/2018 Letter INSPECTION SUMMARY
11/28/2018 Letter INSPECTION SUMMARY
12/04/2018 Letter INSPECTION SUMMARY
02/25/2019 Letter INSPECTION SUMMARY
02/25/2019 Letter INSPECTION SUMMARY
03/27/2019 Letter INSPECTION SUMMARY
03/27/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter DE-Daily Inspection Summary
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/19/2019 Letter INSPECTION SUMMARY
04/25/2019 Letter INSPECTION SUMMARY
06/03/2019 Receipt Receipt for transaction: 2019-003167
06/03/2019 Letter Codes Building Permit
06/04/2019 Drawing DOC060419-06042019075221
06/12/2019 Letter INSPECTION SUMMARY
07/15/2019 Letter INSPECTION SUMMARY
07/16/2019 Engineer Report/Study Garys Fndn 1309 NE Goshen Dr Lee's Summit Mo Footings 10-16-18.
07/17/2019 Letter Letter from Engineer
07/17/2019 Letter Codes Temporary Certificate of Occupancy
08/19/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter Stop Work Order
11/21/2019 Letter Inspection Summary
11/21/2019 Letter Inspection Summary
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter Codes Final Certificate of Occupancy
11/21/2019 Letter Field Certificate of Occupancy
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
11/21/2019 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home