Summary


PRPWFC20173801
Public Works Infrastructure Permit - Commercial
Final Acceptance
GILLESPIE KENNETH W & MARIJA N
DEVELOPMENT COMPLETE
Residences at Echelon - Street/Storm/Sanitary - Cheddington
11/21/2017
12/01/2017
01/11/2024
09/08/2021
Locations
Contacts
Not shown for privacy reasons.
LUKE DRAILY CONSTRUCTION INC, Address:75 NW BUSINESS PARK LANE, Phone:(816) 459-8531  
KAT EXCAVATION INC, Address:309 N OAK, Phone:(816) 690-4611  
  
GILLESPIE KENNETH W & MARIJA N, Address:1105 N HUNDLEY  
ALDERSGATE METHODIST CHURCH, Address:350 SW M 150 HWY  
CITY OF LEE'S SUMMIT MISSOURI, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/21/2017 02/12/2018
Matt Munger
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $1,246.71 $1,246.71 Paid 11/21/2017
9110068-Storm Fee $1,678.77 $1,678.77 Paid 11/21/2017
9110081-Paved Surface Inspection Fee $8,118.76 $8,118.76 Paid 11/21/2017
9110071-Site Grading Fee $366.78 $366.78 Paid 11/21/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 12/4/2017 at 9:45 AM 12/04/2017
PW-Misc
Informational
12/04/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
Site Visit Partial 12/6/2017 at 10:25 AM 12/06/2017
PW-Misc
Informational
12/04/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/06/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
Site Visit Partial 12/7/2017 at 9:46 AM 12/07/2017
PW-Misc
Informational
12/06/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/06/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/07/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
Site Visit Partial 12/8/2017 at 9:15 AM 12/08/2017
PW-Misc
Informational
12/07/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/07/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/07/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/08/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
Erosion Control Inspection Partial 12/11/2017 at 11:05 AM 12/11/2017
PW-Misc
Informational
12/11/2017
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
Storm - Material Verification Partial 12/11/2017 at 11:45 AM 12/11/2017
Informational
12/11/2017
Matt Munger 12/11/2017 12:01 PM While I was onsite inspecting ESC that was installed I looked over some of the existing sanitary sewer pipe that was delivered to the site. I observed 6" and 8" that was marked SDR26 with a date of September 7, 2017. I also observed sewer manholes that had the black weather proofing coating.
Site Visit Partial 12/13/2017 at 11:00 AM 12/13/2017
PW-Misc
Informational
12/08/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/08/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/08/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/08/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/13/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
Sanitary Sewer Construction Inspection Partial 12/15/2017 at 1:20 PM 12/15/2017
PW-Main inspection
Informational
12/15/2017
Matt Munger 12/15/2017 1:20 PM Bob Burns and I stopped by to check on the progress. Constuction entrance was in place off of Cheddington. MH A-1 and the sewer pipe was installed to MH A-2 prior to our arrival. KC Testing Lab was on site to perfrom the compaction tests. I observed a minimum of 6" of gravel under MH A-2. When we arrived half of the line from MH A-1 to A-2 had been backfilled. The half closest to MH A-2 that wasn't backfilled had clean gravel above and below the pipe (minumum of 6" above and below).
Sanitary Sewer Construction Inspection Partial 12/15/2017 at 2:36 PM 12/15/2017
PW-Main inspection
Informational
12/15/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
Sanitary Sewer Construction Inspection Partial 12/18/2017 at 10:28 AM 12/18/2017
PW-Main inspection
Informational
12/15/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
Sanitary Sewer Construction Inspection Partial 12/18/2017 at 1:40 PM 12/18/2017
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
Sanitary Sewer Construction Inspection Partial 12/19/2017 at 12:50 PM 12/19/2017
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/18/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/19/2017 12:50 PM Tom and I met with TJ and Justin from Kat Excavation to go over work schedules. I observed an adequate amount of gravel over the pipe from MH B-1 to B-2. I observed the workers set MH B-2. I observed at least 6" of gravel in place before they set the MH B-2 base. They wrapped the joints between the base and barrel section. I observed Justin backfill and compact in lifts around MH B-1 to approximately Sta. 4+50. I spoke with the Sam from KC Testing and he stated he was doing compaction tests every 75ft. I asked him to email me the reports for what he had done so far.
Sanitary Sewer Construction Inspection Partial 12/19/2017 at 9:33 AM 12/19/2017
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/19/2017 12:50 PM Tom and I met with TJ and Justin from Kat Excavation to go over work schedules. I observed an adequate amount of gravel over the pipe from MH B-1 to B-2. I observed the workers set MH B-2. I observed at least 6" of gravel in place before they set the MH B-2 base. They wrapped the joints between the base and barrel section. I observed Justin backfill and compact in lifts around MH B-1 to approximately Sta. 4+50. I spoke with the Sam from KC Testing and he stated he was doing compaction tests every 75ft. I asked him to email me the reports for what he had done so far.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/19/2017 9:33 AM When I had arrived I observed MH C-1 in place and had been backfilled prior to my arrival. I observed clean gravel covering the sewer pipe from MH B-1 to Sta. 4+00. I reminded Justin about using Utility tape 18-24" below final grade for the Public Sewer Main that was installed. We also discussed maintaining a minimum clearance of 18" from the flanges for the Backflow Vault when they start on they get to that point.
Erosion Control Inspection Partial 12/19/2017 at 12:50 PM 12/19/2017
PW-Misc
Informational
12/11/2017
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
12/19/2017
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
Sanitary Sewer Construction Inspection Partial 12/20/2017 at 8:33 AM 12/20/2017
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/19/2017 12:50 PM Tom and I met with TJ and Justin from Kat Excavation to go over work schedules. I observed an adequate amount of gravel over the pipe from MH B-1 to B-2. I observed the workers set MH B-2. I observed at least 6" of gravel in place before they set the MH B-2 base. They wrapped the joints between the base and barrel section. I observed Justin backfill and compact in lifts around MH B-1 to approximately Sta. 4+50. I spoke with the Sam from KC Testing and he stated he was doing compaction tests every 75ft. I asked him to email me the reports for what he had done so far.
PW-Main inspection
Informational
12/19/2017
Matt Munger 12/19/2017 9:33 AM When I had arrived I observed MH C-1 in place and had been backfilled prior to my arrival. I observed clean gravel covering the sewer pipe from MH B-1 to Sta. 4+00. I reminded Justin about using Utility tape 18-24" below final grade for the Public Sewer Main that was installed. We also discussed maintaining a minimum clearance of 18" from the flanges for the Backflow Vault when they start on they get to that point.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/20/2017 9:38 AM Upon my arrival I observed an adequate amount of gravel over the sewer pipe that had been laid from MH B-2 to B-3. There was an adequate amount of clean aggregate under MH B-3 as well as the black waterproofing coating on the exterior of the base. I had noticed the stakes were close together and reminded Daniel that there needs to be 4ft of visible pipe between the manholes, wyes and fittings. When the crew had lowered the section of pipe into the trench I had Daniel put his tape measure on the pipe and the section of pipe between the two Wye's was not long enough. Daniel had another pipe cut and put it back together so 4ft of visible pipe would be between fittings. I showed Daniel the LS Detail for Sanitary Sewer service stubs to show him where the trench check should be put and asked that he keep the ticket for the Flowable Backfill. Daniel had asked if they could use concrete and I informed again about using Flowable Backfill and showed him in Section 3500 in LS D&C on page 4 the requirements for Flowable Backfill. I observed the correct SDR-26 Sanitary Sewer pipe and looked over to see if there were any defects that I could see as well as seeing SDR-26 marked on the Wye's that were laying out. I also am sending the link to Daniel to the City of Lee's Summit Design and Criteria Manual.
Sanitary Sewer Construction Inspection Partial 12/20/2017 at 2:05 PM 12/20/2017
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/19/2017 12:50 PM Tom and I met with TJ and Justin from Kat Excavation to go over work schedules. I observed an adequate amount of gravel over the pipe from MH B-1 to B-2. I observed the workers set MH B-2. I observed at least 6" of gravel in place before they set the MH B-2 base. They wrapped the joints between the base and barrel section. I observed Justin backfill and compact in lifts around MH B-1 to approximately Sta. 4+50. I spoke with the Sam from KC Testing and he stated he was doing compaction tests every 75ft. I asked him to email me the reports for what he had done so far.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/19/2017 9:33 AM When I had arrived I observed MH C-1 in place and had been backfilled prior to my arrival. I observed clean gravel covering the sewer pipe from MH B-1 to Sta. 4+00. I reminded Justin about using Utility tape 18-24" below final grade for the Public Sewer Main that was installed. We also discussed maintaining a minimum clearance of 18" from the flanges for the Backflow Vault when they start on they get to that point.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/20/2017 9:38 AM Upon my arrival I observed an adequate amount of gravel over the sewer pipe that had been laid from MH B-2 to B-3. There was an adequate amount of clean aggregate under MH B-3 as well as the black waterproofing coating on the exterior of the base. I had noticed the stakes were close together and reminded Daniel that there needs to be 4ft of visible pipe between the manholes, wyes and fittings. When the crew had lowered the section of pipe into the trench I had Daniel put his tape measure on the pipe and the section of pipe between the two Wye's was not long enough. Daniel had another pipe cut and put it back together so 4ft of visible pipe would be between fittings. I showed Daniel the LS Detail for Sanitary Sewer service stubs to show him where the trench check should be put and asked that he keep the ticket for the Flowable Backfill. Daniel had asked if they could use concrete and I informed again about using Flowable Backfill and showed him in Section 3500 in LS D&C on page 4 the requirements for Flowable Backfill. I observed the correct SDR-26 Sanitary Sewer pipe and looked over to see if there were any defects that I could see as well as seeing SDR-26 marked on the Wye's that were laying out. I also am sending the link to Daniel to the City of Lee's Summit Design and Criteria Manual.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/20/2017 2:05 PM When I arrived the crew had backfilled between MH B-2 to MH B-3. I observed the joints on the barrel section and the cone section on MH B-3.
Site Visit Partial 12/21/2017 at 2:10 PM 12/21/2017
PW-Misc
Informational
12/13/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/13/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/13/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/13/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/13/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
12/21/2017
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
Grading/Excavation/Fill Inspection Partial 12/22/2017 at 11:30 AM 12/22/2017
Informational
12/22/2017
Tom Chandler 12/22/2017 4:19 PM Grading/Fill in work being done today on west side of the site. KC Testing on-site for testing as well.
Site Visit Partial 12/22/2017 at 11:30 AM 12/22/2017
PW-Misc
Informational
12/21/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/21/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/21/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/21/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/21/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
12/21/2017
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
12/22/2017
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
Site Visit Partial 12/28/2017 at 9:40 AM 12/28/2017
PW-Misc
Informational
12/22/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/22/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/22/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/22/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/22/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
12/22/2017
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
12/22/2017
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
12/28/2017
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
Site Visit Partial 12/29/2017 at 11:11 AM 12/29/2017
PW-Misc
Informational
12/28/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/28/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/28/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/28/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/28/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
12/28/2017
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
12/28/2017
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
12/28/2017
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
12/29/2017
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
Site Visit Partial 1/2/2018 at 10:36 AM 01/02/2018
PW-Misc
Informational
12/29/2017
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
12/29/2017
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
12/29/2017
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
12/29/2017
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
12/29/2017
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
12/29/2017
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
12/29/2017
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
12/29/2017
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
12/29/2017
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/02/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
Site Visit Partial 1/4/2018 at 8:59 AM 01/04/2018
PW-Misc
Informational
01/02/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/02/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/02/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/02/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/02/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/02/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/02/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/02/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/02/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/02/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/04/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
Site Visit Partial 1/8/2018 at 9:40 AM 01/08/2018
PW-Misc
Informational
01/04/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/04/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/04/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/04/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/04/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/04/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/04/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/04/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/04/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/04/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/04/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/08/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
Site Visit Partial 1/8/2018 at 10:58 AM 01/08/2018
PW-Misc
Informational
01/08/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/08/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/08/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/08/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/08/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/08/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/08/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/08/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/08/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/08/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/08/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/08/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/08/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
Erosion Control Inspection Partial 1/9/2018 at 11:13 AM 01/09/2018
PW-Misc
Informational
12/19/2017
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
12/19/2017
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/09/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
Site Visit Partial 1/9/2018 at 11:13 AM 01/09/2018
PW-Misc
Informational
01/08/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/08/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/08/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/08/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/08/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/08/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/08/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/08/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/08/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/08/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/08/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/08/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/08/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/09/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
Storm - Material Verification Partial 1/10/2018 at 9:00 AM 01/10/2018
Informational
01/10/2018
Matt Munger 01/10/2018 9:00 AM No work was done on site due to the weather. I looked over the storm sewer pipe and observed: 15", 18" and 24" HDPE pipe with the ASTM F2306 PE, AASHTO M294 stamped on the side. I also saw wye fittings that were stamped with Heavy Wall SDR26 in a crate. I also observed 6" CI/PL x 6" CI/PL Flexible Couplings with Strong Rack Ring that was stamped Complies with ASTM:C1173.D5926.
Site Visit Partial 1/11/2018 at 10:35 AM 01/11/2018
PW-Misc
Informational
01/09/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/09/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/09/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/09/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/09/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/09/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/09/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/09/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/09/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/09/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/09/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/09/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/09/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/09/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/11/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
Site Visit Partial 1/12/2018 at 1:52 PM 01/12/2018
PW-Misc
Informational
01/11/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/11/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/11/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/11/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/11/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/11/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/11/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/11/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/11/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/11/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/11/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/11/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/11/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/11/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/11/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/12/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
Site Visit Partial 1/16/2018 at 10:50 AM 01/16/2018
PW-Misc
Informational
01/12/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/12/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/12/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/12/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/12/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/12/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/12/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/12/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/12/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/12/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/12/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/12/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/12/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/12/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/12/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/12/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/16/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
Site Visit Partial 1/17/2018 at 11:10 AM 01/17/2018
PW-Misc
Informational
01/16/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/16/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/16/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/16/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/16/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/16/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/16/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/16/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/16/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/16/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/16/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/16/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/16/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/16/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/16/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/16/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/16/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/17/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
Site Visit Partial 1/18/2018 at 10:45 AM 01/18/2018
PW-Misc
Informational
01/17/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/17/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/17/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/17/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/17/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/17/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/17/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/17/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/17/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/17/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/17/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/17/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/17/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/17/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/17/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/17/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/17/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/17/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/18/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
Erosion Control Inspection Partial 1/22/2018 at 10:55 AM 01/22/2018
PW-Misc
Informational
01/09/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
01/09/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/09/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/22/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
Site Visit Partial 1/23/2018 at 2:50 PM 01/23/2018
PW-Misc
Informational
01/18/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/18/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/18/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/18/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/18/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/18/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/18/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/18/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/18/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/18/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/18/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/18/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/18/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/18/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/18/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/18/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/18/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/18/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/18/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/23/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
Site Visit Partial 1/24/2018 at 10:30 AM 01/24/2018
PW-Misc
Informational
01/23/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/23/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/23/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/23/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/23/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/23/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/23/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/23/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/23/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/23/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/23/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/23/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/23/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/23/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/23/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/23/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/23/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/23/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/23/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/23/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/24/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
Site Visit Partial 1/25/2018 at 9:30 AM 01/25/2018
PW-Misc
Informational
01/24/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site. Silt fence on west side was put back up.
PW-Misc
Informational
01/24/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/24/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/24/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/24/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/24/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/24/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/24/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/24/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/24/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/24/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/24/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/24/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/24/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/24/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/24/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/24/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/24/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/24/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/24/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/24/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
01/25/2018
Matt Munger 01/25/2018 9:30 No work was being done on site. Spoke with TJ and he stated Kat will come out Monday to see if they can get some work started pending the stability of the soil. KC Test Co will be out to check as well.
Site Visit Partial 1/26/2018 at 10:39 AM 01/26/2018
PW-Misc
Informational
01/25/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/25/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/25/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/25/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/25/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/25/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/25/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/25/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/25/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/25/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/25/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/25/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/25/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/25/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/25/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/25/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/25/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/25/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/25/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/25/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/25/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
01/25/2018
Matt Munger 01/25/2018 9:30 No work was being done on site. Spoke with TJ and he stated Kat will come out Monday to see if they can get some work started pending the stability of the soil. KC Test Co will be out to check as well.
Informational
01/26/2018
Matt Munger 01/26/2018 10:44 AM No work was being done on site.
Site Visit Partial 1/29/2018 at 9:24 AM 01/29/2018
PW-Misc
Informational
01/26/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/26/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/26/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/26/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/26/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/26/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/26/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/26/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/26/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/26/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/26/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/26/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/26/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/26/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/26/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/26/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/26/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/26/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/26/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/26/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/26/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
01/29/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
Storm - Material Verification Partial 1/30/2018 at 9:25 AM 01/30/2018
Informational
01/30/2018
Matt Munger 01/30/2018 9:25 AM I observed the correct HDPE pipe that workers were installing as well as storm boxes 1-3, 1-4, 1-5, 4-1, 2-1 set on site where they are going to be put in.
Storm Sewer Construction Inspection Partial 1/30/2018 at 9:25 AM 01/30/2018
PW-Storm Sewer Inspection
Informational
01/30/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from storm box 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1.
Erosion Control Inspection Partial 1/30/2018 at 1:07 PM 01/30/2018
PW-Misc
Informational
01/22/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
01/22/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/22/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/22/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
01/30/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
Site Visit Partial 1/30/2018 at 2:03 PM 01/30/2018
PW-Misc
Informational
01/29/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/29/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/29/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/29/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/29/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/29/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/29/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/29/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/29/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/29/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/29/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/29/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/29/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/29/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/29/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/29/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/29/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/29/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/29/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/29/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/29/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
01/29/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
01/30/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on site on the north side of the site while workers were compacting over the soil.
Storm Sewer Construction Inspection Partial 1/30/2018 at 1:07 PM 01/30/2018
PW-Storm Sewer Inspection
Informational
01/30/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
01/30/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
Grading/Excavation/Fill Inspection Partial 1/31/2018 at 9:23 AM 01/31/2018
PW-Misc
Informational
01/31/2018
Matt Munger 01/31/2018 10:24 AM I spoke with KC Test Lab while they were on site, he stated they were getting 97% compaction on the north side of the property. On 1/30/18 KC Test was taking compaction tests approximately every 50-60ft on the north side.
Sanitary Sewer Construction Inspection Partial 1/31/2018 at 9:23 AM 01/31/2018
Informational
01/31/2018
Matt Munger 01/31/2018 9:46 AM Daniel had the 6" stub (38.2ft) installed and plenty of gravel on top of the stub on the B Line closest to Manhole B-3. They were working on the stub to the east of Manhole B-3. I observed the area that was cut out for the trench check. Daniel stated they ran the slope at 1% for the stub to the west of Manhole B-3. They had used the correct pipe and fittings (SDR-26). Daniel had an area cut out for the trench check to be put in place for the stub line that had installed, they will have a truck by later in the day to pour the flowable backfill.
Storm Sewer Construction Inspection Partial 1/31/2018 at 9:23 AM 01/31/2018
PW-Storm Sewer Inspection
Informational
01/30/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
01/30/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
01/31/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
Sanitary Sewer Construction Inspection Partial 1/31/2018 at 2:07 PM 01/31/2018
Informational
01/31/2018
Matt Munger 01/31/2018 2:36 PM The Kat crew had the NW sanitary sewer line in on the B line on the west of Manhole B-3. They had an area cut out for the trench checks (waiting on flowable fill). They were working on C Line stubs, I observed them using pipe dope on the wye fittings, they had SDR-26 pipe next to the excavation hole that they were going to use for the stubs. I had asked Justin to save the flowable fill tickets for me. Justin wasn't sure if they were going to finish the C line stubs today.
Sanitary Sewer Construction Inspection Partial 2/1/2018 at 9:48 AM 02/01/2018
PW-Main inspection
Informational
02/01/2018
Matt Munger 02/01/2018 10:00 AM The stub lines for C line were in an had an adequate amount of gravel on top of the pipe. The clean out was installed and had a cap on top. I observed the pipe that was in the ground was the proper type (SDR-26). Spoke with Justin about doing the testing for the line that was installed. He also stated there was some changes to the long stub line (2nd stub line to the east of Manhole A-2). They were going to try and get the 2 short stub lines in today if possible.
Sanitary Sewer Construction Inspection Partial 2/1/2018 at 2:55 PM 02/01/2018
PW-Main inspection
Informational
02/01/2018
Matt Munger 02/01/2018 10:00 AM The stub lines for C line were in an had an adequate amount of gravel on top of the pipe. The clean out was installed and had a cap on top. I observed the pipe that was in the ground was the proper type (SDR-26). Spoke with Justin about doing the testing for the line that was installed. He also stated there was some changes to the long stub line (2nd stub line to the east of Manhole A-2). They were going to try and get the 2 short stub lines in today if possible.
PW-Main inspection
Informational
02/01/2018
Matt Munger 02/01/2018 3:25 PM When I had arrived the 1st and 3rd stub line east of MH A-2 had trench checks in and KC test lab was testing between lifts. I also observed an adequate amount of gravel in place above the stub line. I had asked Justin earlier in the day that I will need a copy of all of the concrete tickets and tickets for the flowable fill.
Sanitary Sewer Construction Inspection Partial 2/2/2018 at 10:30 AM 02/02/2018
PW-Main inspection
Informational
02/01/2018
Matt Munger 02/01/2018 10:00 AM The stub lines for C line were in an had an adequate amount of gravel on top of the pipe. The clean out was installed and had a cap on top. I observed the pipe that was in the ground was the proper type (SDR-26). Spoke with Justin about doing the testing for the line that was installed. He also stated there was some changes to the long stub line (2nd stub line to the east of Manhole A-2). They were going to try and get the 2 short stub lines in today if possible.
PW-Main inspection
Informational
02/01/2018
Matt Munger 02/01/2018 3:25 PM When I had arrived the 1st and 3rd stub line east of MH A-2 had trench checks in and KC test lab was testing between lifts. I also observed an adequate amount of gravel in place above the stub line. I had asked Justin earlier in the day that I will need a copy of all of the concrete tickets and tickets for the flowable fill.
PW-Main inspection
Informational
02/02/2018
Matt Munger 02/02/2018 11:21 AM I opened up MH A-1 and A-2 to look over the inverts that were poured on 2/1/18. The inverts were smooth and were flowing in the correct direction.
Storm Sewer Construction Inspection Partial 2/2/2018 at 10:30 AM 02/02/2018
PW-Storm Sewer Inspection
Informational
01/31/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
01/31/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
01/31/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
Storm - Material Verification Partial 2/2/2018 at 10:30 AM 02/02/2018
Informational
02/02/2018
Matt Munger 02/02/2018 10:30 AM Looked over the storm boxes that were on site, they had the location number tagged on them, etc. They also had the storm box tops laid out with lids. The MH lids were stamped City of Lee's Summit and Storm stamped on them.
Erosion Control Inspection Partial 2/7/2018 at 1:35 PM 02/02/2018
PW-Misc
Informational
01/30/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
01/30/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/30/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
01/30/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
01/30/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/02/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
Storm Sewer Construction Inspection Partial 2/2/2018 at 1:35 PM 02/02/2018
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
Site Visit Partial 2/5/2018 at 9:10 AM 02/05/2018
PW-Misc
Informational
01/30/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
01/30/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
01/30/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
01/30/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
01/30/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
01/30/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
01/30/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
01/30/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
01/30/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
01/30/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
01/30/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
01/30/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
01/30/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
01/30/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
01/30/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
01/30/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
01/30/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
01/30/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
01/30/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
01/30/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
01/30/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
01/30/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
01/30/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/05/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
Sanitary Sewer Construction Inspection Partial 2/6/2018 at 10:20 AM 02/06/2018
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/15/2017 2:36 PM Workers had intalled the private side of the sanitary sewer main from MH A-2 to the 2nd service Wye prior to my arrival. I observed and adequate amount of clean gravel above and below the sewer pipe. KC Test Lab was on site and the workers were using a vibratory sheepfoot roller over the dirt that had been backfilled from MH A-1 to MH A-2. I observed the workers using a laser to align the pipe. The backfill dirt piles around the site did not have any large rock or debris in them. I observed the workers lowering the pipe into the trench in a manner that would not damage the pipe that was being installed. When the workers were installing the pipe they used pipe lubricant and would seat each joint to ensure a tight seal. I asked Daniel length of pipe they used between the first two Wyes on the private main and he stated 5' of pipe was between the Wyes. I observed them install the 3rd Wye, they beveled the egdes of the pipe that they cut and set the Wye between 30-45 degrees and chocked in rock under the Wye to support it.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/18/2017 10:28 AM Upon my arrival I observed an adequate amount of clean gravel above and below the pipe. I spoke with Daniel and reminded him about making sure they use Utility Marker Tape 18-24" below finish grade for the Public Main. I observed them backfilling and compacting in lifts. Daniel stated they were going to work on getting MH B-1 and MH C-1 set today. Water Utility workers came out to locate the valves needed to perform a shutdown.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/18/2017 1:40 PM I observed an adequate amount of gravel below MH B-1, the joint between the section was wrapped to seal each section. I spoke with Daniel about making sure there is 4ft of pipe between Wye's. The service stubs between MH B-1 and MH C-1 (private sanitary sewer)appeared to be close.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/19/2017 12:50 PM Tom and I met with TJ and Justin from Kat Excavation to go over work schedules. I observed an adequate amount of gravel over the pipe from MH B-1 to B-2. I observed the workers set MH B-2. I observed at least 6" of gravel in place before they set the MH B-2 base. They wrapped the joints between the base and barrel section. I observed Justin backfill and compact in lifts around MH B-1 to approximately Sta. 4+50. I spoke with the Sam from KC Testing and he stated he was doing compaction tests every 75ft. I asked him to email me the reports for what he had done so far.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/19/2017 9:33 AM When I had arrived I observed MH C-1 in place and had been backfilled prior to my arrival. I observed clean gravel covering the sewer pipe from MH B-1 to Sta. 4+00. I reminded Justin about using Utility tape 18-24" below final grade for the Public Sewer Main that was installed. We also discussed maintaining a minimum clearance of 18" from the flanges for the Backflow Vault when they start on they get to that point.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/20/2017 9:38 AM Upon my arrival I observed an adequate amount of gravel over the sewer pipe that had been laid from MH B-2 to B-3. There was an adequate amount of clean aggregate under MH B-3 as well as the black waterproofing coating on the exterior of the base. I had noticed the stakes were close together and reminded Daniel that there needs to be 4ft of visible pipe between the manholes, wyes and fittings. When the crew had lowered the section of pipe into the trench I had Daniel put his tape measure on the pipe and the section of pipe between the two Wye's was not long enough. Daniel had another pipe cut and put it back together so 4ft of visible pipe would be between fittings. I showed Daniel the LS Detail for Sanitary Sewer service stubs to show him where the trench check should be put and asked that he keep the ticket for the Flowable Backfill. Daniel had asked if they could use concrete and I informed again about using Flowable Backfill and showed him in Section 3500 in LS D&C on page 4 the requirements for Flowable Backfill. I observed the correct SDR-26 Sanitary Sewer pipe and looked over to see if there were any defects that I could see as well as seeing SDR-26 marked on the Wye's that were laying out. I also am sending the link to Daniel to the City of Lee's Summit Design and Criteria Manual.
PW-Main inspection
Informational
12/20/2017
Matt Munger 12/20/2017 2:05 PM When I arrived the crew had backfilled between MH B-2 to MH B-3. I observed the joints on the barrel section and the cone section on MH B-3.
PW-Main inspection
Informational
02/06/2018
Matt Munger 02/06/2018 10:20 AM No work was being done on site due to the snow that had occured. I did look over the 8" SDR-26 that was on site. The material does meet our standards and the the date on the pipe was not very old.
Site Visit Partial 2/7/2018 at 9:22 AM 02/07/2018
PW-Misc
Informational
02/05/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/05/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/05/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/05/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/05/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/05/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/05/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/05/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/05/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/05/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/05/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/05/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/05/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/05/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/05/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/05/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/05/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/05/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/05/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/05/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/05/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/05/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/05/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/05/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/07/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
Erosion Control Inspection Partial 2/7/2018 at 9:22 AM 02/08/2018
PW-Misc
Informational
02/02/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
02/02/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/02/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/02/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
02/02/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/02/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/07/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
Sanitary Sewer Construction Inspection Partial 2/8/2018 at 9:35 AM 02/08/2018
PW-Main inspection
Informational
02/08/2018
Matt Munger 02/08/2018 10:19 AM Kat was working on installing Private A Sanitary Main off of Public MH A-2 . They had their laser setup and were using the correct pipe.I observed an adequate amount of gravel above and below the pipe. Daniel stated they would encasing the sanitary main on the A line where the storm crosses, I had advised him to make sure and use 4500 psi mix. I spoke with Daniel about making sure to grout the lift holes on Public Manhole A-1 and A-2 and informed him before we test the public line we need to flush the line. Water Department wants everything to be complete before testing is done on the public line.
Sanitary Sewer Construction Inspection Partial 2/8/2018 at 11:01 AM 02/08/2018
PW-Main inspection
Informational
02/02/2018
Matt Munger 02/01/2018 10:00 AM The stub lines for C line were in an had an adequate amount of gravel on top of the pipe. The clean out was installed and had a cap on top. I observed the pipe that was in the ground was the proper type (SDR-26). Spoke with Justin about doing the testing for the line that was installed. He also stated there was some changes to the long stub line (2nd stub line to the east of Manhole A-2). They were going to try and get the 2 short stub lines in today if possible.
PW-Main inspection
Informational
02/02/2018
Matt Munger 02/01/2018 3:25 PM When I had arrived the 1st and 3rd stub line east of MH A-2 had trench checks in and KC test lab was testing between lifts. I also observed an adequate amount of gravel in place above the stub line. I had asked Justin earlier in the day that I will need a copy of all of the concrete tickets and tickets for the flowable fill.
PW-Main inspection
Informational
02/02/2018
Matt Munger 02/02/2018 11:21 AM I opened up MH A-1 and A-2 to look over the inverts that were poured on 2/1/18. The inverts were smooth and were flowing in the correct direction.
PW-Main inspection
Informational
02/08/2018
Matt Munger 02/08/2018 11:15 AM Daniel had called me asking if he could use #3 rebar in addition to the #4. The details call out for #4 rebar in that plans and that is what I told him to use. While on site I observed the Kat crew using pipe dope before installing the saniart pipe for line A and there was an adequate amount of rock above and below the pipe.
Site Visit Partial 2/8/2018 at 11:25 AM 02/08/2018
PW-Misc
Informational
02/07/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/07/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/07/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/07/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/07/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/07/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/07/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/07/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/07/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/07/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/07/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/07/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/07/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/07/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/07/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/07/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/07/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/07/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/07/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/07/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/07/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/07/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/07/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/07/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/07/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
Informational
02/07/2018
PW-Misc
Informational
02/08/2018
Matt Munger 02/08/2018 11:31 AM Delivered the revised grading plan to TJ.
Sanitary Sewer Construction Inspection Partial 2/8/2018 at 1:50 PM 02/08/2018
PW-Main inspection
Informational
02/08/2018
Matt Munger 02/08/2018 10:19 AM Kat was working on installing Private A Sanitary Main off of Public MH A-2 . They had their laser setup and were using the correct pipe.I observed an adequate amount of gravel above and below the pipe. Daniel stated they would encasing the sanitary main on the A line where the storm crosses, I had advised him to make sure and use 4500 psi mix. I spoke with Daniel about making sure to grout the lift holes on Public Manhole A-1 and A-2 and informed him before we test the public line we need to flush the line. Water Department wants everything to be complete before testing is done on the public line.
PW-Main inspection
Informational
02/08/2018
Matt Munger 02/08/2018 2:14 PM While I was on site I observed Daniel putting together the rebar cage for the concrete encasement on the private sanitary sewer main on line A. Daniel stated they would be pouring concrete in the morning. I informed him Tom or Steve would be out to cover for me while I was gone.
Sanitary Sewer - Invert Partial 2/9/2018 at 10:30 AM 02/09/2018
PW-Misc
Informational
02/09/2018
I came by this morning and talked with Daniel. They finished pouring the inverts for sanitary MH a-3 and a-4. I was not able to get back out in the afternoon, but jeremy and John went out for me in the afternoon.Steve Robbins 02/09/2018 3:44 PM
Miscellaneous PWORKS Inspection Passed 2/9/2018 at 10:30 AM 02/12/2018
PW-Misc
Informational
02/12/2018
On Friday the contractors also installed the concrete for the encasement of the sewer crossing.Steve Robbins 02/12/2018 8:24 AM
Erosion Control Inspection Partial 2/12/2018 at 9:30 AM 02/12/2018
PW-Misc
Informational
02/08/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
02/08/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/08/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/08/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
02/08/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/08/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/08/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/12/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
Sanitary Sewer Construction Inspection Partial 2/12/2018 at 9:30 AM 02/12/2018
PW-Main inspection
Informational
02/12/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
Sanitary Sewer Construction Inspection Partial 2/12/2018 at 3:00 PM 02/12/2018
PW-Main inspection
Informational
02/12/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
02/12/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
Sanitary Sewer Construction Inspection Partial 2/13/2018 at 9:30 AM 02/13/2018
PW-Main inspection
Informational
02/12/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
02/12/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
Sanitary Sewer Construction Inspection Partial 2/13/2018 at 1:30 PM 02/13/2018
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
PW-Main inspection
Corrective Action Required
02/13/2018
Matt Munger 02/13/2018 1:45 PM Spoke with Daniel from KAT and explained to him the 8" sanitary sewer stub that was installed that I don't have revisions for I can't do a proper inspection on until I know exactly what the plans revised plans call for. I let Daniel know what they had installed was at their own risk. I had also talked to TJ on the phone about not being able to do a proper inspection as well without having the updated approved plans with the changes that were done.
Sanitary Sewer - Invert Partial 2/14/2018 at 9:40 AM 02/14/2018
PW-Misc
Informational
02/09/2018
I came by this morning and talked with Daniel. They finished pouring the inverts for sanitary MH a-3 and a-4. I was not able to get back out in the afternoon, but jeremy and John went out for me in the afternoon.Steve Robbins 02/09/2018 3:44 PM
PW-Misc
Informational
02/14/2018
Matt Munger 02/14/2018 9:57 AM I opened up MH A-3 and A-4 and observed the inverts that had been poured. The inverts were smooth and flowed in the proper direction.
Storm Sewer Construction Inspection Partial 2/14/2018 at 9:15 AM 02/14/2018
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/02/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
Storm Sewer Construction Inspection Partial 2/14/2018 at 3:25 PM 02/14/2018
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
Storm Sewer Construction Inspection Partial 2/15/2018 at 10:10 AM 02/15/2018
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
02/14/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
Sanitary Sewer - Invert Partial 2/15/2018 at 2:40 PM 02/15/2018
PW-Misc
Informational
02/14/2018
I came by this morning and talked with Daniel. They finished pouring the inverts for sanitary MH a-3 and a-4. I was not able to get back out in the afternoon, but jeremy and John went out for me in the afternoon.Steve Robbins 02/09/2018 3:44 PM
PW-Misc
Informational
02/14/2018
Matt Munger 02/14/2018 9:57 AM I opened up MH A-3 and A-4 and observed the inverts that had been poured. The inverts were smooth and flowed in the proper direction.
PW-Misc
Informational
02/15/2018
Matt Munger 02/15/2018 3:06 PM Opened up manholes B-1, B-2, B-3 and C-1. All inverts were smooth and formed correctly. I did see something in B-2 that I will have another inspector look at, at a later time. The invert at the upstream pipe looks as if there is a little bit of water sitting. Will return to do a follow up inspection to see if there is an issue.
Storm Sewer Construction Inspection Partial 2/15/2018 at 2:40 PM 02/15/2018
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
Sanitary Sewer - Invert Partial 2/16/2018 at 9:08 AM 02/16/2018
PW-Misc
Informational
02/15/2018
I came by this morning and talked with Daniel. They finished pouring the inverts for sanitary MH a-3 and a-4. I was not able to get back out in the afternoon, but jeremy and John went out for me in the afternoon.Steve Robbins 02/09/2018 3:44 PM
PW-Misc
Informational
02/15/2018
Matt Munger 02/14/2018 9:57 AM I opened up MH A-3 and A-4 and observed the inverts that had been poured. The inverts were smooth and flowed in the proper direction.
PW-Misc
Informational
02/15/2018
Matt Munger 02/15/2018 3:06 PM Opened up manholes B-1, B-2, B-3 and C-1. All inverts were smooth and formed correctly. I did see something in B-2 that I will have another inspector look at, at a later time. The invert at the upstream pipe looks as if there is a little bit of water sitting. Will return to do a follow up inspection to see if there is an issue.
PW-Misc
Corrective Action Required
02/16/2018
Matt Munger 02/16/2018 9:50 AM Tom C. and I looked at MH B-2 to double check the area that I was concerned about. Tom thought maybe the invert could be ground down a bit to avoid holding water.
Sanitary Sewer Construction Inspection Partial 2/16/2018 at 1:40 PM 02/16/2018
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
02/13/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
PW-Main inspection
Corrective Action Required
02/13/2018
Matt Munger 02/13/2018 1:45 PM Spoke with Daniel from KAT and explained to him the 8" sanitary sewer stub that was installed that I don't have revisions for I can't do a proper inspection on until I know exactly what the plans revised plans call for. I let Daniel know what they had installed was at their own risk. I had also talked to TJ on the phone about not being able to do a proper inspection as well without having the updated approved plans with the changes that were done.
PW-Main inspection
Corrective Action Required
02/16/2018
Matt Munger 02/16/2018 1:52 PM KAT was working on putting the sanitary sewer stub line that has not been approved and I have yet to receive the revised plans for. I spoke with Daniel and informed him that I cant do any inspections on the line until I have plans and that installing the line is at their own risk. Daniel stated that he was doing what he was told to do.
Site Visit Partial 2/20/2018 at 11:30 AM 02/20/2018
PW-Misc
Informational
02/08/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/08/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/08/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/08/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/08/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/08/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/08/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/08/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/08/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/08/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/08/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/08/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/08/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/08/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/08/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/08/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/08/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/08/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/08/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/08/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/08/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/08/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/08/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/08/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/08/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
02/20/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
Erosion Control Inspection Partial 2/21/2018 at 2:05 PM 02/21/2018
PW-Misc
Informational
02/12/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
02/12/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/12/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/12/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
02/12/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/12/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/12/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/12/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
02/21/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
Site Visit Partial 2/23/2018 at 8:55 AM 02/23/2018
PW-Misc
Informational
02/20/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/20/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/20/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/20/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/20/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/20/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/20/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/20/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/20/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/20/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/20/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/20/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/20/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/20/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/20/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/20/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/20/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/20/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/20/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/20/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/20/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/20/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/20/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/20/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/20/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
02/20/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
02/23/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
Erosion Control Inspection Partial 2/26/2018 at 9:29 AM 02/26/2018
PW-Misc
Informational
02/21/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
02/21/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/21/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/21/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
02/21/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/21/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/21/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/21/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
02/21/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
PW-Misc
Informational
02/26/2018
Matt Munger 02/26/2018 9:31 AM ESC is in place, there is two small sections on the west side that have fallen down that will need to be pulled back up. The construction entrance is in compliance and the street leaving the site is clean. *No activity on site at this time.
Site Visit Partial 2/27/2018 at 10:02 AM 02/27/2018
PW-Misc
Informational
02/23/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/23/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/23/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/23/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/23/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/23/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/23/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/23/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/23/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/23/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/23/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/23/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/23/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/23/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/23/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/23/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/23/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/23/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/23/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/23/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/23/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/23/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/23/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/23/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/23/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
02/23/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
02/23/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
02/27/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
Site Visit Partial 2/28/2018 at 1:50 PM 02/28/2018
PW-Misc
Informational
02/27/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/27/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/27/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/27/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/27/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/27/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/27/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/27/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/27/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/27/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/27/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/27/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/27/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/27/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/27/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/27/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/27/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/27/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/27/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/27/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/27/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/27/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/27/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/27/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/27/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
02/27/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
02/27/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
02/27/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
02/28/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
Site Visit Partial 3/1/2018 at 8:12 AM 03/01/2018
PW-Misc
Informational
02/28/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
02/28/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
02/28/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
02/28/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
02/28/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
02/28/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
02/28/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
02/28/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
02/28/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
02/28/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
02/28/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
02/28/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
02/28/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
02/28/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
02/28/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
02/28/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
02/28/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
02/28/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
02/28/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
02/28/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
02/28/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
02/28/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
02/28/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
02/28/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
02/28/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
02/28/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
02/28/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
02/28/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
02/28/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/01/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
Site Visit Partial 3/2/2018 at 2:32 PM 03/02/2018
PW-Misc
Informational
03/01/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/01/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/01/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/01/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/01/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/01/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/01/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/01/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/01/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/01/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/01/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/01/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/01/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/01/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/01/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/01/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/01/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/01/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/01/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/01/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/01/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/01/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/01/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/01/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/01/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/01/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/01/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/01/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/01/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/01/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/02/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
Erosion Control Inspection Partial 3/2/2018 at 2:55 PM 03/02/2018
PW-Misc
Informational
02/26/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
02/26/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/26/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/26/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
02/26/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
02/26/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/26/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
02/26/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
02/26/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
PW-Misc
Informational
02/26/2018
Matt Munger 02/26/2018 9:31 AM ESC is in place, there is two small sections on the west side that have fallen down that will need to be pulled back up. The construction entrance is in compliance and the street leaving the site is clean. *No activity on site at this time.
PW-Misc
Informational
03/02/2018
Matt Munger 03/02/2018 3:09 PM ESC was in place, mulch berms were put on the NE side of the site. The street exitng the construction entrance will need to be cleaned off.
Storm - Material Verification Partial 3/2/2018 at 3:05 PM 03/02/2018
Informational
03/02/2018
Matt Munger 03/02/2018 3:13 PM Storm box lids were set over on the NE corner of the site. The manhole lids had City of Lee's Summit and Storm stamped on them.
Site Visit Partial 3/8/2018 at 10:04 AM 03/05/2018
PW-Misc
Informational
03/02/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/02/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/02/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/02/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/02/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/02/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/02/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/02/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/02/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/02/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/02/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/02/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/02/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/02/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/02/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/02/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/02/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/02/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/02/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/02/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/02/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/02/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/02/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/02/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/02/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/02/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/02/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/02/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/02/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/02/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/02/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/05/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
Site Visit Partial 3/6/2018 at 1:05 PM 03/06/2018
PW-Misc
Informational
03/05/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/05/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/05/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/05/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/05/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/05/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/05/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/05/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/05/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/05/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/05/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/05/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/05/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/05/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/05/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/05/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/05/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/05/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/05/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/05/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/05/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/05/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/05/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/05/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/05/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/05/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/05/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/05/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/05/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/05/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/05/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/05/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
PW-Misc
Informational
03/06/2018
Matt Munger 03/06/2018 1:14 PM Grading work was being done on the north, northeast area of the site. KC Test Lab was on site.
Site Visit Partial 3/7/2018 at 1:50 PM 03/07/2018
PW-Misc
Informational
03/06/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/06/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/06/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/06/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/06/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/06/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/06/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/06/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/06/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/06/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/06/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/06/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/06/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/06/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/06/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/06/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/06/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/06/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/06/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/06/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/06/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/06/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/06/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/06/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/06/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/06/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/06/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/06/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/06/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/06/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/06/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/06/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
PW-Misc
Informational
03/06/2018
Matt Munger 03/06/2018 1:14 PM Grading work was being done on the north, northeast area of the site. KC Test Lab was on site.
PW-Misc
Informational
03/07/2018
Matt Munger 03/07/2018 2:03 PM Workers were grading out the SE corner of the propery. KC Test Lab was on site. New stakes were put in for the next phase of work.
Site Visit Partial 3/8/2018 at 10:30 AM 03/08/2018
PW-Misc
Informational
03/07/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/07/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/07/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/07/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/07/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/07/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/07/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/07/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/07/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/07/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/07/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/07/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/07/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/07/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/07/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/07/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/07/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/07/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/07/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/07/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/07/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/07/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/07/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/07/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/07/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/07/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/07/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/07/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/07/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/07/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/07/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/07/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
PW-Misc
Informational
03/07/2018
Matt Munger 03/06/2018 1:14 PM Grading work was being done on the north, northeast area of the site. KC Test Lab was on site.
PW-Misc
Informational
03/07/2018
Matt Munger 03/07/2018 2:03 PM Workers were grading out the SE corner of the propery. KC Test Lab was on site. New stakes were put in for the next phase of work.
PW-Misc
Informational
03/08/2018
Matt Munger 03/08/2018 10:30 AM Delivered the plans for the rip rap to TJ. Monday they will start on the sanitary lines..
Storm Sewer Construction Inspection Partial 3/12/2018 at 8:25 AM 03/12/2018
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
02/15/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
Storm Sewer Construction Inspection Partial 3/12/2018 at 11:00 AM 03/12/2018
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
Storm Sewer Construction Inspection Partial 3/12/2018 at 1:55 PM 03/12/2018
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
Erosion Control Inspection Partial 3/12/2018 at 2:15 PM 03/12/2018
PW-Misc
Informational
03/02/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
03/02/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/02/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/02/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
03/02/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
03/02/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/02/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/02/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
03/02/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
PW-Misc
Informational
03/02/2018
Matt Munger 02/26/2018 9:31 AM ESC is in place, there is two small sections on the west side that have fallen down that will need to be pulled back up. The construction entrance is in compliance and the street leaving the site is clean. *No activity on site at this time.
PW-Misc
Informational
03/02/2018
Matt Munger 03/02/2018 3:09 PM ESC was in place, mulch berms were put on the NE side of the site. The street exitng the construction entrance will need to be cleaned off.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/12/2018
Matt Munger 03/12/2018 2:15 PM The area on the north where dirt has been moved I did not observe ESC in place. ESC will need to be in place to be in compliance.
Storm - Material Verification Partial 3/13/2018 at 9:35 AM 03/13/2018
Informational
03/13/2018
Matt Munger 03/13/2018 10:02 AM I looked over the private storm boxes on site on the NE hill side and several that were set out. I measured the bases and saw that they were approximately 8" thick and and came out approximately 6".
Storm Sewer Construction Inspection Partial 3/13/2018 at 10:15 AM 03/13/2018
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/12/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
Storm Sewer Construction Inspection Partial 3/13/2018 at 1:05 PM 03/13/2018
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
Sanitary Sewer Construction Inspection Partial 3/13/2018 at 1:50 PM 03/13/2018
PW-Main inspection
Informational
02/16/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
02/16/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
02/16/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
PW-Main inspection
Corrective Action Required
02/16/2018
Matt Munger 02/13/2018 1:45 PM Spoke with Daniel from KAT and explained to him the 8" sanitary sewer stub that was installed that I don't have revisions for I can't do a proper inspection on until I know exactly what the plans revised plans call for. I let Daniel know what they had installed was at their own risk. I had also talked to TJ on the phone about not being able to do a proper inspection as well without having the updated approved plans with the changes that were done.
PW-Main inspection
Corrective Action Required
02/16/2018
Matt Munger 02/16/2018 1:52 PM KAT was working on putting the sanitary sewer stub line that has not been approved and I have yet to receive the revised plans for. I spoke with Daniel and informed him that I cant do any inspections on the line until I have plans and that installing the line is at their own risk. Daniel stated that he was doing what he was told to do.
PW-Main inspection
Informational
03/13/2018
Matt Munger 03/13/2018 2:03 PM There are 5 cleanouts installed on the revised 8" line that from Sta. 0+99.95 to Sta. 3+47.13. The line was installed prior to any plan revisions (see other inspections). KAT exposed the new 6" that connects to Sta. 2+97.87 closest to where the stub will be connected to the future building.
Storm Sewer Construction Inspection Partial 3/14/2018 at 9:05 AM 03/14/2018
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/13/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
Storm Sewer Construction Inspection Partial 3/14/2018 at 1:35 PM 03/14/2018
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 1:48 PM KAT had installed the storm pipe from CI 1-5 to CI 5-1 and had CI 5-1 set in place. I did observe and adequate amount of gravel above and below the pipe. KAT was working on installing the pipe from CI 4-2 to CI 4-3. KC Test Lab was present on site.
Storm Sewer Construction Inspection Partial 3/14/2018 at 3:00 PM 03/14/2018
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 1:48 PM KAT had installed the storm pipe from CI 1-5 to CI 5-1 and had CI 5-1 set in place. I did observe and adequate amount of gravel above and below the pipe. KAT was working on installing the pipe from CI 4-2 to CI 4-3. KC Test Lab was present on site.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 3:11 PM KAT was working on installing the storm pipe from CI 1-4 to CI 6-1. They had not set CI 6-1 when I was on site. I did observe an addequate amount of gravel above and below the pipe. KAT was using a laser in the storm box ensure proper alignment. KAT was backfilling in lifts. Note: KC Test Lab was present to test the lifts.
Storm - Outlet Structure Partial 3/15/2018 at 11:10 AM 03/15/2018
PW-Misc
Informational
03/15/2018
Matt Munger 03/15/2018 11:30 AM KAT had installed the flared end section and the toe wall. The length of the toe wall was approximately 24" and where the flared end section was set into the toe wall there was approximately 14" of toe wall exposed. Each side of the flared end section there was at least 15" of concrete on either side of the flared end section. The workers had not installed the rip rap just yet.
Storm Sewer Construction Inspection Partial 3/15/2018 at 11:35 AM 03/15/2018
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 1:48 PM KAT had installed the storm pipe from CI 1-5 to CI 5-1 and had CI 5-1 set in place. I did observe and adequate amount of gravel above and below the pipe. KAT was working on installing the pipe from CI 4-2 to CI 4-3. KC Test Lab was present on site.
PW-Storm Sewer Inspection
Informational
03/14/2018
Matt Munger 03/14/2018 3:11 PM KAT was working on installing the storm pipe from CI 1-4 to CI 6-1. They had not set CI 6-1 when I was on site. I did observe an addequate amount of gravel above and below the pipe. KAT was using a laser in the storm box ensure proper alignment. KAT was backfilling in lifts. Note: KC Test Lab was present to test the lifts.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/15/2018 11:35 AM KAT had poured the collars on the storm pipe for the curb inlets that were installed on 3/13/18 to 3/14/18. They were trying to get ahead of the rain and have everything backfilled .
Site Visit Partial 3/16/2018 at 12:50 PM 03/16/2018
PW-Misc
Informational
03/08/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/08/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/08/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/08/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/08/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/08/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/08/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/08/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/08/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/08/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/08/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/08/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/08/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/08/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/08/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/08/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/08/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/08/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/08/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/08/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/08/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/08/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/08/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/08/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/08/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/08/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/08/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/08/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/08/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/08/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/08/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/08/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
PW-Misc
Informational
03/08/2018
Matt Munger 03/06/2018 1:14 PM Grading work was being done on the north, northeast area of the site. KC Test Lab was on site.
PW-Misc
Informational
03/08/2018
Matt Munger 03/07/2018 2:03 PM Workers were grading out the SE corner of the propery. KC Test Lab was on site. New stakes were put in for the next phase of work.
PW-Misc
Informational
03/08/2018
Matt Munger 03/08/2018 10:30 AM Delivered the plans for the rip rap to TJ. Monday they will start on the sanitary lines..
PW-Misc
Informational
03/16/2018
Matt Munger 03/16/2018 12:55 PM No activity on site.
Erosion Control Inspection Partial 3/20/2018 at 1:40 PM 03/20/2018
PW-Misc
Informational
03/12/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
03/12/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/12/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/12/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
03/12/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
03/12/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/12/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/12/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
03/12/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
PW-Misc
Informational
03/12/2018
Matt Munger 02/26/2018 9:31 AM ESC is in place, there is two small sections on the west side that have fallen down that will need to be pulled back up. The construction entrance is in compliance and the street leaving the site is clean. *No activity on site at this time.
PW-Misc
Informational
03/12/2018
Matt Munger 03/02/2018 3:09 PM ESC was in place, mulch berms were put on the NE side of the site. The street exitng the construction entrance will need to be cleaned off.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/12/2018
Matt Munger 03/12/2018 2:15 PM The area on the north where dirt has been moved I did not observe ESC in place. ESC will need to be in place to be in compliance.
PW-Misc
Informational
03/20/2018
Matt Munger 03/20/2018 2:07 PM I walked along the silt fence to see if there were any issues with silt leaving the site. The SW the HDPE pipe has fallen on the fence. The fence is intact and I did not observe any signs of silt getting past the silt fence. The curb inlets that were installed had rip rap and silt fence in place to keep silt out of the storm sewer. I had emailed TJ about what his plan was to address the ESC on the NW corner and he sent that request to his Engineer.
Erosion Control Inspection Partial 3/21/2018 03/21/2018
PW-Misc
Corrective Action Required
03/21/2018
test
Site Visit Partial 3/21/2018 at 10:34 AM 03/21/2018
PW-Misc
Informational
03/21/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
Storm Sewer Construction Inspection Partial 3/22/2018 at 2:45 PM 03/22/2018
PW-Storm Sewer Inspection
Informational
03/22/2018
Matt Munger 03/22/2018 3:06 PM KAT had installed the storm pipe from MH 8-3 to CI 8-4, CI 8-5, and CI 8-6. There was an adequate amount of gravel below the pipe and the areas where they had started to backfill I observed an adequate amount gravel above the pipe. KC Test Lab was on site. Brett (KAT) said they were going to set CI 8-7, CI 8-8 and CI 8-9 on Friday if the weather was ok.
Storm Sewer Construction Inspection Partial 3/23/2018 at 9:30 AM 03/23/2018
PW-Storm Sewer Inspection
Informational
03/22/2018
Matt Munger 03/22/2018 3:06 PM KAT had installed the storm pipe from MH 8-3 to CI 8-4, CI 8-5, and CI 8-6. There was an adequate amount of gravel below the pipe and the areas where they had started to backfill I observed an adequate amount gravel above the pipe. KC Test Lab was on site. Brett (KAT) said they were going to set CI 8-7, CI 8-8 and CI 8-9 on Friday if the weather was ok.
PW-Storm Sewer Inspection
Informational
03/23/2018
Matt Munger 03/23/2018 9:43 AM KAT had poured the collars for MH 8-3, CI 8-4, CI 8-5, and CI 8-6. They had set CI 8-7 but have not installed gravel or pipe. There was an adequate amount of gravel below CI 8-7. I checked the inverts for CI 6-1, CI 1-5, CI5-1, CI 4-2, CI 4-3, CI 3-1, and CI 1-4. All of the inverts were formed smooth. I did observe some small amount of gravel but nothing to be concerned of. I opened up the manhole for CI 1-3 and noticed there was some standing water in the invert. CI 1-2 had silt built up in the invert that will need to be cleaned out.
Site Visit Partial 3/26/2018 at 10:06 AM 03/26/2018
PW-Misc
Informational
03/21/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
PW-Misc
Informational
03/26/2018
Matt Munger 03/26/2018 10:06 AM No activity on site due to the rain.
Site Visit Partial 3/27/2018 at 1:00 PM 03/27/2018
PW-Misc
Informational
03/26/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
PW-Misc
Informational
03/26/2018
Matt Munger 03/26/2018 10:06 AM No activity on site due to the rain.
PW-Misc
Informational
03/27/2018
Matt Munger 03/27/2018 1:00 PM No activity on site due to the weather. Fencing has been installed by the entrances not allowing access into the site.
Erosion Control Inspection Partial 3/27/2018 at 1:00 PM 03/27/2018
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/27/2018
Matt Munger 03/27/2018 1:23 PM I walked along the silt fence on the west side and did not see any signs that silt has gotten past the silt fence. The HDPE storm pipe on the SW corner is sitting on top of the silt fence but there were no signs that silt has gotten past the silt fence. The rip rap around CI 1-2 and 1-3 has washed out a bit and the silt fence has been pulled down into the inlet 1-3 and should be pulled back up. There isn't any ESC in place for the NW corner of the site where they have done off-site grading. I have asked TJ to come up with and ESC plan since there is nothing in place. TJ sent in a request for his Engineer to come up with a plan and is waiting on that. It does not appear that there is any silt that has left the site in the NW corner. I spoke with Bryan on site with the Erosion Control Company and pointed out the concerns I had.
Site Visit Partial 3/28/2018 at 11:22 AM 03/28/2018
PW-Misc
Informational
03/27/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
PW-Misc
Informational
03/27/2018
Matt Munger 03/26/2018 10:06 AM No activity on site due to the rain.
PW-Misc
Informational
03/27/2018
Matt Munger 03/27/2018 1:00 PM No activity on site due to the weather. Fencing has been installed by the entrances not allowing access into the site.
PW-Misc
Informational
03/28/2018
Matt Munger 03/28/2018 11:26 AM No activity on site due to the weather. Engineering Solutions was surveying the area to the east.
Site Visit Partial 3/30/2018 at 8:20 AM 03/30/2018
PW-Misc
Informational
03/28/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
PW-Misc
Informational
03/28/2018
Matt Munger 03/26/2018 10:06 AM No activity on site due to the rain.
PW-Misc
Informational
03/28/2018
Matt Munger 03/27/2018 1:00 PM No activity on site due to the weather. Fencing has been installed by the entrances not allowing access into the site.
PW-Misc
Informational
03/28/2018
Matt Munger 03/28/2018 11:26 AM No activity on site due to the weather. Engineering Solutions was surveying the area to the east.
PW-Misc
Informational
03/30/2018
Matt Munger 03/30/2018 8:42 AM Delivered the revised retention basin plans to TJ, I informed him that there will need to be as-builts for the retention basin after it has been finished and submitted to show that it was built as the plans show. TJ, had informed me that he wants to wait on tearing up the existing road and have a temporary section of road to tie-in the new section into the old, so they can meet the requirements to be able to go vertical. TJ also stated he would like to start on the water line in a week or so when the storm is done. I informed TJ that I wanted to make sure we get the public sanitary tested prior to any pavement work being done.
Site Visit Partial 4/3/2018 at 10:37 AM 04/03/2018
PW-Misc
Informational
03/30/2018
Matt Munger 03/21/2018 10:35 AM No utility work was going on, contractors were working on building pad.
PW-Misc
Informational
03/30/2018
Matt Munger 03/26/2018 10:06 AM No activity on site due to the rain.
PW-Misc
Informational
03/30/2018
Matt Munger 03/27/2018 1:00 PM No activity on site due to the weather. Fencing has been installed by the entrances not allowing access into the site.
PW-Misc
Informational
03/30/2018
Matt Munger 03/28/2018 11:26 AM No activity on site due to the weather. Engineering Solutions was surveying the area to the east.
PW-Misc
Informational
03/30/2018
Matt Munger 03/30/2018 8:42 AM Delivered the revised retention basin plans to TJ, I informed him that there will need to be as-builts for the retention basin after it has been finished and submitted to show that it was built as the plans show. TJ, had informed me that he wants to wait on tearing up the existing road and have a temporary section of road to tie-in the new section into the old, so they can meet the requirements to be able to go vertical. TJ also stated he would like to start on the water line in a week or so when the storm is done. I informed TJ that I wanted to make sure we get the public sanitary tested prior to any pavement work being done.
PW-Misc
Informational
04/03/2018
Matt Munger 04/03/2018 10:52 AM No activity on site.
Sanitary Sewer - Air Test Partial 4/19/2018 at 11:35 AM 04/19/2018
PW-Sanitary Sewer Testing
Informational
04/19/2018
Matt Munger 04/19/2018 11:36 AM Sanitary Sewer Testing needs to be completed. I spoke with Brett (KAT) about testing and he wasn't sure if he would be doing the testing or not. I informed him that we will need to do the public section before the pavement starts to go in case there is an issue with the main to avoid having to dig up the line with pavement on top. I have informed TJ on a prior visit so he would be aware that we should test the line prior to any pavement work, to avoid any issues/delays if there is a problem that needs to be fixed.
Sanitary Sewer - Air Test Partial 4/24/2018 at 10:04 AM 04/24/2018
PW-Sanitary Sewer Testing
Informational
04/19/2018
Matt Munger 04/19/2018 11:36 AM Sanitary Sewer Testing needs to be completed. I spoke with Brett (KAT) about testing and he wasn't sure if he would be doing the testing or not. I informed him that we will need to do the public section before the pavement starts to go in case there is an issue with the main to avoid having to dig up the line with pavement on top. I have informed TJ on a prior visit so he would be aware that we should test the line prior to any pavement work, to avoid any issues/delays if there is a problem that needs to be fixed.
PW-Sanitary Sewer Testing
Informational
04/24/2018
Matt Munger 04/24/2018 10:26 AM Sanitary Sewer Testing needs to be completed. I opened up the public manhole to see if the lift hooks have been grouted and they have not. I spoke with TJ about testing and asked that we try and get a time setup. TJ stated he would have a meeting at 1pm and bring up the need for testing with KAT.
Site Visit Partial 5/22/2018 at 1:30 PM 05/22/2018
PW-Misc
Informational
03/16/2018
Matt Munger 12/04/2017 11:56 AM Looked a the valves that are off on Hollywood and Cheddington to see if they match LS Mapper. Spoke with T.J. while he was on site.
PW-Misc
Informational
03/16/2018
Matt Munger 12/06/2017 10:25 AM Met with TJ to discuss clearing trees on the west side of the property. Brought Bob Burns out to discuss any ROW questions. Looked over the plans with TJ and he showed me some areas he was concerned about. I pointed out to him that we should get a detail for the Rip Rap that is to go in on the west side of the property.
PW-Misc
Informational
03/16/2018
Matt Munger 12/07/2017 9:46AM Met with TJ and spoke about the rip rap detail for the west side of the property. I informed him that Gene was working on getting a detail for it.
PW-Misc
Informational
03/16/2018
Matt Munger 12/08/2017 9:15 AM Delivered the FDP plans to TJ, spoke with Justin from Kat about the utilites. Took down some notes that they had questions about.
PW-Misc
Informational
03/16/2018
Matt Munger 12/13/2017 11:00 AM Tom C. and I went out on site to check on the progress. I observed workers stripping ground and silt fence was still intact. TJ had brought up that they found two ponds on site and he was having a company come out and do compaction tests so they can address the issue. One of the ponds is where the public roadway is going to be put in. TJ stated the plan was to try and start Friday with the sanitary sewer but due to the pond issue that may get pushed back.
PW-Misc
Informational
03/16/2018
Matt Munger 12/21/2017 2:10 PM Curb Inlet 1-2 had been installed prior to my arrival. I did not see the flared end section installed. The silt fence behind CI 1-2 was taken down from the work that was done to install the curb inlet. The silt fence will need to be put back in place.
PW-Misc
Informational
03/16/2018
Tom Chandler 12/22/2017 4:22 PM No utility work being done today. Contractor said will begin work on Wednesday 12/27/2017 again.
PW-Misc
Informational
03/16/2018
Matt Munger 12/28/2017 9:44 AM No workers were present due to the weather. The silt fence on the west side by the curb inlet will need to be put back up.
PW-Misc
Informational
03/16/2018
Matt Munger 12/29/2017 11:11 AM No workers were present due to the weather. I messaged Daniel with Kat said next week was not looking good either due to the weather.
PW-Misc
Corrective Action Required
03/16/2018
Matt Munger 01/02/2018 10:45 AM No workers were present due to the weather. Silt fence on the west side is down due to construction in that area but will need to be put back up. The site is clean and construction entrance is in place and the roadway is free of mud and debris.
PW-Misc
Informational
03/16/2018
Matt Munger 01/04/2018 8:59 AM No work was being done on site. Spoke with TJ about the weather and the work schedule.
PW-Misc
Informational
03/16/2018
Matt Munger 01/08/2018 9:40 AM No workers were present.
PW-Misc
Informational
03/16/2018
Matt Munger 01/08/2018 10:58 AM No work was being done on site.
PW-Misc
Informational
03/16/2018
Matt Munger 01/09/2018 11:13 AM No work was being done on site do to the recent weather. Overall the site appeared to be free of trash and debris and the streets were clean leaving the site. I noted the concern about the silt fence on the west side in a ESC Inspection.
PW-Misc
Informational
03/16/2018
Matt Munger 01/11/2018 10:35 AM No workers were present due to the weather. The silt fence on the west side is still down. TJ responded by email 1/10/18 stating he would take care of it.
PW-Misc
Informational
03/16/2018
Matt Munger 01/12/2018 1:52 PM No workers were present.
PW-Misc
Informational
03/16/2018
Matt Munger 01/16/2018 10:50 AM No work was being done on site due to the weather.
PW-Misc
Informational
03/16/2018
Matt Munger 01/17/2018 11:10 AM Spoke with the Kat workers that were on site working on getting the equipment started. I had also sent an email to TJ in regards to the material submittal's that were sent in and the concerns that I had with the geogrid and Type 3 surface asphalt that was submitted.
PW-Misc
Informational
03/16/2018
Matt Munger 01/18/2018 10:45 AM No workers were present on site due to the weather.
PW-Misc
Informational
03/16/2018
Matt Munger 01/23/2018 2:50 PM No workers were present.
PW-Misc
Informational
03/16/2018
Matt Munger 01/24/2018 10:30 AM No work was being done on site.
PW-Misc
Informational
03/16/2018
Matt Munger 01/29/2018 9:37 AM TJ stated Justin from Kat Excavation will be on site tomorrow to try and work.
PW-Misc
Informational
03/16/2018
Matt Munger 01/30/2018 2:03 PM KC test lab was on the north side doing tests. He stated they were taking compaction test every 50-60ft and 9ft down. I did also observe fly ash being hauled in. KC Test Lab employee stated they were using it to dry up the soil.
PW-Misc
Informational
03/16/2018
Matt Munger 02/05/2018 9:10 AM No work was being done on site.
PW-Misc
Informational
03/16/2018
Matt Munger 02/07/2018 9:22 AM No work was being done onsite. Spoke with TJ and he stated Kat wouldn't be working till next week due to the weather.
PW-Misc
Informational
03/16/2018
Matt Munger 02/20/2018 11:30 AM No workers present due to the weather.
PW-Misc
Informational
03/16/2018
Matt Munger 02/23/2018 8:55 PM No workers were present.
PW-Misc
Informational
03/16/2018
Matt Munger 02/27/2018 10:16 AM Delivered the revised set of private sanitary plans to TJ.
PW-Misc
Informational
03/16/2018
Matt Munger 02/28/2018 1:50 PM Workers were grading the NE corners of the site. Erosion control was in place.
PW-Misc
Informational
03/16/2018
Matt Munger 03/01/2018 8:21 AM Spoke with KC Test Lab employee and he stated he would be testing the north side where they were hauling material.
PW-Misc
Informational
03/16/2018
Matt Munger 03/02/2018 2:52 PM KC Test Lab was on site where they dirt crew was grading on the north end. I spoke with TJ on site and he stated they will be staking utilities next Wednesday or Thursday. No other work was going on site. I spoke with Daniel from KAT Excavation to see about testing the public and private line but he wanted to try and do it all in one day possibly next week.
PW-Misc
Informational
03/16/2018
Matt Munger 03/05/2018 10:15 AM Workers were grading out the retention ponnd.
PW-Misc
Informational
03/16/2018
Matt Munger 03/06/2018 1:14 PM Grading work was being done on the north, northeast area of the site. KC Test Lab was on site.
PW-Misc
Informational
03/16/2018
Matt Munger 03/07/2018 2:03 PM Workers were grading out the SE corner of the propery. KC Test Lab was on site. New stakes were put in for the next phase of work.
PW-Misc
Informational
03/16/2018
Matt Munger 03/08/2018 10:30 AM Delivered the plans for the rip rap to TJ. Monday they will start on the sanitary lines..
PW-Misc
Informational
03/16/2018
Matt Munger 03/16/2018 12:55 PM No activity on site.
PW-Misc
Informational
05/22/2018
John DiMauro 05/22/2018 1:48 PM No utility or paving construction at this time. Crews are on site working on the retaining wall.
Site Visit Partial 5/23/2018 at 9:05 AM 05/24/2018
PW-Misc
Informational
05/24/2018
John DiMauro 05/24/2018 4:00 PM Site visit. No paving or utility construction today. Had a meeting with TJ about them starting the water line construction next week.
Site Visit Partial 5/31/2018 at 9:05 AM 05/31/2018
PW-Misc
Informational
05/24/2018
John DiMauro 05/24/2018 4:00 PM Site visit. No paving or utility construction today. Had a meeting with TJ about them starting the water line construction next week.
PW-Misc
Informational
05/31/2018
John DiMauro 05/31/2018 9:15 AM No utility construction this morning. Kat Excavation would like to start staking the water line today or tomorrow.
Sanitary Sewer - Mandrel Partial 6/21/2018 06/04/2018
PW-Misc
Informational
06/04/2018
John DiMauro 06/04/2018 2:27 PM No utility or paving construction.
Water Line - Construction Inspection Partial 6/6/2018 at 12:00 PM 06/08/2018
PW-Main inspection
Informational
06/08/2018
Kat Excavation started installing the water line along Hollywood Dr.
Water Line - Construction Inspection Partial 6/8/2018 at 8:15 AM 06/08/2018
PW-Main inspection
Informational
06/08/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
Water Line - Construction Inspection Partial 6/8/2018 at 10:05 AM 06/08/2018
PW-Main inspection
Informational
06/08/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
Water Line - Construction Inspection Partial 6/8/2018 at 3:00 PM 06/08/2018
PW-Main inspection
Informational
06/08/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
Water Line - Construction Inspection Partial 6/12/2018 at 9:00 AM 06/12/2018
PW-Main inspection
Informational
06/08/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/08/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/12/2018 3:33 PM KAT Excavation crews were on site working on the public and private water lines. The crews installed the 8" public water line from station 0+00 to approximately 200'ft from the fire line vault. There appears to be sufficient rock bedding and surrounding the pipe. The fittings and fire hydrant assembly appear to meet the City of Lee's Summit specs.
Water Line - Construction Inspection Partial 6/12/2018 at 1:00 PM 06/12/2018
PW-Main inspection
Informational
06/12/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/12/2018 3:33 PM KAT Excavation crews were on site working on the public and private water lines. The crews installed the 8" public water line from station 0+00 to approximately 200'ft from the fire line vault. There appears to be sufficient rock bedding and surrounding the pipe. The fittings and fire hydrant assembly appear to meet the City of Lee's Summit specs.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/12/2018 3:39 PM The KAT Excavation crew installed the 8" public water line from station 0+00 to the backflow assembly. The crew plans to finish the install this week.
Commercial Curb Inspection Passed 6/12/2018 at 2:00 PM 06/12/2018
Informational
06/12/2018
John DiMauro 06/12/2018 3:42 PM Inspection for the curb at the south Arvest Bank approach. The sub grade appears to meet the standards.
Water Line - Construction Inspection Partial 6/13/2018 at 1:00 PM 06/13/2018
PW-Main inspection
Informational
06/12/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/12/2018 3:33 PM KAT Excavation crews were on site working on the public and private water lines. The crews installed the 8" public water line from station 0+00 to approximately 200'ft from the fire line vault. There appears to be sufficient rock bedding and surrounding the pipe. The fittings and fire hydrant assembly appear to meet the City of Lee's Summit specs.
PW-Main inspection
Informational
06/12/2018
John DiMauro 06/12/2018 3:39 PM The KAT Excavation crew installed the 8" public water line from station 0+00 to the backflow assembly. The crew plans to finish the install this week.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/13/2018 3:49 PM The Kat Excavation crew was continuing the water line install. The crew has the line installed through the backflow assembly and the meter vaults. The vaults are set and appear to match the plans.
Water Line - Construction Inspection Partial 6/20/2018 at 8:20 AM 06/20/2018
PW-Main inspection
Informational
06/13/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/12/2018 3:33 PM KAT Excavation crews were on site working on the public and private water lines. The crews installed the 8" public water line from station 0+00 to approximately 200'ft from the fire line vault. There appears to be sufficient rock bedding and surrounding the pipe. The fittings and fire hydrant assembly appear to meet the City of Lee's Summit specs.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/12/2018 3:39 PM The KAT Excavation crew installed the 8" public water line from station 0+00 to the backflow assembly. The crew plans to finish the install this week.
PW-Main inspection
Informational
06/13/2018
John DiMauro 06/13/2018 3:49 PM The Kat Excavation crew was continuing the water line install. The crew has the line installed through the backflow assembly and the meter vaults. The vaults are set and appear to match the plans.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/20/2018 9:54 AM KAT Excavation is working on the Fire hydrant relocation install along Cheddington Dr. FH 057-066 was taken out of service and relocated to the south of the drive approach. The fire hydrant will now be 057-081 FH. The fire hydrant was relocated according to the approved plans. The thrust blocks and kickers are poured and I verified the correct materials used.
Pavement-Stabilized Subgrade Partial 6/21/2018 at 9:00 AM 06/21/2018
PW-Misc
Informational
06/21/2018
John DiMauro 06/21/2018 12:25 PM Crews are on site installing the geogrid and base rock for the SW Cheddington Dr road extension. The location of the new install appears to match the approved plans and the materials used are acceptable under the design specs.
Sanitary Sewer - Air Test Partial 6/21/2018 at 1:00 PM 06/21/2018
PW-Sanitary Sewer Testing
Informational
04/24/2018
Matt Munger 04/19/2018 11:36 AM Sanitary Sewer Testing needs to be completed. I spoke with Brett (KAT) about testing and he wasn't sure if he would be doing the testing or not. I informed him that we will need to do the public section before the pavement starts to go in case there is an issue with the main to avoid having to dig up the line with pavement on top. I have informed TJ on a prior visit so he would be aware that we should test the line prior to any pavement work, to avoid any issues/delays if there is a problem that needs to be fixed.
PW-Sanitary Sewer Testing
Informational
04/24/2018
Matt Munger 04/24/2018 10:26 AM Sanitary Sewer Testing needs to be completed. I opened up the public manhole to see if the lift hooks have been grouted and they have not. I spoke with TJ about testing and asked that we try and get a time setup. TJ stated he would have a meeting at 1pm and bring up the need for testing with KAT.
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:20 PM The Kat Excavation crew performed the air test for the puiblic sanitary sewer segment from MH A-1 to MH A-2. MH A1 to MH A2 Start 3.9 psi End 3.8 psi Test Duration 7:34 Test Passed
Sanitary Sewer - Vacuum Partial 6/21/2018 at 12:20 PM 06/21/2018
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:27 PM The KAT Excavation crew Vacuum tested MH A-2. The MH is approximately 7'ft deep. I observed the gauge hold at 10" for 2 minutes with no drop. Test Passed.
Sanitary Sewer - Vacuum Partial 6/21/2018 at 1:20 PM 06/21/2018
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:27 PM The KAT Excavation crew Vacuum tested MH A-2. The MH is approximately 7'ft deep. I observed the gauge hold at 10" for 2 minutes with no drop. Test Passed.
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:41 PM The KAT Excavation crew Vacuum tested MH A-1. The MH is approximately 13'5"deep. I observed the gauge hold at 10" for 2.5 minutes with no drop. Test Passed. The MH A-3 test failed. The KAT crew is going to make the corrections to the MH and we will resume testing tomorrow.
Sanitary Sewer - Vacuum Partial 6/22/2018 at 9:15 AM 06/22/2018
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:27 PM The KAT Excavation crew Vacuum tested MH A-2. The MH is approximately 7'ft deep. I observed the gauge hold at 10" for 2 minutes with no drop. Test Passed.
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:41 PM The KAT Excavation crew Vacuum tested MH A-1. The MH is approximately 13'5"deep. I observed the gauge hold at 10" for 2.5 minutes with no drop. Test Passed. The MH A-3 test failed. The KAT crew is going to make the corrections to the MH and we will resume testing tomorrow.
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/22/2018 9:25 AM The KAT Excavation crew Vacuum tested MH A-3. The MH is approximately 3'ft deep. I observed the gauge at 10 for 2 minutes with a drop to 9.5 Test Passed. Test for MH A-4. the initial test failed. The crew is going to make corrections to the MH then retest. The corrections were made to MH A-4 and the test passed. MH B-1 approximately 12'ft deep. The gauge read 10 at the start of the test and dropped to 9.25 Test Passed. MH C-1 approximately 12'ft deep. The gauge read 10 at the start of the test and finished with no drop. Test Passed. MH B-3 approximately 11ft deep. The gauge read 10 at the start of the test and finished with no drop. Test Passed. MH B-2 is approximately 11.5'ft deep. The gauge read 10 at the start of the test and finished at 9.25 Test Passed.
Sanitary Sewer - Air Test Partial 6/22/2018 at 9:15 AM 06/22/2018
PW-Sanitary Sewer Testing
Informational
06/21/2018
Matt Munger 04/19/2018 11:36 AM Sanitary Sewer Testing needs to be completed. I spoke with Brett (KAT) about testing and he wasn't sure if he would be doing the testing or not. I informed him that we will need to do the public section before the pavement starts to go in case there is an issue with the main to avoid having to dig up the line with pavement on top. I have informed TJ on a prior visit so he would be aware that we should test the line prior to any pavement work, to avoid any issues/delays if there is a problem that needs to be fixed.
PW-Sanitary Sewer Testing
Informational
06/21/2018
Matt Munger 04/24/2018 10:26 AM Sanitary Sewer Testing needs to be completed. I opened up the public manhole to see if the lift hooks have been grouted and they have not. I spoke with TJ about testing and asked that we try and get a time setup. TJ stated he would have a meeting at 1pm and bring up the need for testing with KAT.
PW-Sanitary Sewer Testing
Informational
06/21/2018
John DiMauro 06/21/2018 1:20 PM The Kat Excavation crew performed the air test for the puiblic sanitary sewer segment from MH A-1 to MH A-2. MH A1 to MH A2 Start 3.9 psi End 3.8 psi Test Duration 7:34 Test Passed
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/22/2018 9:40 AM The Kat Excavation crew performed the air test for the private sanitary sewer line. MH A3 to MH A4 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH A-2 to A-3 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-1 to C-1 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-1 to B-2 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-2 to B-3 Start 4 psi End 4 psi Test Duration 7:34 Test Passed
Sanitary Sewer - Air Test Passed 6/26/2018 at 9:00 AM 06/26/2018
PW-Sanitary Sewer Testing
Informational
06/22/2018
Matt Munger 04/19/2018 11:36 AM Sanitary Sewer Testing needs to be completed. I spoke with Brett (KAT) about testing and he wasn't sure if he would be doing the testing or not. I informed him that we will need to do the public section before the pavement starts to go in case there is an issue with the main to avoid having to dig up the line with pavement on top. I have informed TJ on a prior visit so he would be aware that we should test the line prior to any pavement work, to avoid any issues/delays if there is a problem that needs to be fixed.
PW-Sanitary Sewer Testing
Informational
06/22/2018
Matt Munger 04/24/2018 10:26 AM Sanitary Sewer Testing needs to be completed. I opened up the public manhole to see if the lift hooks have been grouted and they have not. I spoke with TJ about testing and asked that we try and get a time setup. TJ stated he would have a meeting at 1pm and bring up the need for testing with KAT.
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/21/2018 1:20 PM The Kat Excavation crew performed the air test for the puiblic sanitary sewer segment from MH A-1 to MH A-2. MH A1 to MH A2 Start 3.9 psi End 3.8 psi Test Duration 7:34 Test Passed
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/22/2018 9:40 AM The Kat Excavation crew performed the air test for the private sanitary sewer line. MH A3 to MH A4 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH A-2 to A-3 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-1 to C-1 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-1 to B-2 Start 4 psi End 4 psi Test Duration 7:34 Test Passed MH B-2 to B-3 Start 4 psi End 4 psi Test Duration 7:34 Test Passed
PW-Sanitary Sewer Testing
Informational
06/26/2018
John DiMauro 06/26/2018 9:27 AM The KAT Excavation crew air tested the 8" private sanitary line segment from MH A-2 to MH B-1. MH A2 to MH B1 Start 4 psi End 3.95 psi Test Duration 8:30 Test Passed
Sanitary Sewer - Mandrel Passed 6/26/2018 at 9:30 AM 06/26/2018
PW-Misc
Informational
06/04/2018
John DiMauro 06/04/2018 2:27 PM No utility or paving construction.
PW-Misc
Informational
06/26/2018
John DiMauro 06/26/2018 10:24 AM KAT Excavation performed the mandrel test for all of the private and public sanitary sewer lines for this project. The mandrel was pulled through the system with no deflection or issues. I verified that the mandrel was correct in meeting the City of LS criteria.
Sanitary Sewer - Vacuum Passed 6/26/2018 at 10:30 AM 06/26/2018
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/21/2018 1:27 PM The KAT Excavation crew Vacuum tested MH A-2. The MH is approximately 7'ft deep. I observed the gauge hold at 10" for 2 minutes with no drop. Test Passed.
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/21/2018 1:41 PM The KAT Excavation crew Vacuum tested MH A-1. The MH is approximately 13'5"deep. I observed the gauge hold at 10" for 2.5 minutes with no drop. Test Passed. The MH A-3 test failed. The KAT crew is going to make the corrections to the MH and we will resume testing tomorrow.
PW-Sanitary Sewer Testing
Informational
06/22/2018
John DiMauro 06/22/2018 9:25 AM The KAT Excavation crew Vacuum tested MH A-3. The MH is approximately 3'ft deep. I observed the gauge at 10 for 2 minutes with a drop to 9.5 Test Passed. Test for MH A-4. the initial test failed. The crew is going to make corrections to the MH then retest. The corrections were made to MH A-4 and the test passed. MH B-1 approximately 12'ft deep. The gauge read 10 at the start of the test and dropped to 9.25 Test Passed. MH C-1 approximately 12'ft deep. The gauge read 10 at the start of the test and finished with no drop. Test Passed. MH B-3 approximately 11ft deep. The gauge read 10 at the start of the test and finished with no drop. Test Passed. MH B-2 is approximately 11.5'ft deep. The gauge read 10 at the start of the test and finished at 9.25 Test Passed.
PW-Sanitary Sewer Testing
Informational
06/26/2018
John DiMauro 06/26/2018 10:34 AM The KAT Excavation crew Vacuum tested MH A-4. The MH is approximately 2'ft deep. I observed the gauge hold at 10" for 2 minutes with no drop. Test Passed.
Pavement-Stabilized Subgrade Partial 6/27/2018 at 9:00 AM 07/02/2018
PW-Misc
Informational
06/21/2018
John DiMauro 06/21/2018 12:25 PM Crews are on site installing the geogrid and base rock for the SW Cheddington Dr road extension. The location of the new install appears to match the approved plans and the materials used are acceptable under the design specs.
PW-Misc
Informational
07/02/2018
Crews were on site working on the subgrade for the Cheddington road.
Curb - Compression Strength Partial 7/2/2018 07/02/2018
PW-Misc
Informational
07/02/2018
John DiMauro 07/02/2018 8:44 AM KC Testing Lab is on site taking samples of the curb concrete for compression testing.
Public Curb Inspection Partial 7/2/2018 at 8:20 AM 07/02/2018
Informational
07/02/2018
John DiMauro 07/02/2018 8:46 AM Crews are on site installing the curbs for the Cheddington Dr. road. I verified the correct concrete type and the location and curb detail appears to match the plans. The crew is grouting the back and faces of the curb that has been poured.
Driveway Inspection Partial 7/3/2018 at 10:00 AM 07/03/2018
PW-Misc
Informational
07/03/2018
John DiMauro 07/03/2018 2:06 PM The crews on site installed the north drive approach for the Arvest bank parking lot that connects to Cheddington Dr. There was sufficient compacted aggregate sub grade. I will return for further inspection after the concrete has cured.
Public Curb Inspection Partial 7/3/2018 at 10:30 AM 07/03/2018
Informational
07/03/2018
John DiMauro 07/03/2018 2:09 PM Crews are on site continuing the install of the curb along Cheddington Dr. I verified mix type and the curb appears to match the plans. They are grouting the back of the curb areas with honeycomb.
Driveway Inspection Partial 7/6/2018 at 9:00 AM 07/06/2018
PW-Misc
Informational
07/03/2018
John DiMauro 07/03/2018 2:06 PM The crews on site installed the north drive approach for the Arvest bank parking lot that connects to Cheddington Dr. There was sufficient compacted aggregate sub grade. I will return for further inspection after the concrete has cured.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:03 PM The crew installed the approach for the church side northeast of the bank on Cheddington Dr. I verified the sub grade prior to the pour. I will do a follow up inspection next week.
Public Curb Inspection Partial 7/10/2018 at 10:00 AM 07/10/2018
Informational
07/10/2018
John DiMauro 07/10/2018 3:01 PM Crews were on site continuing the public curb install along the west side of Cheddington Dr. I verified the location and correct concrete type. KC testing was on site performing testing on the concrete.
Public Curb Inspection Partial 7/11/2018 at 9:15 AM 07/11/2018
Informational
07/11/2018
John DiMauro 07/11/2018 10:10 AM The crews are on site installing the public curb along Cheddington Dr. I verified the concrete type.
Driveway Inspection Partial 7/17/2018 at 9:45 AM 07/17/2018
PW-Misc
Informational
07/06/2018
John DiMauro 07/03/2018 2:06 PM The crews on site installed the north drive approach for the Arvest bank parking lot that connects to Cheddington Dr. There was sufficient compacted aggregate sub grade. I will return for further inspection after the concrete has cured.
PW-Misc
Informational
07/06/2018
John DiMauro 07/06/2018 2:03 PM The crew installed the approach for the church side northeast of the bank on Cheddington Dr. I verified the sub grade prior to the pour. I will do a follow up inspection next week.
PW-Misc
Informational
07/17/2018
John DiMauro 07/17/2018 10:15 AM The crew on site installed the furthest north commercial drive approach along SW Cheddington Dr. I verified the concrete type and that the white cure was applied. Will return for further inspection once the concrete is cured.
Pavement-Aggregate Base Partial 7/17/2018 at 10:15 AM 07/17/2018
Informational
07/17/2018
John DiMauro 07/17/2018 11:43 AM Ron Paynter and I observed the grade check for SW Cheddington road expansion. Calvert Paving did the grade check. KAT Excavation plans to make the corrections to the sub grade prior to paving. We will do a follow up inspection prior to paving.
Pavement-Stabilized Subgrade Passed 7/23/2018 07/23/2018
PW-Misc
Informational
07/02/2018
John DiMauro 06/21/2018 12:25 PM Crews are on site installing the geogrid and base rock for the SW Cheddington Dr road extension. The location of the new install appears to match the approved plans and the materials used are acceptable under the design specs.
PW-Misc
Informational
07/02/2018
Crews were on site working on the subgrade for the Cheddington road.
Pavement-Aggregate Base Passed 7/23/2018 07/23/2018
Pavement-Surface Partial 7/23/2018 at 8:00 AM 07/23/2018
PW-Misc
Informational
07/23/2018
John DiMauro 07/23/2018 11:03 AM Calvert Paving is on site installing the base lift for the Cheddington Dr. street.
Pavement-Surface Partial 7/23/2018 at 11:00 AM 07/23/2018
PW-Misc
Informational
07/23/2018
John DiMauro 07/23/2018 11:03 AM Calvert Paving is on site installing the base lift for the Cheddington Dr. street.
PW-Misc
Informational
07/23/2018
John DiMauro 07/23/2018 11:04 AM Return trip to inspect the base lift for the street.
Public Curb Inspection Passed 7/23/2018 07/24/2018
Street - Surface Course Partial 7/24/2018 at 8:00 AM 07/24/2018
PW-Misc
Informational
07/24/2018
John DiMauro 07/24/2018 9:47 AM The Calvert Paving crew is on site installing the surface lift for the Cheddington Rd. I verified the asphalt type and temperature. KC Testing Lab is on site testing the asphalt.
Sanitary Sewer Construction Inspection Partial 10/4/2018 at 8:45 AM 10/04/2018
PW-Main inspection
Informational
03/13/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
03/13/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
03/13/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
PW-Main inspection
Corrective Action Required
03/13/2018
Matt Munger 02/13/2018 1:45 PM Spoke with Daniel from KAT and explained to him the 8" sanitary sewer stub that was installed that I don't have revisions for I can't do a proper inspection on until I know exactly what the plans revised plans call for. I let Daniel know what they had installed was at their own risk. I had also talked to TJ on the phone about not being able to do a proper inspection as well without having the updated approved plans with the changes that were done.
PW-Main inspection
Corrective Action Required
03/13/2018
Matt Munger 02/16/2018 1:52 PM KAT was working on putting the sanitary sewer stub line that has not been approved and I have yet to receive the revised plans for. I spoke with Daniel and informed him that I cant do any inspections on the line until I have plans and that installing the line is at their own risk. Daniel stated that he was doing what he was told to do.
PW-Main inspection
Informational
03/13/2018
Matt Munger 03/13/2018 2:03 PM There are 5 cleanouts installed on the revised 8" line that from Sta. 0+99.95 to Sta. 3+47.13. The line was installed prior to any plan revisions (see other inspections). KAT exposed the new 6" that connects to Sta. 2+97.87 closest to where the stub will be connected to the future building.
Informational
10/04/2018
John DiMauro 10/04/2018 3:18 PM I verified the sanitary service connection for building #7 was in compliance.
Sidewalk Inspection Partial 10/18/2018 at 1:15 PM 10/18/2018
PW-Misc
Informational
10/18/2018
John DiMauro 10/18/2018 1:50 PM The crew has the sidewalk formed up for the section directly in front of Arvest Bank. There appears to be sufficient compacted aggregate installed. I will return for further inspection after it has been poured.
Sanitary Sewer - Vacuum Failed 04/17/2019
Misc
Corrective Action Required
04/17/2019
Public sanitary manhole A-2 was hit and damaged by the paving company. Corrections to the manhole were attempted but the manhole failed the vacuum test. Further corrective action is required and another vacuum test will need to be performed.
Sanitary Sewer - Vacuum Passed 04/18/2019
Misc
Corrective Action Required
04/17/2019
Public sanitary manhole A-2 was hit and damaged by the paving company. Corrections to the manhole were attempted but the manhole failed the vacuum test. Further corrective action is required and another vacuum test will need to be performed.
Misc
Informational
04/18/2019
The KAT Excavation crew made the repairs to the public sanitary sewer manhole A-2. We tested the MH and I observed the gauge hold at 10 for two minutes with no drop. Test Passed.
Water Line - Coliform Test 2 Partial 04/18/2019
Misc
Informational
04/18/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Water Line - Coliform Test 1 Partial 04/23/2019
Misc
Informational
04/17/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Misc
Informational
04/23/2019
The day 1 test spot 1 sample taken on 4/17/2019 failed for total coliform. The crew started the process over according to the flow chart last week and flushed the line yesterday 4/22/2019 Today we collected the new day 1 samples for the 4” private domestic line and delivered them to Keystone Labs.
Water Line - Coliform Test 1 Failed 4/17/2019 05/01/2019
Misc
Informational
04/17/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Water Line - Coliform Test 1 Partial 4/30/2019 at 11:00 AM 05/01/2019
Misc
Informational
04/23/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Misc
Informational
04/23/2019
The day 1 test spot 1 sample taken on 4/17/2019 failed for total coliform. The crew started the process over according to the flow chart last week and flushed the line yesterday 4/22/2019 Today we collected the new day 1 samples for the 4” private domestic line and delivered them to Keystone Labs.
Misc
Informational
05/01/2019
The sample taken on 4/23/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed monday 4/29/19 We collected a day 1 sample yesterday 4/30/19 and delivered it to Keystone Lab. We will know the results later today.
Water Line - Coliform Test 1 Partial 5/8/2019 at 11:00 AM 05/08/2019
Misc
Informational
05/01/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Misc
Informational
05/01/2019
The day 1 test spot 1 sample taken on 4/17/2019 failed for total coliform. The crew started the process over according to the flow chart last week and flushed the line yesterday 4/22/2019 Today we collected the new day 1 samples for the 4” private domestic line and delivered them to Keystone Labs.
Misc
Informational
05/01/2019
The sample taken on 4/23/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed monday 4/29/19 We collected a day 1 sample yesterday 4/30/19 and delivered it to Keystone Lab. We will know the results later today.
Misc
Informational
05/08/2019
John DiMauro 05/08/2019 3:32 PM The sample taken on 4/30/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed Tuesday 5/7/19 We collected a day 1 sample today and delivered it to Keystone Lab. We will know the results in 24 hours.
Water Line - Coliform Test 2 Partial 5/9/2019 at 1:00 PM 05/09/2019
Misc
Informational
04/18/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Misc
Informational
05/09/2019
John DiMauro 05/09/2019 3:52 PM We collected the day two samples for the 4” private domestic water line. I relinquished them to inspector Ron Paynter and he delivered them to Keystone Labs. We will know the results in 24 hours. The day 1 samples collected on 5/8/2019 passed.
Water Line - Coliform Test 1 Partial 6/4/2019 at 1:00 PM 06/04/2019
Misc
Informational
05/08/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Misc
Informational
05/08/2019
The day 1 test spot 1 sample taken on 4/17/2019 failed for total coliform. The crew started the process over according to the flow chart last week and flushed the line yesterday 4/22/2019 Today we collected the new day 1 samples for the 4” private domestic line and delivered them to Keystone Labs.
Misc
Informational
05/08/2019
The sample taken on 4/23/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed monday 4/29/19 We collected a day 1 sample yesterday 4/30/19 and delivered it to Keystone Lab. We will know the results later today.
Misc
Informational
05/08/2019
John DiMauro 05/08/2019 3:32 PM The sample taken on 4/30/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed Tuesday 5/7/19 We collected a day 1 sample today and delivered it to Keystone Lab. We will know the results in 24 hours.
Misc
Informational
06/04/2019
John DiMauro 06/04/2019 4:15 PM Today we collected this round of the day 1 water samples for the 4" private domestic line and delivered them to Keystone Labs. We will know the results in 24 hours.
Water Line - Coliform Test 1 Passed 6/5/2019 06/21/2019
Misc
Informational
06/04/2019
We collected the day 1 samples for the 4”in domestic line and delivered them to the lab. We will know the results in 24 hours.
Misc
Informational
06/04/2019
The day 1 test spot 1 sample taken on 4/17/2019 failed for total coliform. The crew started the process over according to the flow chart last week and flushed the line yesterday 4/22/2019 Today we collected the new day 1 samples for the 4” private domestic line and delivered them to Keystone Labs.
Misc
Informational
06/04/2019
The sample taken on 4/23/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed monday 4/29/19 We collected a day 1 sample yesterday 4/30/19 and delivered it to Keystone Lab. We will know the results later today.
Misc
Informational
06/04/2019
John DiMauro 05/08/2019 3:32 PM The sample taken on 4/30/19 for the private 4" domestic water line failed at test spot one again. The crew chlorinated the line last week and flushed Tuesday 5/7/19 We collected a day 1 sample today and delivered it to Keystone Lab. We will know the results in 24 hours.
Misc
Informational
06/04/2019
John DiMauro 06/04/2019 4:15 PM Today we collected this round of the day 1 water samples for the 4" private domestic line and delivered them to Keystone Labs. We will know the results in 24 hours.
Misc
Informational
06/21/2019
The day 1 round of samples collected on 6/4/2019 for the 4" private domestic water line passed for bacteria testing. The Results from Keystone Labs are attached.
Water Line - Coliform Test 2 Passed 6/5/2019 06/21/2019
Misc
Informational
05/09/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Misc
Informational
05/09/2019
John DiMauro 05/09/2019 3:52 PM We collected the day two samples for the 4” private domestic water line. I relinquished them to inspector Ron Paynter and he delivered them to Keystone Labs. We will know the results in 24 hours. The day 1 samples collected on 5/8/2019 passed.
Misc
Informational
06/05/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Informational
06/21/2019
The day 2 round of samples collected on 6/5/2019 for the 4" domestic water line passed bacteria testing. The results from Keystone Labs are attached.
Sidewalk Inspection Failed 4/19/2019 07/17/2019
PW-Misc
Informational
10/18/2018
John DiMauro 10/18/2018 1:50 PM The crew has the sidewalk formed up for the section directly in front of Arvest Bank. There appears to be sufficient compacted aggregate installed. I will return for further inspection after it has been poured.
Misc
Corrective Action Required
07/17/2019
A large section of the public sidewalk along SW Cheddington failed inspection. There are sections of the sidewalk that do not meet ADA guidelines. Those sections have a cross slope greater than 2.0 percent. Corrections will need to be made to the sidewalk before acceptance.
Sidewalk Inspection Partial 07/25/2019
PW-Misc
Informational
07/17/2019
John DiMauro 10/18/2018 1:50 PM The crew has the sidewalk formed up for the section directly in front of Arvest Bank. There appears to be sufficient compacted aggregate installed. I will return for further inspection after it has been poured.
Misc
Corrective Action Required
07/17/2019
A large section of the public sidewalk along SW Cheddington failed inspection. There are sections of the sidewalk that do not meet ADA guidelines. Those sections have a cross slope greater than 2.0 percent. Corrections will need to be made to the sidewalk before acceptance.
Misc
Informational
07/25/2019
PRE POUR INSPECTION Inspection for the sidewalk section at the northwest corner of the project along SW Cheddington. This sidewalk section will service building 5. The forms are set and there appears to be sufficient compacted aggregate. I will return for a post pour final inspection at a later date.
Erosion Control Inspection Failed 08/26/2019
Misc
Corrective Action Required
08/26/2019
FAILED EROSION CONTROL INSPECTION. Erosion control devices need to be installed and maintained for the project along the east side of SW Cheddington RD. Install ESC devices with in 24 hours.
Driveway Inspection Partial 09/09/2019
Misc
Informational
09/09/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate for the commercial drive approach on the north side of SW Hollywood DR.
Sidewalk Inspection Passed 7/29/2019 09/13/2019
PW-Misc
Informational
07/25/2019
John DiMauro 10/18/2018 1:50 PM The crew has the sidewalk formed up for the section directly in front of Arvest Bank. There appears to be sufficient compacted aggregate installed. I will return for further inspection after it has been poured.
Misc
Corrective Action Required
07/25/2019
A large section of the public sidewalk along SW Cheddington failed inspection. There are sections of the sidewalk that do not meet ADA guidelines. Those sections have a cross slope greater than 2.0 percent. Corrections will need to be made to the sidewalk before acceptance.
Misc
Informational
07/25/2019
PRE POUR INSPECTION Inspection for the sidewalk section at the northwest corner of the project along SW Cheddington. This sidewalk section will service building 5. The forms are set and there appears to be sufficient compacted aggregate. I will return for a post pour final inspection at a later date.
Install Street and Stop Signs Passed 01/11/2021
ESC - (Vegetation/Ground Cover) Passed 01/11/2021
Grading/Excavation/Fill Inspection Passed 01/11/2021
PW-Misc
Informational
01/31/2018
Matt Munger 01/31/2018 10:24 AM I spoke with KC Test Lab while they were on site, he stated they were getting 97% compaction on the north side of the property. On 1/30/18 KC Test was taking compaction tests approximately every 50-60ft on the north side.
Sanitary Sewer Construction Inspection Passed 01/11/2021
Sanitary Sewer - Invert Passed 01/11/2021
PW-Misc
Informational
02/16/2018
I came by this morning and talked with Daniel. They finished pouring the inverts for sanitary MH a-3 and a-4. I was not able to get back out in the afternoon, but jeremy and John went out for me in the afternoon.Steve Robbins 02/09/2018 3:44 PM
PW-Misc
Informational
02/16/2018
Matt Munger 02/14/2018 9:57 AM I opened up MH A-3 and A-4 and observed the inverts that had been poured. The inverts were smooth and flowed in the proper direction.
PW-Misc
Informational
02/16/2018
Matt Munger 02/15/2018 3:06 PM Opened up manholes B-1, B-2, B-3 and C-1. All inverts were smooth and formed correctly. I did see something in B-2 that I will have another inspector look at, at a later time. The invert at the upstream pipe looks as if there is a little bit of water sitting. Will return to do a follow up inspection to see if there is an issue.
PW-Misc
Corrective Action Required
02/16/2018
Matt Munger 02/16/2018 9:50 AM Tom C. and I looked at MH B-2 to double check the area that I was concerned about. Tom thought maybe the invert could be ground down a bit to avoid holding water.
Storm - Material Verification Passed 01/11/2021
Storm - Outlet Structure Passed 01/11/2021
PW-Misc
Informational
03/15/2018
Matt Munger 03/15/2018 11:30 AM KAT had installed the flared end section and the toe wall. The length of the toe wall was approximately 24" and where the flared end section was set into the toe wall there was approximately 14" of toe wall exposed. Each side of the flared end section there was at least 15" of concrete on either side of the flared end section. The workers had not installed the rip rap just yet.
Storm Sewer Construction Inspection Passed 01/11/2021
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 1:48 PM KAT had installed the storm pipe from CI 1-5 to CI 5-1 and had CI 5-1 set in place. I did observe and adequate amount of gravel above and below the pipe. KAT was working on installing the pipe from CI 4-2 to CI 4-3. KC Test Lab was present on site.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 3:11 PM KAT was working on installing the storm pipe from CI 1-4 to CI 6-1. They had not set CI 6-1 when I was on site. I did observe an addequate amount of gravel above and below the pipe. KAT was using a laser in the storm box ensure proper alignment. KAT was backfilling in lifts. Note: KC Test Lab was present to test the lifts.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/15/2018 11:35 AM KAT had poured the collars on the storm pipe for the curb inlets that were installed on 3/13/18 to 3/14/18. They were trying to get ahead of the rain and have everything backfilled .
Storm Sewer Construction Inspection Passed 01/11/2021
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/30/2018 10:40 AM While on site I observed Kat workers using a laser to align the storm pipe. They had started installing pipe from CI 1-2 that had been installed on 12/21/17. I observed an adequate amount of gravel below the pipe and on top of the storm pipe. I observed Daniel from Kat using pipe dope on the spigot ends of each section of pipe that was installed. They hadn't installed storm box 2-1. Kat had started on installing storm pipe between CI 1-2 to CI 1-3.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/30/2018 1:48 PM I observed the Kat workers using a laser to align the pipe from CI 2-1 to CI 4-1. There was adequate amount of gravel below the pipe and storm boxes. They covered the pipe to the top of the trench with gravel then capped over the gravel with dirt. Daniel said they were going to backfill with gravel then cap with dirt until they cut in the road for the curb inlets that crossed over the roadway. Note: I had pointed out to Daniel earlier in the morning the storm pipe that they had installed on 12/21/17 that ran from CI 1-2 to where the end section 1-1 was going to be put in: it didn't appear there was on top of the pipe. He stated that when they installed the flared end section he will make sure there is gravel installed.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 01/31/2018 10:09 AM The concrete collars and invert for the following curb inlets had been poured prior to my arrival: CI 1-2 Invert and all collars, CI 1-3 outside collar on the west side of the inlet, CI 2-1 north and east outside collars were poured, CI 4-1 outside collar on the west side of the inlet. The collars were smooth and there was enough concrete used to support the pipe. The concrete ticket I gathered from Daniel showed it being a 4000 psi mix. The invert on CI 1-2 was smooth in all directions.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/02/2018 11:13 AM When I arrived on site, storm pipe from CI 2-1, 2-2 and 2-3 was installed prior to my arrival. They are going to pour the collars later once they get the public line in. The areas that had not been backfilled I observed an adequate amount of gravel above and below the pipe. I observed Daniel using a laser to get the correct elevation shots for CI 2-4. They were digging from 2-3 to 2-4 to be able to install CI 2-4 and storm pipe and the trench for CI 3-1 to CI 2-2.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/02/2018 1:35 PM CI 2-4 had been installed prior to my arrival. They had poured the collars and inverts for the following storm boxes before I arrived: CI 2-1, CI 4-1, CI 2-2, CI 3-1, CI 2-3 and CI 2-4. CI 4-2 the collar was poured but no the invert. The inverts that I saw appeared to be smooth and properly formed. The areas around the storm boxes that were not backfilled where the pipe and box meets I could tell there was an adequate amount of gravel above and below the pipe. On 2/1/18 I had asked Justin to save the concrete tickets or make a copy for our records and make note of where the concrete was used on the tickets. I have only received one concrete ticket so far.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/14/2018 9:42 AM KAT workers had installed Private CI 7-4, 7-5, and 7-6 prior to my arrival. I did observe an adequate amount of gravel on top of the pipe and what I could see below the pipe. They were running a string line to CI 7-7. I did see them using pipe dope and they were pushing the ends of the pipe to seat the spigot end into the bell end.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/14/2018 3:39 PM When I arrived CI 7-6, 7-7, and 12-1 had been installed. Collars were being poured while I was on site. KC Test Lab was on site testing the lifts. I did observe the KAT crew backfill in lifts. The areas around the collars that had not been backfilled had plenty of gravel above the pipe. I spoke with Daniel about getting all concrete tickets and flowable fill tickets. TJ was on site and gave me copies of the concrete tickets.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/15/2018 10:28 AM I observed KAT backfilling in lifts between CI 7-5 and CI 7-6. KAT had installed storm pipe from CI 7-7 to CI 7-8. I observed an adequate amount of gravel above the pipe. They hadn't poured the collars for the boxes on CI 7-8.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 02/15/2018 3:04 PM Kat crew was pouring collars for CI 7-7 and had everything in place for CI 7-8. KC Test Lab was on site doing compactions tests in between backfill lifts.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 8:40 AM KAT was digging the trench for the storm pipe for CI 1-4. The plan is to get CI 1-5 in today.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 11:08 AM KAT had installed the storm pipe from CI 1-3 to CI 1-4. Justin from KAT said they would be working on the 8 line later today.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/12/2018 2:12 PM KAT had installed CI 8-2, there was an adequate amount of gravel below the box.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/13/2018 10:15 AM KAT had installed storm pipe from 8-2 to 8-3 and had the box for 8-3 set in place. I did observe an adequate amount of gravel below and on top of the pipe. I did observe KAT using a laser from 8-2 to 8-3 to get proper alignment.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/13/2018 1:43 PM KAT was cutting into the existing storm box on the SE corner of the property and tied in the roof drains from the church. I spoke with TJ about putting in a new storm box and he stated they would only be replacing the lid.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 9:05 AM KAT had installed the storm pipe from CI 1-4 to CI 1-5 and had the CI 1-5 set and in place. Brett from KAT said they would have the concrete for the collars by the end of the day. I showed Brett the detail for the flared end section so he would know what exactly needed to be done when installing it. I had sent an email to TJ Watreas in regards to the old field inlet on the SE side of the property that was being re-used when the plans stated to install a new field inlet. TJ called me later in the morning and stated he would get ahold of Engineering Solutions to come up with a solution. Note: KC Test Lab was on site.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 1:48 PM KAT had installed the storm pipe from CI 1-5 to CI 5-1 and had CI 5-1 set in place. I did observe and adequate amount of gravel above and below the pipe. KAT was working on installing the pipe from CI 4-2 to CI 4-3. KC Test Lab was present on site.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/14/2018 3:11 PM KAT was working on installing the storm pipe from CI 1-4 to CI 6-1. They had not set CI 6-1 when I was on site. I did observe an addequate amount of gravel above and below the pipe. KAT was using a laser in the storm box ensure proper alignment. KAT was backfilling in lifts. Note: KC Test Lab was present to test the lifts.
PW-Storm Sewer Inspection
Informational
03/15/2018
Matt Munger 03/15/2018 11:35 AM KAT had poured the collars on the storm pipe for the curb inlets that were installed on 3/13/18 to 3/14/18. They were trying to get ahead of the rain and have everything backfilled .
Erosion Control Inspection Passed 01/11/2021
PW-Misc
Informational
03/20/2018
Matt Munger 12/11/2017 11:54 AM During my visit I walked along the newly installed silt fence to see that it was installed properly. I observed the fence trenched into the ground and staked. TJ had also extended the fence as an added step to ensure silt does not leave the site.
PW-Misc
Informational
03/20/2018
Matt Munger 12/19/2017 12:50 PM When I arrvied I observed a little bit of mud that had been track on the roadway on Chedington Dr. I spoke with TJ and Justin and just asked that they make sure to keep the roadway clean and to keep an eye on it.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/20/2018
Matt Munger 01/09/2018 11:13 AM I had noticed that the silt fence on the west side of the property had not been put up after the work that had been done on the storm inlet close to the west side. The silt fence will need to put back up to ensure silt does not leave the site.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/20/2018
Matt Munger 01/22/2018 11:07 AM Spoke with TJ (Luke Draily Construction) on site and had asked him to make sure the silt fence that is down due to prior construction gets put back up. TJ stated he had been calling the ESC company to get out and put it back up and will call them again today.
PW-Erosion and Sediment Control
Informational
03/20/2018
Matt Munger 01/30/2018 1:46 PM Silt fence was intact and the constrcution entrance was in good shape. The road was clean and free of any major debris.
PW-Misc
Informational
03/20/2018
Matt Munger 02/02/2018 1:35 PM The road was clean and ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/20/2018
Matt Munger 02/07/2018 9:22 AM ESC was in place.
PW-Devices for Erosion and Sediment Control
Informational
03/20/2018
Matt Munger 02/12/2018 9:30 AM I observed silt fence staked in front of the public curb inlets that were installed. ESC around the west side was in place. One small section on the west side will need some attention. Streets were clean, construction entrance is in good shape.
PW-Misc
Informational
03/20/2018
Matt Munger 02/21/2018 2:05 PM Silt fence was mostly intact, a couple spots on the west side need to be pulled up and secured. There was a mulch berm in place in the NE corner of the site. The new curb inlets had silt fence and rip rap in place to prevent silt from entering into them. the street was clean and the construction entrance was in good condition. No work was being done on site.
PW-Misc
Informational
03/20/2018
Matt Munger 02/26/2018 9:31 AM ESC is in place, there is two small sections on the west side that have fallen down that will need to be pulled back up. The construction entrance is in compliance and the street leaving the site is clean. *No activity on site at this time.
PW-Misc
Informational
03/20/2018
Matt Munger 03/02/2018 3:09 PM ESC was in place, mulch berms were put on the NE side of the site. The street exitng the construction entrance will need to be cleaned off.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/20/2018
Matt Munger 03/12/2018 2:15 PM The area on the north where dirt has been moved I did not observe ESC in place. ESC will need to be in place to be in compliance.
PW-Misc
Informational
03/20/2018
Matt Munger 03/20/2018 2:07 PM I walked along the silt fence to see if there were any issues with silt leaving the site. The SW the HDPE pipe has fallen on the fence. The fence is intact and I did not observe any signs of silt getting past the silt fence. I had emailed TJ about what his plan was to address the ESC on the NW corner and he sent that request to his Engineer.
Storm Sewer Construction Inspection Passed 01/11/2021
PW-Storm Sewer Inspection
Informational
03/23/2018
Matt Munger 03/22/2018 3:06 PM KAT had installed the storm pipe from MH 8-3 to CI 8-4, CI 8-5, and CI 8-6. There was an adequate amount of gravel below the pipe and the areas where they had started to backfill I observed an adequate amount gravel above the pipe. KC Test Lab was on site. Brett (KAT) said they were going to set CI 8-7, CI 8-8 and CI 8-9 on Friday if the weather was ok.
PW-Storm Sewer Inspection
Informational
03/23/2018
Matt Munger 03/23/2018 9:43 AM KAT had poured the collars for MH 8-3, CI 8-4, CI 8-5, and CI 8-6. They had set CI 8-7 but have not installed gravel or pipe. There was an adequate amount of gravel below CI 8-7. I checked the inverts for CI 6-1, CI 1-5, CI5-1, CI 4-2, CI 4-3, CI 3-1, and CI 1-4. All of the inverts were formed smooth. I did observe some small amount of gravel but nothing to be concerned of. I opened up the manhole for CI 1-3 and noticed there was some standing water in the invert. CI 1-2 had silt built up in the invert that will need to be cleaned out.
Erosion Control Inspection Passed 01/11/2021
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/27/2018
Matt Munger 03/27/2018 1:23 PM I walked along the silt fence on the west side and did not see any signs that silt has gotten past the silt fence. The HDPE storm pipe on the SW corner is sitting on top of the silt fence but there were no signs that silt has gotten past the silt fence. The rip rap around CI 1-2 and 1-3 has washed out a bit and the silt fence has been pulled down into the inlet 1-3 and should be pulled back up. There isn't any ESC in place for the NW corner of the site where they have done off-site grading. I have asked TJ to come up with and ESC plan since there is nothing in place. TJ sent in a request for his Engineer to come up with a plan and is waiting on that. It does not appear that there is any silt that has left the site in the NW corner. I spoke with Bryan on site with the Erosion Control Company and pointed out the concerns I had.
Site Visit Complete 01/11/2021
PW-Misc
Informational
05/31/2018
John DiMauro 05/24/2018 4:00 PM Site visit. No paving or utility construction today. Had a meeting with TJ about them starting the water line construction next week.
PW-Misc
Informational
05/31/2018
John DiMauro 05/31/2018 9:15 AM No utility construction this morning. Kat Excavation would like to start staking the water line today or tomorrow.
Water Line - Construction Inspection Passed 01/11/2021
PW-Main inspection
Informational
06/20/2018
Kat Excavation started installing the water line along Hollywood Dr.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/08/2018 9:30 AM Kat Excavation has the water line ran from station 0+81.22 to 9+66.85 The crew is going to pour the thrust blocks today.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/08/2018 3:34 PM The Kat Excavation crew poured the thrust blocks for the water main that is installed. I verified the correct size and concrete type.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/08/2018 5:36 PM The KAT Excavation crew removed the existing fire hydrant 057-066 and will relocate it to the other side of the drive approach per the plans. The crew tied onto the existing line and continued the run to the tie in at station 0+81.22 They poured the thrust blocks behind the fittings at the bends. I verified the concrete type and materials used.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/12/2018 3:33 PM KAT Excavation crews were on site working on the public and private water lines. The crews installed the 8" public water line from station 0+00 to approximately 200'ft from the fire line vault. There appears to be sufficient rock bedding and surrounding the pipe. The fittings and fire hydrant assembly appear to meet the City of Lee's Summit specs.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/12/2018 3:39 PM The KAT Excavation crew installed the 8" public water line from station 0+00 to the backflow assembly. The crew plans to finish the install this week.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/13/2018 3:49 PM The Kat Excavation crew was continuing the water line install. The crew has the line installed through the backflow assembly and the meter vaults. The vaults are set and appear to match the plans.
PW-Main inspection
Informational
06/20/2018
John DiMauro 06/20/2018 9:54 AM KAT Excavation is working on the Fire hydrant relocation install along Cheddington Dr. FH 057-066 was taken out of service and relocated to the south of the drive approach. The fire hydrant will now be 057-081 FH. The fire hydrant was relocated according to the approved plans. The thrust blocks and kickers are poured and I verified the correct materials used.
Curb - Compression Strength Partial 01/11/2021
PW-Misc
Informational
07/02/2018
John DiMauro 07/02/2018 8:44 AM KC Testing Lab is on site taking samples of the curb concrete for compression testing.
Driveway Inspection Passed 01/11/2021
PW-Misc
Informational
07/17/2018
John DiMauro 07/03/2018 2:06 PM The crews on site installed the north drive approach for the Arvest bank parking lot that connects to Cheddington Dr. There was sufficient compacted aggregate sub grade. I will return for further inspection after the concrete has cured.
PW-Misc
Informational
07/17/2018
John DiMauro 07/06/2018 2:03 PM The crew installed the approach for the church side northeast of the bank on Cheddington Dr. I verified the sub grade prior to the pour. I will do a follow up inspection next week.
PW-Misc
Informational
07/17/2018
John DiMauro 07/17/2018 10:15 AM The crew on site installed the furthest north commercial drive approach along SW Cheddington Dr. I verified the concrete type and that the white cure was applied. Will return for further inspection once the concrete is cured.
Pavement-Surface Partial 01/11/2021
PW-Misc
Informational
07/23/2018
John DiMauro 07/23/2018 11:03 AM Calvert Paving is on site installing the base lift for the Cheddington Dr. street.
PW-Misc
Informational
07/23/2018
John DiMauro 07/23/2018 11:04 AM Return trip to inspect the base lift for the street.
Street - Surface Course Partial 01/11/2021
PW-Misc
Informational
07/24/2018
John DiMauro 07/24/2018 9:47 AM The Calvert Paving crew is on site installing the surface lift for the Cheddington Rd. I verified the asphalt type and temperature. KC Testing Lab is on site testing the asphalt.
Sanitary Sewer Construction Inspection Passed 01/11/2021
PW-Main inspection
Informational
10/04/2018
Matt Munger 02/12/2018 9:30 AM Spoke with Daniel from KAT and he said they were going to start on the 8" sewer stub line (long run) today. They had just gotten on site and started warming up the equipment to start work.
PW-Main inspection
Informational
10/04/2018
Matt Munger 02/12/2018 3:05 PM I observed an adequate amount of gravel on top of the 8" stub line (long run) to the first clean out (prior to my arrival that line had been installed). The pipe that had been installed was the correct pipe and (SDR-26) the section of pipe that was not covered with gravel I observed an adequate amount of gravel below the pipe. The KAT crew was using a laser to get the pipe aligned properly.
PW-Main inspection
Informational
10/04/2018
Matt Munger 02/13/2018 10:25 AM When I was on site KAT crew had been working on the 8" sanitary stub line. I had not received a revised set of plans for the changes that they were doing. I spoke with TJ on site about it and spoke to Daniel from KAT and informed Daniel I was not comfortable signing off on that line without an approved set of plans. I spoke with Dawn (PM) about the situation and she informed me that Matt (Engineering Solutions) Schlick would be sending in the revised set of plans for approval today or tomorrow.
PW-Main inspection
Corrective Action Required
10/04/2018
Matt Munger 02/13/2018 1:45 PM Spoke with Daniel from KAT and explained to him the 8" sanitary sewer stub that was installed that I don't have revisions for I can't do a proper inspection on until I know exactly what the plans revised plans call for. I let Daniel know what they had installed was at their own risk. I had also talked to TJ on the phone about not being able to do a proper inspection as well without having the updated approved plans with the changes that were done.
PW-Main inspection
Corrective Action Required
10/04/2018
Matt Munger 02/16/2018 1:52 PM KAT was working on putting the sanitary sewer stub line that has not been approved and I have yet to receive the revised plans for. I spoke with Daniel and informed him that I cant do any inspections on the line until I have plans and that installing the line is at their own risk. Daniel stated that he was doing what he was told to do.
Water Line - Coliform Test 2 Passed 01/11/2021
Misc
Informational
06/05/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Misc
Informational
06/05/2019
John DiMauro 05/09/2019 3:52 PM We collected the day two samples for the 4” private domestic water line. I relinquished them to inspector Ron Paynter and he delivered them to Keystone Labs. We will know the results in 24 hours. The day 1 samples collected on 5/8/2019 passed.
Misc
Informational
06/05/2019
We collected the day two samples for the 4” private domestic water line and delivered them to Keystone Labs. We will know the results in 24 hours.
Sanitary Sewer - Air Test Passed 01/11/2021
Sanitary Sewer - Mandrel Passed 01/11/2021
Sanitary Sewer - Vacuum Passed 01/11/2021
Pavement-Surface Passed 01/11/2021
PW-Misc
Informational
01/11/2021
John DiMauro 07/23/2018 11:03 AM Calvert Paving is on site installing the base lift for the Cheddington Dr. street.
PW-Misc
Informational
01/11/2021
John DiMauro 07/23/2018 11:04 AM Return trip to inspect the base lift for the street.
Street - Surface Course Passed 01/11/2021
PW-Misc
Informational
01/11/2021
John DiMauro 07/24/2018 9:47 AM The Calvert Paving crew is on site installing the surface lift for the Cheddington Rd. I verified the asphalt type and temperature. KC Testing Lab is on site testing the asphalt.
Record Drawing Review Passed 2/19/2021 03/12/2021
Documents & Images
Date Uploaded File Type Document Name
12/01/2017 Signed Permits
12/18/2017 IMG_3201
12/18/2017 IMG_3203
12/19/2017 Letter DE-Daily Inspection Summary
12/19/2017 IMG_1454
12/19/2017 IMG_1455
12/19/2017 IMG_1456
12/19/2017 IMG_1457
12/19/2017 IMG_1458
12/19/2017 IMG_1461
12/19/2017 IMG_1462
12/19/2017 IMG_1463
12/19/2017 IMG_3201
12/19/2017 IMG_3203
12/20/2017 Letter DE-Daily Inspection Summary
12/20/2017 IMG_1464
12/20/2017 IMG_1465
12/20/2017 IMG_1466
12/20/2017 IMG_1467
12/20/2017 IMG_1468
12/21/2017 Letter DE-Site Visit Inspection
01/09/2018 Letter DE-Daily Inspection Summary
01/09/2018 Letter DE-Site Visit Inspection
01/12/2018 Letter DE-Site Visit Inspection
01/18/2018 Letter DE-Daily Inspection Summary
01/08/2018 Letter DE-Site Visit Inspection
01/04/2018 Letter DE-Site Visit Inspection
01/02/2018 Letter DE-Site Visit Inspection
12/29/2017 Letter DE-Site Visit Inspection
12/28/2017 Letter DE-Site Visit Inspection
12/22/2017 Letter DE-Daily Inspection Summary
12/20/2017 Letter DE-Daily Inspection Summary
12/19/2017 Letter DE-Daily Inspection Summary
01/31/2018 Letter DE-Daily Inspection Summary
02/01/2018 Letter DE-Daily Inspection Summary
12/18/2017 Letter DE-Daily Inspection Summary
12/18/2017 Letter DE-Daily Inspection Summary
02/02/2018 Letter DE-Daily Inspection Summary
12/18/2017 IMG_3206
12/18/2017 IMG_3205
12/15/2017 Letter DE-Daily Inspection Summary
12/13/2017 Letter DE-Site Visit Inspection
12/11/2017 Letter DE-Daily Inspection Summary - DEI-Storm - Material Verification
12/08/2017 Letter DE-Site Visit Inspection
12/06/2017 Letter DE-Site Visit Inspection
12/04/2017 Letter DE-Site Visit Inspection
11/21/2017 Receipt Receipt for transaction: 2017-007367
01/23/2018 Letter DE-Site Visit Inspection
01/22/2018 Letter DE-Daily Inspection Summary
01/17/2018 Letter DE-Site Visit Inspection
02/12/2018 Letter DE-Daily Inspection Summary
02/13/2018 Letter DE-Daily Inspection Summary
01/16/2018 Letter DE-Site Visit Inspection
01/11/2018 Letter DE-Site Visit Inspection
01/10/2018 Letter DE-Daily Inspection Summary
02/15/2018 Letter DE-Daily Inspection Summary
01/25/2018 Letter DE-Site Visit Inspection
01/25/2018 Residences-at-Echelon_Geogrid-approval_2018-01-23(s)
01/29/2018 Letter DE-Site Visit Inspection
01/30/2018 Letter DE-Daily Inspection Summary
02/23/2018 Letter DE-Site Visit Inspection
02/12/2018 Letter DE-Daily Inspection Summary
02/12/2018 Letter DE-Daily Inspection Summary
02/28/2018 Letter DE-Daily Inspection Summary
03/01/2018 Letter DE-Daily Inspection Summary
02/13/2018 Letter DE-Daily Inspection Summary
03/05/2018 Letter DE-Daily Inspection Summary
03/06/2018 Letter DE-Site Visit Inspection
02/14/2018 Letter DE-Daily Inspection Summary
03/08/2018 Letter DE-Site Visit Inspection
03/12/2018 Letter DE-Daily Inspection Summary
02/14/2018 Letter DE-Daily Inspection Summary
01/26/2018 Letter DE-Site Visit Inspection
01/30/2018 Letter DE-Daily Inspection Summary
01/31/2018 Letter DE-Daily Inspection Summary
02/01/2018 Letter DE-Daily Inspection Summary
02/02/2018 Letter DE-Daily Inspection Summary
02/05/2018 Letter DE-Site Visit Inspection
02/06/2018 Letter DE-Daily Inspection Summary
03/15/2018 Letter DE-Daily Inspection Summary
02/07/2018 Letter DE-Site Visit Inspection
03/20/2018 Letter DE-Daily Inspection Summary
02/07/2018 Letter DE-Daily Inspection Summary
02/08/2018 Letter DE-Daily Inspection Summary
02/08/2018 Letter DE-Daily Inspection Summary
03/26/2018 Letter DE-Site Visit Inspection
03/27/2018 Letter DE-Daily Inspection Summary
02/08/2018 Letter DE-Daily Inspection Summary
02/08/2018 Letter DE-Daily Inspection Summary
02/08/2018 Letter DE-Daily Inspection Summary
02/09/2018 Letter DE-Daily Inspection Summary
02/27/2018 Letter DE-Daily Inspection Summary
03/02/2018 Letter DE-Daily Inspection Summary
05/24/2018 Letter DE-Daily Inspection Summary
03/07/2018 Letter DE-Site Visit Inspection
03/12/2018 Letter DE-Daily Inspection Summary
03/12/2018 Letter DE-Daily Inspection Summary
06/08/2018 Letter DE-Daily Inspection Summary
02/15/2018 Letter DE-Daily Inspection Summary
02/16/2018 Letter DE-Daily Inspection Summary
02/16/2018 Letter DE-Daily Inspection Summary
03/13/2018 Letter DE-Daily Inspection Summary
06/22/2018 Letter DE-Daily Inspection Summary
02/21/2018 Letter DE-Daily Inspection Summary
02/26/2018 Letter DE-Daily Inspection Summary
03/14/2018 Letter DE-Daily Inspection Summary
06/04/2018 Letter DE-Daily Inspection Summary
06/08/2018 Letter DE-Daily Inspection Summary
06/20/2018 Letter DE-Daily Inspection Summary
07/11/2018 Letter DE-Daily Inspection Summary
03/13/2018 Letter DE-Daily Inspection Summary
03/13/2018 Letter DE-Daily Inspection Summary
07/23/2018 Letter DE-Daily Inspection Summary
03/14/2018 Letter DE-Daily Inspection Summary
10/04/2018 Letter DE-Daily Inspection Summary
03/14/2018 Letter DE-Daily Inspection Summary
03/16/2018 Letter DE-Site Visit Inspection
04/17/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
03/21/2018 Letter DE-Site Visit Inspection
03/22/2018 Letter DE-Daily Inspection Summary
03/23/2018 Letter DE-Daily Inspection Summary
03/28/2018 Letter DE-Daily Inspection Summary
06/04/2019 Letter DE-Daily Inspection Summary
06/05/2019 Letter INSPECTION SUMMARY
03/30/2018 Letter DE-Daily Inspection Summary
04/03/2018 Letter DE-Site Visit Inspection
04/19/2018 Letter DE-Daily Inspection Summary
04/24/2018 Letter DE-Daily Inspection Summary
05/22/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Daily Inspection Summary
07/06/2018 Letter DE-Daily Inspection Summary
07/10/2018 Letter DE-Daily Inspection Summary
06/12/2018 Letter DE-Daily Inspection Summary
06/13/2018 Letter DE-Daily Inspection Summary
06/21/2018 Letter DE-Daily Inspection Summary
01/11/2021 Residences at Echelon Substantial Completion for Public Sanitary, Street and Storm
01/11/2021 Residences at Echelon Punch List for Public Sanitary, Street and Storm
06/26/2018 Letter DE-Daily Inspection Summary
07/02/2018 Letter DE-Daily Inspection Summary
07/02/2018 Letter DE-Daily Inspection Summary
07/17/2018 Letter DE-Daily Inspection Summary
07/24/2018 Letter DE-Daily Inspection Summary
07/03/2018 Letter DE-Daily Inspection Summary
07/17/2018 Letter DE-Daily Inspection Summary
10/18/2018 Letter DE-Daily Inspection Summary
04/17/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
06/21/2019 Letter DE-Daily Inspection Summary
06/21/2019 WO#1F90128 - City of Lees Summit
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter DE-Daily Inspection Summary
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter DE-Punch List
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
02/16/2021 STREET AND STORM ASBUILTS
02/16/2021 SANITARY ASBUILTS
03/12/2021 Letter INSPECTION SUMMARY
07/13/2021 MAINT. BOND - CHEDDINGTON STREET/STORM/SANITARY
09/07/2021 Affidavit - rev 07-2015 (GRPG)
06/21/2019 WO#1F90249 - City of Lees Summit
07/25/2019 Letter INSPECTION SUMMARY
07/31/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
08/12/2019 Signed Cert of Substantial Off Site Water Residences at Echelon
08/12/2019 signed punch list Off Site Water Residences at Echelon
08/26/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
01/27/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
05/01/2019 Letter DE-Daily Inspection Summary
05/08/2019 Letter DE-Daily Inspection Summary
05/09/2019 Letter DE-Daily Inspection Summary
01/27/2021 Letter INSPECTION SUMMARY
07/17/2019 Letter INSPECTION SUMMARY
07/17/2019 Letter INSPECTION SUMMARY
09/08/2021 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home