Summary


PRPWFC20172147
Public Works Infrastructure Permit - Commercial
Expired
PKS REALTY LLC
DEVELOPMENT COMPLETE
Site develoment for building addition. Work includes private stormwater improvements only.
06/27/2017
12/29/2017
Locations
Contacts
IRONWOOD CONSTRUCTION CO LLC, Address:31588 W 271ST ST, Phone:(913) 557-9090  
PKS REALTY LLC, Address:236 N 7TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/27/2017 06/27/2017
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $231.18 $231.18 Paid 06/27/2017
$231.19
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 7/24/2017 07/24/2017
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
Erosion Control Inspection Partial 7/25/2017 07/25/2017
PW-Misc
Informational
07/25/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
Site Visit Partial 7/25/2017 07/25/2017
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
07/25/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
Erosion Control Inspection Partial 7/27/2017 07/27/2017
PW-Misc
Informational
07/25/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
Site Visit Partial 7/27/2017 07/27/2017
PW-Misc
Informational
07/25/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
07/25/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
Site Visit Partial 7/28/2017 07/28/2017
PW-Misc
Informational
07/27/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
07/27/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
07/28/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
Site Visit Partial 7/31/2017 07/31/2017
PW-Misc
Informational
07/28/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
07/28/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
07/28/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
07/28/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
Site Visit Partial 8/1/2017 08/01/2017
PW-Misc
Informational
07/31/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
07/31/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
07/31/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/01/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
Site Visit Partial 8/2/2017 08/02/2017
PW-Misc
Informational
08/01/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/01/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/01/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/01/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
Storm - Pipe Partial 8/2/2017 08/02/2017
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:58 PM The crew on site installed approximately 80'ft of the storm pipe. The trench appears to have at least 6"in of rock for bedding and the trench is backfilled with rock and chalked halfway up the sides of the pipe.
Storm - Pipe Partial 8/3/2017 08/03/2017
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:58 PM The crew on site installed approximately 80'ft of the storm pipe. The trench appears to have at least 6"in of rock for bedding and the trench is backfilled with rock and chalked halfway up the sides of the pipe.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:02 PM Crews are on site installing the remainder of the storm pipe and drainage area.
Site Visit Partial 8/3/2017 08/03/2017
PW-Misc
Informational
08/02/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/02/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/02/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/02/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
Site Visit Partial 8/4/2017 08/07/2017
PW-Misc
Informational
08/03/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/03/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/03/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/03/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/03/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/03/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/03/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
Erosion Control Inspection Partial 8/4/2017 08/07/2017
PW-Misc
Informational
07/27/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
Site Visit Partial 8/8/2017 08/08/2017
PW-Misc
Informational
08/07/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/07/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/07/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/07/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/07/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/07/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
Erosion Control Inspection Partial 8/8/2017 08/08/2017
PW-Misc
Informational
08/07/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
08/07/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
Site Visit Partial 8/9/2017 08/09/2017
PW-Misc
Informational
08/08/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/08/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/08/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/08/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/08/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
Erosion Control Inspection Failed 8/22/2017 at 10:20 AM 08/22/2017
PW-Misc
Informational
08/08/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
08/08/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/08/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
08/22/2017
John DiMauro 08/22/2017 10:28 AM There are problems with the erosion control devices on your site. There is a section of the sediment fence that has failed due to the rain event. This fence needs to be fixed and corrected.
Site Visit Partial 8/22/2017 08/22/2017
PW-Misc
Informational
08/09/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/09/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/09/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/09/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/09/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/09/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
08/09/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/22/2017 10:30 AM No activity.
Erosion Control Inspection Partial 8/28/2017 at 10:00 AM 08/28/2017
PW-Misc
Informational
08/22/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
08/22/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/22/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/22/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
08/22/2017
John DiMauro 08/22/2017 10:28 AM There are problems with the erosion control devices on your site. There is a section of the sediment fence that has failed due to the rain event. This fence needs to be fixed and corrected.
PW-Misc
Resolved
08/28/2017
John DiMauro 08/28/2017 10:25 AM The sediment fence has been corrected and is intact.
Site Visit Partial 8/28/2017 08/28/2017
PW-Misc
Informational
08/22/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/22/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/22/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/22/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/22/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/22/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
08/22/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
08/28/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Site Visit Partial 9/5/2017 at 11:30 AM 09/06/2017
PW-Misc
Informational
08/28/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
08/28/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
08/28/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
08/28/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
08/28/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
08/28/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Erosion Control Inspection Partial 9/11/2017 at 1:45 PM 09/11/2017
PW-Misc
Informational
08/28/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
08/28/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/28/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
08/28/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
08/28/2017
John DiMauro 08/22/2017 10:28 AM There are problems with the erosion control devices on your site. There is a section of the sediment fence that has failed due to the rain event. This fence needs to be fixed and corrected.
PW-Misc
Informational
09/11/2017
John DiMauro 09/11/2017 3:46 PM Erosion control devices are intact.
Site Visit Partial 9/18/2017 at 11:25 AM 09/18/2017
PW-Misc
Informational
09/06/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
09/06/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
09/06/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
09/06/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
09/06/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
09/06/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
09/06/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
09/06/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Erosion Control Inspection Partial 9/18/2017 at 11:20 AM 09/18/2017
PW-Misc
Informational
09/11/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
09/11/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
09/11/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
09/11/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
09/11/2017
John DiMauro 08/22/2017 10:28 AM There are problems with the erosion control devices on your site. There is a section of the sediment fence that has failed due to the rain event. This fence needs to be fixed and corrected.
PW-Misc
Informational
09/11/2017
John DiMauro 09/11/2017 3:46 PM Erosion control devices are intact.
PW-Misc
Informational
09/18/2017
John DiMauro 09/18/2017 3:41 PM Erosion control devices are intact.
Storm - Pipe Passed 10/3/2017 at 2:45 PM 10/03/2017
PW-Misc
Informational
08/03/2017
John DiMauro 08/02/2017 2:58 PM The crew on site installed approximately 80'ft of the storm pipe. The trench appears to have at least 6"in of rock for bedding and the trench is backfilled with rock and chalked halfway up the sides of the pipe.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:02 PM Crews are on site installing the remainder of the storm pipe and drainage area.
PW-Misc
Informational
10/03/2017
John DiMauro 10/03/2017 2:54 PM The storm pipe has been installed according to the plans and all the roof drain connections have been made.
Erosion Control Inspection Passed 10/3/2017 10/03/2017
PW-Misc
Informational
09/18/2017
John DiMauro 07/25/2017 11:31 AM The silt fence is installed and intact according to the plans.
PW-Misc
Informational
09/18/2017
John DiMauro 07/27/2017 3:42 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
09/18/2017
John DiMauro 08/07/2017 3:36 PM The sediment fence is intact. No debris washing out.
PW-Misc
Informational
09/18/2017
John DiMauro 08/08/2017 3:24 PM The sediment fence is intact. No debris washing out.
PW-Devices for Erosion and Sediment Control
Corrective Action Required
09/18/2017
John DiMauro 08/22/2017 10:28 AM There are problems with the erosion control devices on your site. There is a section of the sediment fence that has failed due to the rain event. This fence needs to be fixed and corrected.
PW-Misc
Informational
09/18/2017
John DiMauro 09/11/2017 3:46 PM Erosion control devices are intact.
PW-Misc
Informational
09/18/2017
John DiMauro 09/18/2017 3:41 PM Erosion control devices are intact.
ESC - (Vegetation/Ground Cover) Passed 10/3/2017 10/03/2017
PW-Misc
Informational
10/03/2017
John DiMauro 10/03/2017 2:56 PM Sod has been installed on all areas of disturbed ground.
Site Visit Partial 10/16/2017 at 9:40 AM 10/16/2017
PW-Misc
Informational
09/18/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
09/18/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
09/18/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
09/18/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
09/18/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
09/18/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
09/18/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
09/18/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Storm - Inlets Clean Passed 10/16/2017
Storm - Outlet Structure Passed 10/16/2017 10/16/2017
Storm - Rip Rap Passed 10/16/2017 10/16/2017
Site Visit Partial 10/16/2017 at 1:25 PM 10/16/2017
PW-Misc
Informational
10/16/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
10/16/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
10/16/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
10/16/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
10/16/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
10/16/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
10/16/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Site Visit Complete 12/29/2017
PW-Misc
Informational
10/16/2017
John DiMauro 07/24/2017 3:36 PM No activity today.
PW-Misc
Informational
10/16/2017
John DiMauro 07/25/2017 11:32 AM Crew on site starting the demo of the existing concrete areas to be reconstructed.
PW-Misc
Informational
10/16/2017
John DiMauro 07/27/2017 3:44 PM Trench and grading construction.
PW-Misc
Informational
10/16/2017
John DiMauro 07/28/2017 10:23 AM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 07/31/2017 3:40 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/01/2017 2:04 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/02/2017 2:53 PM Crews are on site installing the storm pipe.
PW-Misc
Informational
10/16/2017
John DiMauro 08/03/2017 3:03 PM Crews working on storm pipe.
PW-Misc
Informational
10/16/2017
John DiMauro 08/07/2017 3:35 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/08/2017 3:23 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/09/2017 3:45 PM Crews on site working on the building construction.
PW-Misc
Informational
10/16/2017
John DiMauro 08/22/2017 10:30 AM No activity.
PW-Misc
Informational
10/16/2017
John DiMauro 08/28/2017 10:26 AM No activity.
Documents & Images
Date Uploaded File Type Document Name
06/27/2017 Receipt Receipt for transaction: 2017-004346
07/18/2017 Letter PW-Permit
07/20/2017 B&J Foods Signed Permit
07/24/2017 Letter PW-Daily Inspection Summary
07/25/2017 Letter PW-Daily Inspection Summary
07/27/2017 Letter PW-Daily Inspection Summary
07/28/2017 Letter PW-Daily Inspection Summary
07/31/2017 Letter PW-Daily Inspection Summary
08/01/2017 Letter PW-Daily Inspection Summary
08/02/2017 Letter PW-Daily Inspection Summary
08/02/2017 Letter PW-Daily Inspection Summary
08/03/2017 Letter PW-Daily Inspection Summary
08/07/2017 Letter PW-Daily Inspection Summary
08/08/2017 Letter PW-Daily Inspection Summary
08/09/2017 Letter PW-Daily Inspection Summary
08/22/2017 Letter PW-Daily Inspection Summary
08/28/2017 Letter PW-Daily Inspection Summary
09/11/2017 Letter DE-Daily Inspection Summary
09/18/2017 Letter DE-Daily Inspection Summary
10/03/2017 Letter DE-Daily Inspection Summary
10/16/2017 Letter DE-Certificate of Substantial Completion Multiple Lot
10/16/2017 Letter DE-Punch List
10/16/2017 B&J Foods Signed Sub Cert.
10/16/2017 B&J Foods Signed Punch List.
10/16/2017 Letter DE-Daily Inspection Summary
12/29/2017 Letter DE-Certificate of Final Acceptance (Commercial)
12/29/2017 B&J Foods Signed Certificate of Final
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home