Summary


PRPWFC20172113
Public Works Infrastructure Permit - Commercial
Final Acceptance
M-III LONGVIEW LLC
DEVELOPMENT COMPLETE
B&B Theater (See FDP #PL2017022)
06/23/2017
08/07/2018
03/06/2018
Locations
Contacts
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
BOX REAL ESTATE DEVELOPMENT, Address:440 SW LONGVIEW BLVD, Phone:(913) 735-9861  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/23/2017 07/17/2017
John DiMauro
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $288.60 $288.60 Paid 07/06/2017
91100C9-Water Insp Fee $990.81 $990.81 Paid 07/06/2017
9110072-Water Test Fee $200.00 $200.00 Paid 07/06/2017
9110068-Storm Fee $2,997.24 $2,997.24 Paid 07/06/2017
9110081-Paved Surface Inspection Fee $12,892.33 $12,892.33 Paid 07/06/2017
9110071-Site Grading Fee $532.20 $532.20 Paid 07/06/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 7/17/2017 07/17/2017
PW-Misc
Informational
07/17/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
Erosion Control Inspection Partial 7/20/2017 at 12:45 PM 07/20/2017
PW-Misc
Informational
07/20/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
Site Visit Partial 7/20/2017 07/20/2017
PW-Misc
Informational
07/17/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/20/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
Site Visit Partial 7/24/2017 07/24/2017
PW-Misc
Informational
07/20/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/20/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
Erosion Control Inspection Partial 7/24/2017 07/24/2017
PW-Misc
Informational
07/20/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
Site Visit Partial 7/26/2017 07/26/2017
PW-Misc
Informational
07/24/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/24/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/26/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
Erosion Control Inspection Failed 7/27/2017 07/27/2017
PW-Misc
Informational
07/24/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
07/24/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
07/27/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
Site Visit Partial 7/27/2017 07/27/2017
PW-Misc
Informational
07/26/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/26/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/26/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/26/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 2:49 PM No activity.
Site Visit Partial 7/28/2017 07/28/2017
PW-Misc
Informational
07/27/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/27/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/27/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/27/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/27/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
07/28/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
Erosion Control Inspection Partial 7/28/2017 07/28/2017
PW-Misc
Informational
07/27/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
07/27/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
07/27/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
07/28/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
Erosion Control Inspection Partial 7/31/2017 07/31/2017
PW-Misc
Informational
07/28/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
07/28/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
07/28/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
07/28/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
Site Visit Partial 7/31/2017 07/31/2017
PW-Misc
Informational
07/28/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/28/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/28/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/28/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/28/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
07/28/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
Site Visit Partial 8/1/2017 08/01/2017
PW-Misc
Informational
07/31/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
07/31/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
07/31/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
Erosion Control Inspection Failed 8/1/2017 08/02/2017
PW-Misc
Informational
07/31/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
07/31/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
07/31/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
07/31/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
07/31/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
PW-Misc
Corrective Action Required
08/02/2017
John DiMauro 08/02/2017 2:46 PM The sediment fence on the north west corner of the property needs to be repaired. The contractor on site has a crew coming out tomorrow morning to make the repairs to the fence.
Site Visit Partial 8/2/2017 08/02/2017
PW-Misc
Informational
08/01/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/01/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/01/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/01/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
Erosion Control Inspection Partial 8/3/2017 08/03/2017
PW-Misc
Informational
08/02/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
08/02/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
08/02/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
08/02/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
08/02/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
PW-Misc
Corrective Action Required
08/02/2017
John DiMauro 08/02/2017 2:46 PM The sediment fence on the north west corner of the property needs to be repaired. The contractor on site has a crew coming out tomorrow morning to make the repairs to the fence.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:07 PM The proper repairs have been made to the sediment fence at this time.
Erosion Control Inspection Partial 8/7/2017 08/07/2017
PW-Misc
Informational
08/03/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
08/03/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
08/03/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
08/03/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
08/03/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
PW-Misc
Resolved
08/03/2017
John DiMauro 08/02/2017 2:46 PM The sediment fence on the north west corner of the property needs to be repaired. The contractor on site has a crew coming out tomorrow morning to make the repairs to the fence.
PW-Misc
Informational
08/03/2017
John DiMauro 08/03/2017 3:07 PM The proper repairs have been made to the sediment fence at this time.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:38 PM The sediment fence appears to be intact and withheld during the heavy rain event over the weekend.
Site Visit Partial 8/7/2017 08/07/2017
PW-Misc
Informational
08/02/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/02/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/02/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/02/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/02/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
Erosion Control Inspection Partial 8/8/2017 08/08/2017
PW-Misc
Informational
08/07/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
08/07/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
08/07/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
08/07/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
08/07/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
PW-Misc
Informational
08/07/2017
John DiMauro 08/03/2017 3:07 PM The proper repairs have been made to the sediment fence at this time.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:38 PM The sediment fence appears to be intact and withheld during the heavy rain event over the weekend.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:30 PM The sediment fence is intact. Repairs were made to the fence after the heavy rain event over the weekend.
Site Visit Partial 8/8/2017 08/08/2017
PW-Misc
Informational
08/07/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/07/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/07/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/07/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/07/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/07/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
Site Visit Partial 8/17/2017 at 11:45 AM 08/17/2017
PW-Misc
Informational
08/08/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/08/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/08/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/08/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/08/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
08/17/2017
The contractors are forming the pad.
Site Visit Partial 8/21/2017 at 1:30 PM 08/21/2017
PW-Misc
Informational
08/17/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/17/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/17/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/17/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/17/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/17/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
08/17/2017
The contractors are forming the pad.
PW-Misc
Informational
08/21/2017
It started raining this morning, it appears to have rained out the work for today.
Erosion Control Inspection Residential Failed 8/22/2017 at 10:00 AM 08/22/2017
Informational
08/22/2017
On the corner of fasination and kessler the silt fence came down after all the rain last night. I told them they need to fix the silt fence.
Erosion Control Inspection Passed 8/23/2017 at 9:00 AM 08/23/2017
PW-Misc
Informational
08/08/2017
John DiMauro 07/20/2017 3:34 PM Erosion control devices are installed and intact.
PW-Misc
Informational
08/08/2017
John DiMauro 07/24/2017 3:49 PM The north east section of the properties sediment fence failed due to the heavy rain event over the weekend. The onsite contractor said he would get the fence fixed and correct any other issues regarding the ESC devices.
PW-Misc
Corrective Action Required
08/08/2017
John DiMauro 07/27/2017 2:47 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Corrective Action Required
08/08/2017
John DiMauro 07/28/2017 3:29 PM The north east section of the properties sediment fence failed due to the heavy rain event last night. The fence needs to be fixed.
PW-Misc
Informational
08/08/2017
John DiMauro 07/31/2017 3:29 PM The contractor fixed the section of the sediment fence that failed.
PW-Misc
Informational
08/08/2017
John DiMauro 08/03/2017 3:07 PM The proper repairs have been made to the sediment fence at this time.
PW-Misc
Informational
08/08/2017
John DiMauro 08/07/2017 3:38 PM The sediment fence appears to be intact and withheld during the heavy rain event over the weekend.
PW-Misc
Informational
08/08/2017
John DiMauro 08/08/2017 3:30 PM The sediment fence is intact. Repairs were made to the fence after the heavy rain event over the weekend.
PW-Erosion and Sediment Control
Informational
08/23/2017
Your project is in violation of the Erosion and Sediment control policy. The silt fence on facination and kessler came down after the 5" rain. The contractor put the silt fence back up.
Erosion Control Inspection Residential Passed 8/24/2017 at 9:00 AM 08/23/2017
Site Visit Partial 8/28/2017 at 1:00 PM 08/28/2017
PW-Misc
Informational
08/21/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/21/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/21/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/21/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/21/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/21/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
08/21/2017
The contractors are forming the pad.
PW-Misc
Informational
08/21/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
08/28/2017
The contractors are working on getting the pad poured
Site Visit Partial 8/31/2017 at 10:30 AM 08/31/2017
PW-Misc
Informational
08/28/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/28/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/28/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/28/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/28/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/28/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
08/28/2017
The contractors are forming the pad.
PW-Misc
Informational
08/28/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
08/28/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
08/31/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
Site Visit Partial 9/1/2017 at 3:00 PM 09/01/2017
PW-Misc
Informational
08/31/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
08/31/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
08/31/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
08/31/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
08/31/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
08/31/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
08/31/2017
The contractors are forming the pad.
PW-Misc
Informational
08/31/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
08/31/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
08/31/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
PW-Misc
Informational
09/01/2017
They are still working on the pad, no work on the infrastructure.
Site Visit Partial 9/5/2017 at 10:45 AM 09/05/2017
PW-Misc
Informational
09/01/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
09/01/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
09/01/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
09/01/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
09/01/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
09/01/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
09/01/2017
The contractors are forming the pad.
PW-Misc
Informational
09/01/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
09/01/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
09/01/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
PW-Misc
Informational
09/01/2017
They are still working on the pad, no work on the infrastructure.
PW-Misc
Informational
09/05/2017
They are still working on the pad site.
Site Visit Partial 9/7/2017 at 8:15 AM 09/11/2017
PW-Misc
Informational
09/05/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
09/05/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
09/05/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
09/05/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
09/05/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
09/05/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
09/05/2017
The contractors are forming the pad.
PW-Misc
Informational
09/05/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
09/05/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
09/05/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
PW-Misc
Informational
09/05/2017
They are still working on the pad, no work on the infrastructure.
PW-Misc
Informational
09/05/2017
They are still working on the pad site.
PW-Misc
Informational
09/11/2017
I delivered the updated version of the sanitary plans to the contractor. They will be doing the bore for the sanitary lin e on wednesday.
Site Visit Partial 9/13/2017 at 10:30 AM 09/13/2017
PW-Misc
Informational
09/11/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
09/11/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
09/11/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
09/11/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
09/11/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
09/11/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
09/11/2017
The contractors are forming the pad.
PW-Misc
Informational
09/11/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
09/11/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
09/11/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
PW-Misc
Informational
09/11/2017
They are still working on the pad, no work on the infrastructure.
PW-Misc
Informational
09/11/2017
They are still working on the pad site.
PW-Misc
Informational
09/11/2017
I delivered the updated version of the sanitary plans to the contractor. They will be doing the bore for the sanitary lin e on wednesday.
PW-Misc
Informational
09/13/2017
The contractor is on-site digging the pit for the bore to tie in the sanitary line. I told him I will bring him a spec for the qualifications for doing a bore.
Sanitary Sewer Construction Inspection Partial 9/14/2017 at 9:00 AM 09/14/2017
PW-Main inspection
Informational
09/14/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
Sanitary Sewer Construction Inspection Partial 9/18/2017 at 9:00 AM 09/18/2017
PW-Main inspection
Informational
09/14/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/18/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
Sanitary Sewer Construction Inspection Partial 9/18/2017 at 1:30 PM 09/18/2017
PW-Main inspection
Informational
09/18/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/18/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
09/18/2017
The crew stopped working this morning due to the rain.
Sanitary Sewer Construction Inspection Partial 9/19/2017 at 10:30 AM 09/19/2017
PW-Main inspection
Informational
09/18/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/18/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
09/18/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
09/19/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
Sanitary Sewer Construction Inspection Partial 9/20/2017 at 9:00 AM 09/20/2017
PW-Main inspection
Informational
09/19/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/19/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
09/19/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
09/19/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
09/20/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
Sanitary Sewer Construction Inspection Partial 9/25/2017 at 9:30 AM 09/25/2017
PW-Main inspection
Informational
09/20/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/20/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
09/20/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
09/20/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
09/20/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
09/25/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
Storm Sewer Construction Inspection Partial 9/25/2017 at 3:00 PM 09/25/2017
PW-Storm Sewer Inspection
Informational
09/25/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
Fire Line Construction Inspection Partial 9/26/2017 at 11:30 AM 09/26/2017
Informational
09/26/2017
This morning Winwater did a water tap on the 8" main for the 6" fire line. Gene Williams approved this water tap. The contractor did a pressure test. . The bore was done last week with the 6" fire line going under the road. This afternoon they will connect the pipe to the valve that was installed next to the tap. The gate valve has been installed next to the tap with c900 pipe.I also spoke with the water dept. this morning and they agreed they can do a 2" tap off the fire line and the contractor will install copper up to the meter.Steve Robbins 09/26/2017 12:34 PM
Fire Line Construction Inspection Partial 9/26/2017 at 2:30 PM 09/26/2017
Informational
09/26/2017
The gate valve has been installed and the c 900 pipe has been installed for the fire line and all the fittings. The contractor will pour a thrust block in the morning.Steve Robbins 09/26/2017 3:55 PM
Fire Line Construction Inspection Partial 9/27/2017 at 7:45 AM 09/27/2017
Informational
09/27/2017
This morning I asked the contractors to make sure we have epoxy coated fitting for the fire line. This afternoon they will pour the thrust block on the 8" main from the fireline.Steve Robbins 09/27/2017 8:24 AM
Fire Line Construction Inspection Partial 9/27/2017 at 2:15 PM 09/27/2017
Informational
09/27/2017
The concrete is late, they will pour the thrust blocks later and not backfill so i can look at it in the morning.Steve Robbins 09/27/2017 3:32 PM
Fire Line Construction Inspection Partial 9/28/2017 at 8:00 AM 09/28/2017
Informational
09/28/2017
The thrust block for the fireline where the tap was done has been poured and , the valve has been wrapped and rock has been installed. The contractor is going to backfill and get things set up for the water tap for the 2" meter.Steve Robbins 09/28/2017 8:32 AM
Fire Line Construction Inspection Partial 9/29/2017 at 9:00 AM 09/29/2017
Informational
09/29/2017
The water dept. came out and did the 2" tap on the fireline. They also brought the setter and meter. They will work on installing that this morning.Steve Robbins 09/29/2017 9:43 AM
Storm Sewer Construction Inspection Partial 10/2/2017 at 8:30 AM 10/02/2017
PW-Storm Sewer Inspection
Informational
09/25/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/02/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
Fire Line Construction Inspection Partial 10/2/2017 at 12:30 PM 10/02/2017
Informational
10/02/2017
The water dept. has done the tap off the fireline , the meter and pit has been installed. They put 2 " copper from the fire line to the meter. They will be installing copper from the meter 10FT .Steve Robbins 10/02/2017 12:52 PM
Storm Sewer Construction Inspection Partial 10/3/2017 at 9:30 AM 10/03/2017
PW-Storm Sewer Inspection
Informational
10/02/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/02/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/03/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
Sanitary Sewer Construction Inspection Partial 10/4/2017 at 8:45 AM 10/04/2017
PW-Main inspection
Informational
09/25/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
09/25/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
09/25/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
09/25/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
09/25/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
09/25/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/04/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
Site Visit Complete 10/4/2017 10/04/2017
PW-Misc
Informational
09/13/2017
John DiMauro 07/17/2017 1:48 PM I met with and delivered plans to Harold Cooper with Prosser Wilbert Construction Inc. We went over the plans and he signed the permits.
PW-Misc
Informational
09/13/2017
John DiMauro 07/20/2017 3:35 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 07/24/2017 3:49 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 07/26/2017 3:41 PM Crews are on site working on the grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 07/27/2017 2:49 PM No activity.
PW-Misc
Informational
09/13/2017
John DiMauro 07/28/2017 3:27 PM Crews on site working on grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 07/31/2017 3:30 PM Crews on site working on grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 08/01/2017 2:07 PM I spent 1.5 hours on site this morning with Tom Chandler going over erosion control measures. Meeting with Kara Taylor this afternoon to go over more ESC measure options.
PW-Misc
Informational
09/13/2017
John DiMauro 08/02/2017 2:49 PM I met with the general contractor Harold Cooper on site to go over the ESC issues.
PW-Misc
Informational
09/13/2017
John DiMauro 08/07/2017 3:41 PM Crews on site working on grading construction.
PW-Misc
Informational
09/13/2017
John DiMauro 08/08/2017 3:32 PM Met with Harold Cooper and Steve Robbins on site to go over the plans and get Steve ready to take over the project.
PW-Misc
Informational
09/13/2017
The contractors are forming the pad.
PW-Misc
Informational
09/13/2017
It started raining this morning, it appears to have rained out the work for today.
PW-Misc
Informational
09/13/2017
The contractors are working on getting the pad poured
PW-Misc
Informational
09/13/2017
I talked with Gene and they have a change in their sanitary sewer plans, I will be getting the new one soon.
PW-Misc
Informational
09/13/2017
They are still working on the pad, no work on the infrastructure.
PW-Misc
Informational
09/13/2017
They are still working on the pad site.
PW-Misc
Informational
09/13/2017
I delivered the updated version of the sanitary plans to the contractor. They will be doing the bore for the sanitary lin e on wednesday.
PW-Misc
Informational
09/13/2017
The contractor is on-site digging the pit for the bore to tie in the sanitary line. I told him I will bring him a spec for the qualifications for doing a bore.
Sanitary Sewer Construction Inspection Partial 10/5/2017 at 8:45 AM 10/05/2017
PW-Main inspection
Informational
10/04/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/04/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/04/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/04/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/04/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/04/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/04/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/05/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
Sanitary Sewer Construction Inspection Partial 10/5/2017 at 11:00 AM 10/05/2017
PW-Main inspection
Informational
10/05/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/05/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/05/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/05/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/05/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/05/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/05/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/05/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/05/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
Sanitary Sewer Construction Inspection Partial 10/6/2017 at 11:00 AM 10/06/2017
PW-Main inspection
Informational
10/05/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/05/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/05/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/05/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/05/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/05/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/05/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/05/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/05/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/06/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
Sanitary Sewer Construction Inspection Partial 10/9/2017 at 9:00 AM 10/09/2017
PW-Main inspection
Informational
10/06/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/06/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/06/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/06/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/06/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/06/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/06/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/06/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/06/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/06/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/09/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
Storm Sewer Construction Inspection Partial 10/10/2017 at 10:30 AM 10/10/2017
PW-Storm Sewer Inspection
Informational
10/03/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/03/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/03/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
Storm Sewer Construction Inspection Partial 10/10/2017 at 2:15 PM 10/10/2017
PW-Storm Sewer Inspection
Informational
10/10/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/10/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
Storm Sewer Construction Inspection Partial 10/11/2017 at 10:30 AM 10/11/2017
PW-Storm Sewer Inspection
Informational
10/10/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/10/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/10/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
Storm Sewer Construction Inspection Partial 10/11/2017 at 2:00 PM 10/11/2017
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/11/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
Storm Sewer Construction Inspection Partial 10/12/2017 at 12:30 PM 10/12/2017
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/11/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
10/11/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
10/11/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
Storm Sewer Construction Inspection Partial 10/12/2017 at 2:00 PM 10/12/2017
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/12/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
Sanitary Sewer Construction Inspection Partial 10/13/2017 at 9:30 AM 10/13/2017
PW-Main inspection
Informational
10/09/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/09/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/09/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/09/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/09/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/09/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/09/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/09/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/09/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/09/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/09/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/13/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
Sanitary Sewer Construction Inspection Partial 10/13/2017 at 2:15 PM 10/13/2017
PW-Main inspection
Informational
10/13/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/13/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/13/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/13/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/13/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/13/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/13/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/13/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/13/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/13/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/13/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/13/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/13/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
Sanitary Sewer Construction Inspection Partial 10/16/2017 at 8:30 AM 10/16/2017
PW-Main inspection
Informational
10/13/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/13/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/13/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/13/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/13/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/13/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/13/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/13/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/13/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/13/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/13/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/13/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/13/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/16/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
Sanitary Sewer Construction Inspection Partial 10/16/2017 at 3:00 PM 10/16/2017
PW-Main inspection
Informational
10/16/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/16/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/16/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/16/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/16/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/16/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/16/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/16/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/16/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/16/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/16/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/16/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/16/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/16/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/16/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
Sanitary Sewer Construction Inspection Partial 10/17/2017 at 9:00 AM 10/17/2017
PW-Main inspection
Informational
10/16/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/16/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/16/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/16/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/16/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/16/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/16/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/16/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/16/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/16/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/16/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/16/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/16/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/16/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/16/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/17/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
Sanitary Sewer Construction Inspection Partial 10/17/2017 at 12:15 PM 10/17/2017
PW-Main inspection
Informational
10/17/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/17/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/17/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/17/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/17/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/17/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/17/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/17/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/17/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/17/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/17/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/17/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/17/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/17/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/17/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/17/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/17/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/17/2017 at 3:00 PM 10/17/2017
PW-Misc
Informational
10/17/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/18/2017 at 12:00 PM 10/18/2017
PW-Misc
Informational
10/17/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/18/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
Sanitary Sewer Construction Inspection Partial 10/19/2017 at 10:15 AM 10/19/2017
PW-Main inspection
Informational
10/17/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/17/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/17/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/17/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/17/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/17/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/17/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/17/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/17/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/17/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/17/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/17/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/17/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/17/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/17/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/17/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/17/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/19/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/19/2017 at 2:15 PM 10/19/2017
PW-Misc
Informational
10/18/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/18/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/19/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/23/2017 at 8:30 AM 10/23/2017
PW-Misc
Informational
10/19/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/19/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/19/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/23/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/23/2017 at 10:30 AM 10/23/2017
PW-Misc
Informational
10/23/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/23/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/23/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/23/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/23/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
Sanitary Sewer Construction Inspection Partial 10/24/2017 at 9:15 AM 10/24/2017
PW-Main inspection
Informational
10/19/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/19/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/19/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/19/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/19/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/19/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/19/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/19/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/19/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/19/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/19/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/19/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/19/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/19/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/19/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/19/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/19/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/19/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
PW-Main inspection
Informational
10/24/2017
The contractors are almost to MH 1-3, the 3 wyes have been installed and are completed.Steve Robbins 10/24/2017 9:56 AM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/25/2017 at 1:15 PM 10/25/2017
PW-Misc
Informational
10/23/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/23/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/23/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/23/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/23/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/25/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
Sanitary Sewer Construction Inspection Partial 10/26/2017 at 11:15 AM 10/26/2017
PW-Main inspection
Informational
10/24/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/24/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/24/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/24/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/24/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/24/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/24/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/24/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/24/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/24/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/24/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/24/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/24/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/24/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/24/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/24/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/24/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/24/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
PW-Main inspection
Informational
10/24/2017
The contractors are almost to MH 1-3, the 3 wyes have been installed and are completed.Steve Robbins 10/24/2017 9:56 AM
PW-Main inspection
Informational
10/26/2017
The contractors have installed MH 1-3, they are still hitting rock, they plan on installing the wye for the 4th service line later today.Steve Robbins 10/26/2017 12:02 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/26/2017 at 1:30 PM 10/26/2017
PW-Misc
Informational
10/25/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/25/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/25/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/25/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/25/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/25/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
PW-Misc
Informational
10/26/2017
The last wye for the service line going to the building has been completed, they have installed tracer wire and anode, they just need to do the trench check.Steve Robbins 10/26/2017 3:50 PM
Sanitary Sewer Construction Inspection Partial 10/27/2017 at 8:15 AM 10/27/2017
PW-Main inspection
Informational
10/26/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/26/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/26/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/26/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/26/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/26/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/26/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/26/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/26/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/26/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/26/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/26/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/26/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/26/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/26/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/26/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/26/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/26/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
PW-Main inspection
Informational
10/26/2017
The contractors are almost to MH 1-3, the 3 wyes have been installed and are completed.Steve Robbins 10/24/2017 9:56 AM
PW-Main inspection
Informational
10/26/2017
The contractors have installed MH 1-3, they are still hitting rock, they plan on installing the wye for the 4th service line later today.Steve Robbins 10/26/2017 12:02 PM
PW-Main inspection
Informational
10/27/2017
The trench check is not done yet and they are installing the service line to the building.Steve Robbins 10/27/2017 8:43 AM
Sanitary Sewer Construction Inspection Partial 10/27/2017 at 2:15 PM 10/27/2017
PW-Main inspection
Informational
10/27/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/27/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/27/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/27/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/27/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/27/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/27/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/27/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/27/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/27/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/27/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/27/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/27/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/27/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/27/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/27/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/27/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/27/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
PW-Main inspection
Informational
10/27/2017
The contractors are almost to MH 1-3, the 3 wyes have been installed and are completed.Steve Robbins 10/24/2017 9:56 AM
PW-Main inspection
Informational
10/27/2017
The contractors have installed MH 1-3, they are still hitting rock, they plan on installing the wye for the 4th service line later today.Steve Robbins 10/26/2017 12:02 PM
PW-Main inspection
Informational
10/27/2017
The trench check is not done yet and they are installing the service line to the building.Steve Robbins 10/27/2017 8:43 AM
PW-Main inspection
Informational
10/27/2017
The contractors are continuing to install the service line toward the building and the grease trap. They just installed the clean-out. They put in about 50 feet of lateral pipe.Steve Robbins 10/27/2017 3:14 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/30/2017 at 8:00 AM 10/30/2017
PW-Misc
Informational
10/26/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/26/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/26/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/26/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/26/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/26/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
PW-Misc
Informational
10/26/2017
The last wye for the service line going to the building has been completed, they have installed tracer wire and anode, they just need to do the trench check.Steve Robbins 10/26/2017 3:50 PM
PW-Misc
Informational
10/30/2017
The contractors have installed all the wyes and service stubs and have completed all the anodes, tracer wire and trench checks for the stubs off the main. The contractors are working on the stub to the building and the grease interceptor. The 2 clean-outs have been installed.Steve Robbins 10/30/2017 12:25 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/30/2017 at 2:30 PM 10/30/2017
PW-Misc
Informational
10/30/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/30/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/30/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/30/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/30/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/30/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
PW-Misc
Informational
10/30/2017
The last wye for the service line going to the building has been completed, they have installed tracer wire and anode, they just need to do the trench check.Steve Robbins 10/26/2017 3:50 PM
PW-Misc
Informational
10/30/2017
The contractors have installed all the wyes and service stubs and have completed all the anodes, tracer wire and trench checks for the stubs off the main. The contractors are working on the stub to the building and the grease interceptor. The 2 clean-outs have been installed.Steve Robbins 10/30/2017 12:25 PM
PW-Misc
Informational
10/30/2017
The contractors are continuing to work on the service line.Steve Robbins 10/30/2017 2:50 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Partial 10/31/2017 at 10:30 AM 10/31/2017
PW-Misc
Informational
10/30/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/30/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/30/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/30/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/30/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/30/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
PW-Misc
Informational
10/30/2017
The last wye for the service line going to the building has been completed, they have installed tracer wire and anode, they just need to do the trench check.Steve Robbins 10/26/2017 3:50 PM
PW-Misc
Informational
10/30/2017
The contractors have installed all the wyes and service stubs and have completed all the anodes, tracer wire and trench checks for the stubs off the main. The contractors are working on the stub to the building and the grease interceptor. The 2 clean-outs have been installed.Steve Robbins 10/30/2017 12:25 PM
PW-Misc
Informational
10/30/2017
The contractors are continuing to work on the service line.Steve Robbins 10/30/2017 2:50 PM
PW-Misc
Informational
10/31/2017
The wyes and service connections have all been completed. The sanitary MH connecting to the service line coming out of the building has been installed. The grease intercepter has also been installed, I told them they needed to get the buildinginspector the look at the grease intercepter. All connections to the building and the service line has been completed. They still need to pour the invert for the MH.Steve Robbins 10/31/2017 2:44 PM
Sanitary Sewer - Wye / Insert-A-Tee Installation Passed 11/1/2017 at 12:00 PM 11/01/2017
PW-Misc
Informational
10/31/2017
They wyes for the first 2 lots has been installed , the tracer wire and trench check has not been installed for the second lot.
PW-Misc
Informational
10/31/2017
The first 2 wyes have all been installed with tracer wire , anodes, and trench check has been completed.They hit a lot of rock so they are moving slow.
PW-Misc
Informational
10/31/2017
They have not installed the 3rd wye yet, they are stil hitting alot of rock, I will be back in the morning.Steve Robbins 10/19/2017 2:41 PM
PW-Misc
Informational
10/31/2017
The 3rd wye has been tied in, the tracer wire has been installed, they are planning on doing the rock check this afternoon.Steve Robbins 10/23/2017 9:01 AM
PW-Misc
Informational
10/31/2017
The trench check for the 3rd building service line has been completed. They are now working on the main going to MH 1-3.Steve Robbins 10/23/2017 11:00 AM
PW-Misc
Informational
10/31/2017
They are working on the last wye service line before they install the MH 1-3. They are hoping to get the MH installed this aftenoon.Steve Robbins 10/25/2017 3:54 PM
PW-Misc
Informational
10/31/2017
The last wye for the service line going to the building has been completed, they have installed tracer wire and anode, they just need to do the trench check.Steve Robbins 10/26/2017 3:50 PM
PW-Misc
Informational
10/31/2017
The contractors have installed all the wyes and service stubs and have completed all the anodes, tracer wire and trench checks for the stubs off the main. The contractors are working on the stub to the building and the grease interceptor. The 2 clean-outs have been installed.Steve Robbins 10/30/2017 12:25 PM
PW-Misc
Informational
10/31/2017
The contractors are continuing to work on the service line.Steve Robbins 10/30/2017 2:50 PM
PW-Misc
Informational
10/31/2017
The wyes and service connections have all been completed. The sanitary MH connecting to the service line coming out of the building has been installed. The grease intercepter has also been installed, I told them they needed to get the buildinginspector the look at the grease intercepter. All connections to the building and the service line has been completed. They still need to pour the invert for the MH.Steve Robbins 10/31/2017 2:44 PM
PW-Misc
Informational
11/01/2017
All the wyes and all the sanitary have been completed. The service line has been connected from the building.Steve Robbins 11/01/2017 12:25 PM
Storm Sewer Construction Inspection Partial 11/2/2017 at 1:00 PM 11/02/2017
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
10/12/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
10/12/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
10/12/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/02/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
Storm Sewer Construction Inspection Partial 11/6/2017 at 8:45 AM 11/06/2017
PW-Storm Sewer Inspection
Informational
11/02/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/02/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/02/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/02/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/02/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/02/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/02/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/02/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/02/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/02/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
Sanitary Sewer Construction Inspection Passed 11/6/2017 at 9:30 AM 11/06/2017
PW-Main inspection
Informational
10/27/2017
The bore company was doing the bore this morning, the bore is complete, they will be installing the steel casing in the morning.
PW-Main inspection
Informational
10/27/2017
The contractors are still working on the bore. They should beging working on the steel casing sometime today.
PW-Main inspection
Informational
10/27/2017
The crew stopped working this morning due to the rain.
PW-Main inspection
Informational
10/27/2017
The contractors are working on getting all the water out of the hole this morning so they can continue work on the steel casing.
PW-Main inspection
Informational
10/27/2017
The steel casing pipe has been installed for the bore, it has been welded together and is ready for the spacers and 8" sanitary pipe to be installed.
PW-Main inspection
Informational
10/27/2017
The contractor has to order a new base for MH 1-1 because the pipe will not line up comin out of the MH. The bore is completed and the pipe is in the steel encasement and the have installed the spacers.They are going to work on water and storm while they wait for the MH.
PW-Main inspection
Informational
10/27/2017
The contractor is installing the last section of 8" sanitary pipe in the steel encasement. The new MH for 1-2 is here. They will be working on this today.Steve Robbins 10/04/2017 9:15 AM
PW-Main inspection
Informational
10/27/2017
The contractors are working on pumping out the water by the casing pipe. The spacers have been installed and the pipe, when they get the end seal on we are going to do a pressure test before they connect to the main and have a core drill. Steve Robbins 10/05/2017 9:18 AM
PW-Main inspection
Informational
10/27/2017
Today we did and compression test on the 8" sanitary encasement to make sure before they connect to the MH. I did the test for 7:34 , it passed, we will do another one when everything is connected and waits for 30 days.Steve Robbins 10/05/2017 3:56 PM
PW-Main inspection
Informational
10/27/2017
The core drill into MH existing MH 1-1 was done this morning, the approved a-lok boot has been installed and the connection has been made with the 8" sanitary pipe. They have installed the stainless steel spacers for the encasement and the end seal has been installed. I am leaving for the day and they are planning on backfilling this afternoon. They are also connected to MH 1-2. Steve Robbins 10/06/2017 12:00 PM
PW-Main inspection
Informational
10/27/2017
The core drill for existiang MH 1-1 has been completed. The A-lok boot has been installed, the 8" sanitary pipe has been installed and the end seal has been installed. They are also connected to MH 1-2 and the same has been done there. They will be stacking MH 1-2 today and begin digging toward 1-3.Steve Robbins 10/09/2017 9:13 AM
PW-Main inspection
Informational
10/27/2017
They are working the pipe coming out of MH 1-2. There is a service line with a wye coming up, I told them they needed tracer wire and a 1 pound anode with a trench check.
PW-Main inspection
Informational
10/27/2017
The pipe is coming out of MH 1-2 and I told them no wye closer than 4 ft. to a joint. They may work tomorrow but they will not backfill anything until I inspect it on monday morning.Steve Robbins 10/13/2017 3:02 PM
PW-Main inspection
Informational
10/27/2017
The contractors have installed the first wye from MH 1-2. I talked to them about tracer wire, anodes and trench checks. They are working on getting the supplies.Steve Robbins 10/16/2017 8:59 AM
PW-Main inspection
Informational
10/27/2017
The contractors have not got their supplies for the tracer wire yet. They installed 2 sticks of pipe on the 8" main and installed the wye and the 6" service line.Steve Robbins 10/16/2017 3:30 PM
PW-Main inspection
Informational
10/27/2017
The contractors have installed the tracer wire and anode for the first service line. The trench check has not been done yet.
PW-Main inspection
Informational
10/27/2017
They have installed some more 8" pipe , they are close to installing the next service line/wye.Steve Robbins 10/17/2017 12:56 PM
PW-Main inspection
Informational
10/27/2017
They are still hitting a lot of rock, they are almost to the 3rd service line where they will install another wye with tracer wire and anode.Steve Robbins 10/19/2017 10:36 AM
PW-Main inspection
Informational
10/27/2017
The contractors are almost to MH 1-3, the 3 wyes have been installed and are completed.Steve Robbins 10/24/2017 9:56 AM
PW-Main inspection
Informational
10/27/2017
The contractors have installed MH 1-3, they are still hitting rock, they plan on installing the wye for the 4th service line later today.Steve Robbins 10/26/2017 12:02 PM
PW-Main inspection
Informational
10/27/2017
The trench check is not done yet and they are installing the service line to the building.Steve Robbins 10/27/2017 8:43 AM
PW-Main inspection
Informational
10/27/2017
The contractors are continuing to install the service line toward the building and the grease trap. They just installed the clean-out. They put in about 50 feet of lateral pipe.Steve Robbins 10/27/2017 3:14 PM
Informational
11/06/2017
All the sanitary has been completed and backfilled. The sanitary line was backfilled 10/30/17. They can do sanitary testing in 30 days from that date.Steve Robbins 11/06/2017 12:54 PM
Backflow Preventer and Vault Partial 11/8/2017 at 7:45 AM 11/08/2017
PW-Misc
Informational
11/08/2017
The blackflow preventer vault has been installed , it is sitting on 6" of rock, they are digging the trench so they can install the 6" fireline.Steve Robbins 11/08/2017 8:30 AM
Storm Sewer Construction Inspection Partial 11/8/2017 at 10:30 AM 11/08/2017
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/06/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/06/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/06/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/06/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/06/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/06/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/06/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
Backflow Preventer and Vault Partial 11/8/2017 at 2:00 PM 11/08/2017
PW-Misc
Informational
11/08/2017
The blackflow preventer vault has been installed , it is sitting on 6" of rock, they are digging the trench so they can install the 6" fireline.Steve Robbins 11/08/2017 8:30 AM
PW-Misc
Informational
11/08/2017
The contractors have been working on getting the 6" fireline up to the backflow preventor vault.Steve Robbins 11/08/2017 2:42 PM
Fire Line Construction Inspection Partial 11/9/2017 at 8:00 AM 11/09/2017
Informational
11/08/2017
Informational
11/09/2017
The contractors have installed ductile iron going through the backflow. They are continuing with the 6" fireline gong to the building.
Backflow Preventer and Vault Passed 11/9/2017 at 7:45 AM 11/10/2017
PW-Misc
Informational
11/08/2017
The blackflow preventer vault has been installed , it is sitting on 6" of rock, they are digging the trench so they can install the 6" fireline.Steve Robbins 11/08/2017 8:30 AM
PW-Misc
Informational
11/08/2017
The contractors have been working on getting the 6" fireline up to the backflow preventor vault.Steve Robbins 11/08/2017 2:42 PM
PW-Misc
Informational
11/10/2017
The 6" fireline and the 4" domestic service line has been completed. The backflow preventer has been installed and is complete, it has ductile iron with ductile iron phanges. Theyalso put a straddle block in front of the vault on the 6" line.Steve Robbins 11/10/2017 10:00 AM
Fire Line Construction Inspection Passed 11/10/2017 at 8:00 AM 11/10/2017
Informational
11/10/2017
The fireline has been completely installed and the fire hydrant has also been installed. All the thrust blocks have been installed.Steve Robbins 11/10/2017 10:06 AM
Roof Drain Partial 11/13/2017 at 2:30 PM 11/13/2017
Informational
11/13/2017
The contractors are installing the roof drains that are behind the building, they will probably finish tomorrow and then start on the rest of the storm.Steve Robbins 11/13/2017 3:42 PM
Roof Drain Partial 11/14/2017 at 11:00 AM 11/15/2017
Informational
11/15/2017
They were still working on the roofdrains on the back side of the building.
Roof Drain Passed 11/15/2017 at 9:00 AM 11/15/2017
Informational
11/15/2017
All the roof drains have been installed and connected to the storm pipe.Steve Robbins 11/15/2017 9:39 AM
Storm Sewer Construction Inspection Partial 11/15/2017 at 2:00 PM 11/15/2017
PW-Storm Sewer Inspection
Informational
11/08/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/08/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/08/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/08/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/08/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/08/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/08/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/08/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
Storm structure 2-3 and 2-2 has been installed and they are working toward 2-1.Steve Robbins 11/15/2017 2:31 PM
Storm Sewer Construction Inspection Partial 11/16/2017 at 8:00 AM 11/16/2017
PW-Storm Sewer Inspection
Informational
11/15/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/15/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/15/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/15/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/15/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/15/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/15/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/15/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
PW-Storm Sewer Inspection
Informational
11/15/2017
Storm structure 2-3 and 2-2 has been installed and they are working toward 2-1.Steve Robbins 11/15/2017 2:31 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
Structure 2-1 has been installed and they are backfilling. They have hit alot of rock and things are moving slow.Steve Robbins 11/16/2017 2:50 PM
Storm Sewer Construction Inspection Partial 11/17/2017 at 2:46 PM 11/17/2017
PW-Storm Sewer Inspection
Informational
11/16/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/16/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/16/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/16/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/16/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/16/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/16/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
PW-Storm Sewer Inspection
Informational
11/16/2017
Storm structure 2-3 and 2-2 has been installed and they are working toward 2-1.Steve Robbins 11/15/2017 2:31 PM
PW-Storm Sewer Inspection
Informational
11/16/2017
Structure 2-1 has been installed and they are backfilling. They have hit alot of rock and things are moving slow.Steve Robbins 11/16/2017 2:50 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
Matt Munger 11/17/2017 3:59 PM Came out to B&B to cover for Steve Robbins. Contractors poured the collar for the storm box at the corner of SW Kessler Dr. & SW Fascination Dr. I observed the contractors form the concrete to the existing box.
Storm Sewer Construction Inspection Partial 11/27/2017 at 9:00 AM 11/27/2017
PW-Storm Sewer Inspection
Informational
11/17/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/17/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/17/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/17/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/17/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/17/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/17/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
PW-Storm Sewer Inspection
Informational
11/17/2017
Storm structure 2-3 and 2-2 has been installed and they are working toward 2-1.Steve Robbins 11/15/2017 2:31 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
Structure 2-1 has been installed and they are backfilling. They have hit alot of rock and things are moving slow.Steve Robbins 11/16/2017 2:50 PM
PW-Storm Sewer Inspection
Informational
11/17/2017
Matt Munger 11/17/2017 3:59 PM Came out to B&B to cover for Steve Robbins. Contractors poured the collar for the storm box at the corner of SW Kessler Dr. & SW Fascination Dr. I observed the contractors form the concrete to the existing box.
PW-Storm Sewer Inspection
Informational
11/27/2017
The storm structures 3-2, 3-3, 3-4 and 3-5 have been installed . They are working toward 3-6 for this afternoon.Steve Robbins 11/27/2017 10:06 AM
Storm Sewer Construction Inspection Passed 11/30/2017 at 2:00 PM 11/30/2017
PW-Storm Sewer Inspection
Informational
11/27/2017
The contractors connected to the existing storm box. They are pouring the collars this afternoon and trying to backfill before the rain tomorrow.
PW-Storm Sewer Inspection
Informational
11/27/2017
Last week they tied into existing 3-1 and installed 3-2 storm inlet. Over the weekend they install about 70 ft. of storm pipe heading toward storm inlet 3-3. They will be working on this pipe today.Steve Robbins 10/02/2017 9:09 AM
PW-Storm Sewer Inspection
Informational
11/27/2017
The contractor has installed another 30 ft. of pipe with rock, they will backfill now .Steve Robbins 10/03/2017 10:07 AM
PW-Storm Sewer Inspection
Informational
11/27/2017
Today the contractors are continuing on the storm pipe , they have picked up where they left off heading toward storm structure 3-3. There is also one roof drain they are going to tie into the storm pipe.Steve Robbins 10/10/2017 10:54 AM
PW-Storm Sewer Inspection
Informational
11/27/2017
This afternoon the contractors installed 3 sticks of storm pipe and connected one roof drain to the pipe on there way towards structure 3-3.Steve Robbins 10/10/2017 2:40 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
The contractors are backfilling the storm they did yesterday and they are getting compaction tests.Steve Robbins 10/11/2017 11:21 AM
PW-Storm Sewer Inspection
Informational
11/27/2017
I was off on my numbers for the storm structures, they have connected to existing 1-1 , installed 1-2 and now they are installing 1-3 nyoplast. They have done compaction tests and backfilled up to structure 1-3.Steve Robbins 10/11/2017 2:29 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
The contractors are working on nyoplast structure 1-4 is being installed today.Steve Robbins 10/12/2017 12:49 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
The Nyoplast structure 1-4 has the wrong flow line coming out , so they have to get it re-made. Tomorrow they will go back to sanitary.Steve Robbins 10/12/2017 2:38 PM
PW-Storm Sewer Inspection
Corrective Action Required
11/27/2017
They have 1-4 installed and are now working on 1-5.Steve Robbins 11/02/2017 4:08 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
The contractors have now insalled structures 1-5,1-6. 1-7, and 1-8. They are working on 1-9.Steve Robbins 11/06/2017 12:48 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
The storm structure up to 1-9 have been installed, they will start on the other side of the building after they finish the water line.Steve Robbins 11/08/2017 11:31 AM
PW-Storm Sewer Inspection
Informational
11/27/2017
Storm structure 2-3 and 2-2 has been installed and they are working toward 2-1.Steve Robbins 11/15/2017 2:31 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
Structure 2-1 has been installed and they are backfilling. They have hit alot of rock and things are moving slow.Steve Robbins 11/16/2017 2:50 PM
PW-Storm Sewer Inspection
Informational
11/27/2017
Matt Munger 11/17/2017 3:59 PM Came out to B&B to cover for Steve Robbins. Contractors poured the collar for the storm box at the corner of SW Kessler Dr. & SW Fascination Dr. I observed the contractors form the concrete to the existing box.
PW-Storm Sewer Inspection
Informational
11/27/2017
The storm structures 3-2, 3-3, 3-4 and 3-5 have been installed . They are working toward 3-6 for this afternoon.Steve Robbins 11/27/2017 10:06 AM
PW-Storm Sewer Inspection
Informational
11/30/2017
Storm structure 3-6, 3-7, and 3-8 has been completed. This finishes all the storm pipe.Steve Robbins 11/30/2017 3:12 PM
Commercial Curb Inspection Partial 11/30/2017 at 11:30 AM 11/30/2017
Informational
11/30/2017
The curbs are being installed on the north and south sides of the building. The have already installed the subgrade and did a proofroll. A portion of the parking lot is concrete and the other is asphalt. Geo-grid has been installed on the part that is asphalt and rock was installed for the concrete.Steve Robbins 11/30/2017 3:25 PM
Fire Line - Hydrostatic Test Passed 11/30/2017 at 12:00 PM 11/30/2017
PW-Misc
Informational
11/30/2017
The hydrostatic pressure test has been done today and has passed for 2 hrs.Steve Robbins 11/30/2017 3:31 PM
Sanitary Sewer - Air Test Passed 12/1/2017 at 9:45 AM 12/01/2017
PW-Sanitary Sewer Testing
Informational
12/01/2017
The air test was performed this morning from the existing MH to MH 1-1, 1-1 to 1-2, and 1-2 to 1-3. The test has been done and has passed.Steve Robbins 12/01/2017 2:50 PM
Sanitary Sewer Construction Inspection Passed 12/1/2017 at 11:45 AM 12/01/2017
PW-Main inspection
Informational
12/01/2017
All the sanitary sewer line and laterals have been constructed and is complete.Steve Robbins 12/01/2017 2:57 PM
Fire Line - Flush Passed 12/1/2017 at 9:30 AM 12/01/2017
PW-Misc
Informational
12/01/2017
This moring we flushed the 6" fire line. This is complete , but we have to get samples from the backflow preventer because the fire line was connected accross the street at the main. We will also get samples from the domestic line that is tapped into the fire line.Steve Robbins 12/01/2017 3:17 PM
Water Line - Coliform Test 1 Partial 12/1/2017 at 10:00 AM 12/01/2017
PW-Misc
Informational
12/01/2017
The 6" fire line up to the backflow preventer has been chlorinated and the 4 " domestic line has also been flushed and chlorinated. On Monday we will de-chlorinate and flush and begin samples on tuesday.Steve Robbins 12/01/2017 3:25 PM
Sanitary Sewer - Mandrel Passed 12/4/2017 at 9:00 AM 12/06/2017
PW-Misc
Informational
12/06/2017
The mandrel test was done from existing MH 1-1 to 1-2 and from 1-2 to 1-3. This is an 8" line.Steve Robbins 12/06/2017 8:35 AM
Sanitary Sewer - Vacuum Passed 12/5/2017 at 10:00 AM 12/06/2017
PW-Sanitary Sewer Testing
Informational
12/06/2017
The vacuum test has been completed for all the MH on the public and private side. They all passed.
Sanitary Sewer - Invert Passed 12/1/2017 at 12:00 PM 12/06/2017
PW-Misc
Informational
12/06/2017
The inverts for the MH's have been poured.
Water Line - Coliform Test 1 Partial 12/6/2017 at 11:00 AM 12/07/2017
PW-Misc
Informational
12/01/2017
The 6" fire line up to the backflow preventer has been chlorinated and the 4 " domestic line has also been flushed and chlorinated. On Monday we will de-chlorinate and flush and begin samples on tuesday.Steve Robbins 12/01/2017 3:25 PM
PW-Misc
Informational
12/07/2017
We have de-chlorinated the lines and flushed the line. I took the first samples to the lab. 1 from the backflow preventer and one from the building with a duplicate from the building.Steve Robbins 12/07/2017 7:47 AM
Curb - Proof Roll Passed 11/30/2017 at 2:00 PM 12/07/2017
PW-Misc
Informational
12/07/2017
The proofroll for the curbs in the parking lot and private street has passed.Steve Robbins 12/07/2017 3:25 PM
Water Line - Coliform Test 1 Partial 12/7/2017 at 1:00 PM 12/07/2017
PW-Misc
Informational
12/07/2017
The 6" fire line up to the backflow preventer has been chlorinated and the 4 " domestic line has also been flushed and chlorinated. On Monday we will de-chlorinate and flush and begin samples on tuesday.Steve Robbins 12/01/2017 3:25 PM
PW-Misc
Informational
12/07/2017
The first round of samples passed and I took the second round today. Steve Robbins 12/07/2017 3:58 PM
PW-Misc
Informational
12/07/2017
We have de-chlorinated the lines and flushed the line. I took the first samples to the lab. 1 from the backflow preventer and one from the building with a duplicate from the building.Steve Robbins 12/07/2017 7:47 AM
Water Line - Coliform Test 1 Passed 12/11/2017 at 7:15 AM 12/11/2017
PW-Misc
Informational
12/07/2017
The first round of samples passed and I took the second round today. Steve Robbins 12/07/2017 3:58 PM
PW-Misc
Informational
12/07/2017
The 6" fire line up to the backflow preventer has been chlorinated and the 4 " domestic line has also been flushed and chlorinated. On Monday we will de-chlorinate and flush and begin samples on tuesday.Steve Robbins 12/01/2017 3:25 PM
PW-Misc
Informational
12/07/2017
We have de-chlorinated the lines and flushed the line. I took the first samples to the lab. 1 from the backflow preventer and one from the building with a duplicate from the building.Steve Robbins 12/07/2017 7:47 AM
PW-Misc
Informational
12/11/2017
The samples from the backflow preventer and the building have passed on both days. I received the results for the passing samples on friday.Steve Robbins 12/11/2017 7:47 AM
Commercial Curb Inspection Passed 12/4/2017 at 10:00 AM 12/12/2017
Informational
12/12/2017
All the curbs for the parking lot and private street have been proofrolled and have all been installed with a curb machince that could be.
Sanitary Sewer - Invert Partial 12/12/2017 at 10:30 AM 12/12/2017
PW-Misc
Corrective Action Required
12/12/2017
The inverts have been poured, but when i checked the existing MH that the core drill was done on the invert does not come up to the bottom of the pipe. I called the contractor and they said they would come out and take care of it.Steve Robbins 12/12/2017 2:23 PM
Pavement-Surface Partial 12/13/2017 at 7:45 AM 12/13/2017
PW-Misc
Informational
12/13/2017
They are installing base this morning, it is type II base asphalt this morning. I talked with Ryan and we decided they can install at 30 degrees . Steve Robbins 12/13/2017 3:26 PM
Pavement-Surface Passed 12/14/2017 at 10:30 AM 12/14/2017
PW-Misc
Informational
12/13/2017
They are installing base this morning, it is type II base asphalt this morning. I talked with Ryan and we decided they can install at 30 degrees . Steve Robbins 12/13/2017 3:26 PM
PW-Misc
Informational
12/14/2017
The base for the parking lot and the private street has all been installed. They are planning on doing the surface on wednesday of next week if the weather is good.Steve Robbins 12/14/2017 1:46 PM
Sanitary Sewer - Invert Passed 12/14/2017 at 11:00 AM 12/14/2017
PW-Misc
Corrective Action Required
12/12/2017
The inverts have been poured, but when i checked the existing MH that the core drill was done on the invert does not come up to the bottom of the pipe. I called the contractor and they said they would come out and take care of it.Steve Robbins 12/12/2017 2:23 PM
PW-Misc
Resolved
12/14/2017
The contractors have corrected the problem by bringing the invert to the bottom of the pipe.Steve Robbins 12/14/2017 2:31 PM
Street - Surface Course Passed 12/18/2017 at 11:00 AM 12/18/2017
PW-Misc
Informational
12/18/2017
I came by around 11:00 just to make sure the temp was at 50 for the surface, it was 51 and rising. They completed the surface on saturday.Steve Robbins 12/18/2017 9:52 AM
Sidewalk Inspection Partial 12/21/2017 at 10:00 AM 12/22/2017
PW-Misc
Informational
12/22/2017
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
Sanitary Sewer Construction Inspection Partial 12/27/2017 at 1:30 PM 12/27/2017
PW-Main inspection
Informational
12/27/2017
The camera test has passed from the water dept. but there is debris in the line and needs to be flushed again before it will pass.Steve Robbins 12/27/2017 2:40 PM
Sidewalk Inspection Failed 1/8/2018 at 11:15 AM 01/08/2018
PW-Misc
Informational
12/22/2017
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
01/08/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
Sidewalk Inspection Partial 1/9/2018 at 11:00 AM 01/09/2018
PW-Misc
Informational
01/08/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
01/08/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
01/09/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
Sanitary Sewer Construction Inspection Partial 1/23/2018 at 9:15 AM 01/23/2018
PW-Main inspection
Informational
12/27/2017
The camera test has passed from the water dept. but there is debris in the line and needs to be flushed again before it will pass.Steve Robbins 12/27/2017 2:40 PM
PW-Main inspection
Corrective Action Required
01/23/2018
Icalled the contractor to let them know they need to flush the line again.Steve Robbins 01/23/2018 9:44 AM
ESC Devices Installed Complete 1/24/2018 at 9:30 AM 01/24/2018
PW-Misc
Informational
01/24/2018
The erosion control here is in good condition.Steve Robbins 01/24/2018 12:59 PM
Sidewalk Inspection Failed 1/25/2018 at 11:00 AM 01/25/2018
PW-Misc
Informational
01/09/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
01/09/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
01/09/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
01/25/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
Sidewalk Inspection Failed 2/5/2018 at 11:30 AM 02/01/2018
PW-Misc
Informational
01/25/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
01/25/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
01/25/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
01/25/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/01/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
Grading/Excavation/Fill Inspection Partial 2/2/2018 at 2:00 PM 02/02/2018
PW-Misc
Informational
02/02/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
Sidewalk Inspection Partial 2/5/2018 at 1:00 PM 02/05/2018
PW-Misc
Informational
02/01/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
02/01/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
02/01/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/01/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/01/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
PW-Misc
Corrective Action Required
02/05/2018
No work was done on the sidewalk today.Steve Robbins 02/05/2018 1:12 PM
Sanitary Sewer Construction Inspection Partial 2/5/2018 at 1:30 PM 02/05/2018
PW-Main inspection
Informational
01/23/2018
The camera test has passed from the water dept. but there is debris in the line and needs to be flushed again before it will pass.Steve Robbins 12/27/2017 2:40 PM
PW-Main inspection
Corrective Action Required
01/23/2018
Icalled the contractor to let them know they need to flush the line again.Steve Robbins 01/23/2018 9:44 AM
PW-Main inspection
Corrective Action Required
02/05/2018
I spoke with the contractor and they will flush the sanitary line when the weather breaks.Steve Robbins 02/05/2018 1:40 PM
Grading/Excavation/Fill Inspection Partial 2/7/2018 at 11:30 AM 02/07/2018
PW-Misc
Informational
02/02/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
PW-Misc
Informational
02/07/2018
Nothing going on outside today.Steve Robbins 02/07/2018 3:47 PM
Sidewalk Inspection Partial 2/9/2018 at 9:00 AM 02/09/2018
PW-Misc
Informational
02/05/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
02/05/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
02/05/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/05/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/05/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
PW-Misc
Corrective Action Required
02/05/2018
No work was done on the sidewalk today.Steve Robbins 02/05/2018 1:12 PM
PW-Misc
Corrective Action Required
02/09/2018
No work was done on this today.Steve Robbins 02/09/2018 1:54 PM
Grading/Excavation/Fill Inspection Partial 2/12/2018 at 11:00 AM 02/12/2018
PW-Misc
Informational
02/07/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
PW-Misc
Informational
02/07/2018
Nothing going on outside today.Steve Robbins 02/07/2018 3:47 PM
PW-Misc
Informational
02/12/2018
The contractors are moving dirt from the back of the lot to the village of view high project.Steve Robbins 02/12/2018 11:34 AM
Sidewalk Inspection Partial 2/13/2018 at 12:45 PM 02/13/2018
PW-Misc
Informational
02/09/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
02/09/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
02/09/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/09/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/09/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
PW-Misc
Corrective Action Required
02/09/2018
No work was done on the sidewalk today.Steve Robbins 02/05/2018 1:12 PM
PW-Misc
Corrective Action Required
02/09/2018
No work was done on this today.Steve Robbins 02/09/2018 1:54 PM
PW-Misc
Corrective Action Required
02/13/2018
They have not corrected this ADA turn-around yet. Harold said when the concrete crew comes out again they will take care of it. I noticed they had blankets down in front of the build, so I think they are getting ready to form.Steve Robbins 02/13/2018 1:35 PM
Grading/Excavation/Fill Inspection Partial 2/16/2018 at 8:00 AM 02/16/2018
PW-Misc
Informational
02/12/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
PW-Misc
Informational
02/12/2018
Nothing going on outside today.Steve Robbins 02/07/2018 3:47 PM
PW-Misc
Informational
02/12/2018
The contractors are moving dirt from the back of the lot to the village of view high project.Steve Robbins 02/12/2018 11:34 AM
PW-Misc
Informational
02/16/2018
They took the fence down around the property and are doing final grading.Steve Robbins 02/16/2018 3:51 PM
Erosion Control Inspection Partial 2/20/2018 at 11:45 AM 02/20/2018
PW-Misc
Informational
02/20/2018
The silt fence is up and nothing seems to be leaving the property, the piles of dirt are almost all gone.Steve Robbins 02/20/2018 2:43 PM
Grading/Excavation/Fill Inspection Partial 2/22/2018 at 1:15 PM 02/22/2018
PW-Misc
Informational
02/16/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
PW-Misc
Informational
02/16/2018
Nothing going on outside today.Steve Robbins 02/07/2018 3:47 PM
PW-Misc
Informational
02/16/2018
The contractors are moving dirt from the back of the lot to the village of view high project.Steve Robbins 02/12/2018 11:34 AM
PW-Misc
Informational
02/16/2018
They took the fence down around the property and are doing final grading.Steve Robbins 02/16/2018 3:51 PM
PW-Misc
Informational
02/22/2018
There was no grading going on today, only work on the inside.Steve Robbins 02/22/2018 3:06 PM
Sanitary Sewer Construction Inspection Partial 2/26/2018 at 11:25 AM 02/26/2018
PW-Main inspection
Informational
02/05/2018
The camera test has passed from the water dept. but there is debris in the line and needs to be flushed again before it will pass.Steve Robbins 12/27/2017 2:40 PM
PW-Main inspection
Corrective Action Required
02/05/2018
Icalled the contractor to let them know they need to flush the line again.Steve Robbins 01/23/2018 9:44 AM
PW-Main inspection
Corrective Action Required
02/05/2018
I spoke with the contractor and they will flush the sanitary line when the weather breaks.Steve Robbins 02/05/2018 1:40 PM
PW-Main inspection
Corrective Action Required
02/26/2018
I spoke with the contractor and they will be here on thursday to flush the sanitary line.Steve Robbins 02/26/2018 11:38 AM
Sanitary Sewer Construction Inspection Passed 3/1/2018 at 10:30 AM 03/01/2018
PW-Main inspection
Informational
02/26/2018
The camera test has passed from the water dept. but there is debris in the line and needs to be flushed again before it will pass.Steve Robbins 12/27/2017 2:40 PM
PW-Main inspection
Corrective Action Required
02/26/2018
Icalled the contractor to let them know they need to flush the line again.Steve Robbins 01/23/2018 9:44 AM
PW-Main inspection
Corrective Action Required
02/26/2018
I spoke with the contractor and they will flush the sanitary line when the weather breaks.Steve Robbins 02/05/2018 1:40 PM
PW-Main inspection
Corrective Action Required
02/26/2018
I spoke with the contractor and they will be here on thursday to flush the sanitary line.Steve Robbins 02/26/2018 11:38 AM
PW-Main inspection
Resolved
03/01/2018
This morning the contractor did a complete flush on the sanitary sewer line. This now completes all the testing and all related items to the sanitary sewer.Steve Robbins 03/01/2018 3:43 PM
Sidewalk Inspection Failed 3/7/2018 at 11:00 AM 03/06/2018
PW-Misc
Informational
02/13/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
02/13/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
02/13/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/13/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
02/13/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
PW-Misc
Corrective Action Required
02/13/2018
No work was done on the sidewalk today.Steve Robbins 02/05/2018 1:12 PM
PW-Misc
Corrective Action Required
02/13/2018
No work was done on this today.Steve Robbins 02/09/2018 1:54 PM
PW-Misc
Corrective Action Required
02/13/2018
They have not corrected this ADA turn-around yet. Harold said when the concrete crew comes out again they will take care of it. I noticed they had blankets down in front of the build, so I think they are getting ready to form.Steve Robbins 02/13/2018 1:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/06/2018
The sidewalk does not meet ADA guidelines. I talked with Harold and there are several ADA domes that are 4 ft. instead of 5 ft. They are going to pull them out and put in 5 ft. Steve Robbins 03/06/2018 4:07 PM
Grading/Excavation/Fill Inspection Passed 3/8/2018 at 9:00 AM 03/08/2018
PW-Misc
Informational
02/22/2018
The contractors were doing grading and moving the pile of dirt behind the building over to view high.Steve Robbins 02/02/2018 3:50 PM
PW-Misc
Informational
02/22/2018
Nothing going on outside today.Steve Robbins 02/07/2018 3:47 PM
PW-Misc
Informational
02/22/2018
The contractors are moving dirt from the back of the lot to the village of view high project.Steve Robbins 02/12/2018 11:34 AM
PW-Misc
Informational
02/22/2018
They took the fence down around the property and are doing final grading.Steve Robbins 02/16/2018 3:51 PM
PW-Misc
Informational
02/22/2018
There was no grading going on today, only work on the inside.Steve Robbins 02/22/2018 3:06 PM
PW-Misc
Informational
03/08/2018
All the final grading has been completed.Steve Robbins 03/08/2018 9:44 AM
Erosion Control Inspection Passed 3/27/2018 03/08/2018
PW-Misc
Informational
02/20/2018
The silt fence is up and nothing seems to be leaving the property, the piles of dirt are almost all gone.Steve Robbins 02/20/2018 2:43 PM
PW-Erosion and Sediment Control
Informational
03/08/2018
The silt fence has been installed all the way around the site. The seed and straw has been installed and stabilized.Steve Robbins 03/08/2018 1:19 PM
Sidewalk Inspection Passed 3/8/2018 03/09/2018
PW-Misc
Informational
03/06/2018
The public sidewalk on fascination going to kessler has all been formed and they are pouring this afternoon. The contractors have set up the ADA going to the parking spaces on fascination. The rock has been installed and compacted. They are ready to pour.Steve Robbins 12/22/2017 11:20 AM
PW-Sidewalk does not meet ADA requirements
Informational
03/06/2018
The sidewalk does not meet ADA guidelines. The ADA ramp going east toward kessler dr. that comes out to the parking lot is not compliant, the slope is over 8.33%. They are going to take out 2 sections so they can achieve the correct slope. The contractors are also pouring this afternoon to the west of the building by Longview.The sidewalk forms and rock has been coverd up with blankets.Steve Robbins 01/08/2018 11:56 AM
PW-Misc
Informational
03/06/2018
The contractors are pouring sidewalk in front of the building, they are also tearing out the ada ramp that did not pass yesterday.The corner of kessler and fascination where they had to tear out for the sanitary sewer tie -in has been put back according to ada standards.Steve Robbins 01/09/2018 12:50 PM
PW-Curb ramp is out of compliance
Corrective Action Required
03/06/2018
The have not corrected the turn-around at for the ADA ramp and kessler and facsination yet. They are finished with all the other sidewalk and approaches.Steve Robbins 01/25/2018 3:32 PM
PW-Curb ramp is out of compliance
Corrective Action Required
03/06/2018
The curb ramp does not meet specs. The contractors have not worked on this yet. Steve Robbins 02/01/2018 1:53 PM
PW-Misc
Corrective Action Required
03/06/2018
No work was done on the sidewalk today.Steve Robbins 02/05/2018 1:12 PM
PW-Misc
Corrective Action Required
03/06/2018
No work was done on this today.Steve Robbins 02/09/2018 1:54 PM
PW-Misc
Corrective Action Required
03/06/2018
They have not corrected this ADA turn-around yet. Harold said when the concrete crew comes out again they will take care of it. I noticed they had blankets down in front of the build, so I think they are getting ready to form.Steve Robbins 02/13/2018 1:35 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/06/2018
The sidewalk does not meet ADA guidelines. I talked with Harold and there are several ADA domes that are 4 ft. instead of 5 ft. They are going to pull them out and put in 5 ft. Steve Robbins 03/06/2018 4:07 PM
PW-Misc
Resolved
03/09/2018
The contractor tore out 7 ADA ramps where the dome was not in compliance. They tore out the 4 ft. and replaced them with 5ft. The ADA and sidewalks are now complete.Steve Robbins 03/09/2018 11:41 AM
Miscellaneous PWORKS Inspection Partial 5/14/2018 at 8:00 AM 05/14/2018
PW-Misc
Corrective Action Required
05/14/2018
On the private side, just off the approach on Fascination , some of the curb and ashphalt sunk about 6 inches. Olsen testing came out and decided that the rock that was hit during installation of the storm and sanitary made a path for the water to get to the area that sunk. They dug down about 10-12 ft. and installed rip-rap on the bottom and then finished with mo-type3 that was compacted in lifts. There is also a few other areas that did the same thing. They are in the process of finishin this up. They are going to install concrete instead of asphalt.Steve Robbins 05/14/2018 10:19 AM
Miscellaneous PWORKS Inspection Passed 5/18/2018 at 10:30 AM 05/18/2018
PW-Misc
Corrective Action Required
05/14/2018
On the private side, just off the approach on Fascination , some of the curb and ashphalt sunk about 6 inches. Olsen testing came out and decided that the rock that was hit during installation of the storm and sanitary made a path for the water to get to the area that sunk. They dug down about 10-12 ft. and installed rip-rap on the bottom and then finished with mo-type3 that was compacted in lifts. There is also a few other areas that did the same thing. They are in the process of finishin this up. They are going to install concrete instead of asphalt.Steve Robbins 05/14/2018 10:19 AM
PW-Misc
Resolved
05/18/2018
The contractors have finished all the work on the parking lot, they compacted the rock , Olson testing was out checking for compaction. They have poured conctrete instead of asphalt. There was 3 or 4 areas around storm drains that they also corrected are now complete.Steve Robbins 05/18/2018 3:15 PM
ESC - (Vegetation/Ground Cover) Partial 5/31/2018 at 10:00 AM 05/31/2018
PW-Misc
Informational
05/31/2018
The vegetation is coming is very well. I am going to let them know they can take down their erosion control.Steve Robbins 05/31/2018 11:08 AM
Miscellaneous PWORKS Inspection Partial 5/31/2018 at 9:45 AM 05/31/2018
PW-Misc
Corrective Action Required
05/31/2018
They have 2 or 3 more area's to finish up in the parking lot where the pavement sunk. There is also 2 panels of sidewalk that need to be replaced in the front of the building that is private.Steve Robbins 05/31/2018 11:16 AM
Miscellaneous PWORKS Inspection Partial 6/1/2018 at 1:45 PM 06/01/2018
PW-Misc
Corrective Action Required
05/31/2018
They have 2 or 3 more area's to finish up in the parking lot where the pavement sunk. There is also 2 panels of sidewalk that need to be replaced in the front of the building that is private.Steve Robbins 05/31/2018 11:16 AM
PW-Misc
Partial Correction
06/01/2018
Today the contractors poured the 2 sections of concrete on the sidewalk that sunk.Steve Robbins 06/01/2018 3:47 PM
Miscellaneous PWORKS Inspection Partial 6/5/2018 at 3:15 PM 06/05/2018
PW-Misc
Corrective Action Required
06/01/2018
They have 2 or 3 more area's to finish up in the parking lot where the pavement sunk. There is also 2 panels of sidewalk that need to be replaced in the front of the building that is private.Steve Robbins 05/31/2018 11:16 AM
PW-Misc
Partial Correction
06/01/2018
Today the contractors poured the 2 sections of concrete on the sidewalk that sunk.Steve Robbins 06/01/2018 3:47 PM
PW-Misc
Resolved
06/05/2018
They have corrected all the areas that dropped in the parking lot and on the private sidewalk. Everything has been completed, I told Harold he can take down the silt fence. Now all they need is the As-builts and the bond for the sanitary.Steve Robbins 06/05/2018 3:41 PM
Miscellaneous PWORKS Inspection Passed 6/21/2018 at 9:45 AM 06/21/2018
PW-Misc
Corrective Action Required
06/05/2018
They have 2 or 3 more area's to finish up in the parking lot where the pavement sunk. There is also 2 panels of sidewalk that need to be replaced in the front of the building that is private.Steve Robbins 05/31/2018 11:16 AM
PW-Misc
Partial Correction
06/05/2018
Today the contractors poured the 2 sections of concrete on the sidewalk that sunk.Steve Robbins 06/01/2018 3:47 PM
PW-Misc
Resolved
06/21/2018
Everything that had sunk has been taken care of and replaced. The punch list has been completed except for removing the silt fence and turning in the as-builds for the sanitary sewer line.Steve Robbins 06/21/2018 3:40 PM
ESC - (Vegetation/Ground Cover) Passed 8/6/2018 08/06/2018
PW-Misc
Informational
05/31/2018
The vegetation is coming is very well. I am going to let them know they can take down their erosion control.Steve Robbins 05/31/2018 11:08 AM
PW-Misc
Informational
08/06/2018
The vegetation and erosion control have passed.Steve Robbins 08/06/2018 3:48 PM
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home