Permit Application Status

PRLD20231003


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRLD20231003
Land Disturbance Permit
Issued
David Christie - Martin City Partners
Land Disturbance
Arborwalk East - Land Disturbance Permit
03/09/2023
04/06/2023
Locations
Contacts
Tyler Wysong, Address:Kimley-Horn, Phone:(816) 652-2334  
Milhaus Development, Address:1656 Washington St., Phone:(913) 915-2700  
David Christie - Martin City Partners, Address:7217 W. 110th St., Phone:(913) 649-4500  
Garrett Fugate, Phone:(913) 649-4500  
Brian Beach, Address:JCB Tree Service, LLC, Phone:(913) 661-0195  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/05/2023 04/05/2023
Scott Ready
ESC Application and Plan Review No Comments 03/28/2023 03/31/2023
Sue Pyles, P.E.
Fees
Paid Fees Amount Paid Owing Date Paid
Land Disturbance Fee $1,000.00 $1,000.00 Paid 04/06/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Corrective Action Required
03/31/2023
3-31-23 PS Erosion control has not been installed on site
Site Visit Partial 4/3/2023 4/3/2023 04/03/2023
Misc
Corrective Action Required
03/31/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site
Site Visit Partial 4/11/2023 4/11/2023 04/11/2023
Misc
Corrective Action Required
04/03/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans
Erosion Control Inspection Partial 04/17/2023
Misc
Informational
04/17/2023
4-17-23 PS Developer has installed additional erosion control silt fence at east side of development along Ward road. Additonal erosion control is needed to protect streams, basin and storm entry at corner of 150 and ward for silt
Erosion Control Inspection Partial 4/25/2023 4/25/2023 04/25/2023
Misc
Informational
04/17/2023
4-17-23 PS Developer has installed additional erosion control silt fence at east side of development along Ward road. Additonal erosion control is needed to protect streams, basin and storm entry at corner of 150 and ward for silt 4-25-23 PS No additional erosion control has been installed on site
Site Visit Partial 4/25/2023 4/25/2023 04/25/2023
Misc
Corrective Action Required
04/11/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install
Site Visit Partial 5/1/2023 5/1/2023 05/01/2023
Misc
Corrective Action Required
04/25/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down
Site Visit Partial 5/12/2023 5/12/2023 05/12/2023
Misc
Corrective Action Required
05/01/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install
Site Visit Partial 5/31/2023 5/31/2023 05/31/2023
Misc
Corrective Action Required
05/12/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection.
Erosion Control Inspection Partial 6/19/2023 6/19/2023 06/19/2023
Misc
Informational
04/25/2023
4-17-23 PS Developer has installed additional erosion control silt fence at east side of development along Ward road. Additonal erosion control is needed to protect streams, basin and storm entry at corner of 150 and ward for silt 4-25-23 PS No additional erosion control has been installed on site 6-19-23 PS No additional erosion control has been installed on site or changes to site concerning chipping of trees removed
Site Visit Partial 6/29/2023 6/29/2023 06/29/2023
Misc
Corrective Action Required
05/31/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project
Site Visit Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Corrective Action Required
06/29/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today
Site Visit Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Corrective Action Required
07/17/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today
Site Visit Partial 7/25/2023 7/25/2023 07/25/2023
Misc
Corrective Action Required
07/21/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site
Site Visit Partial 7/26/2023 7/26/2023 07/26/2023
Misc
Corrective Action Required
07/25/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday.
Site Visit Partial 8/1/2023 8/1/2023 08/01/2023
Misc
Corrective Action Required
07/26/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today
Site Visit Partial 8/3/2023 8/3/2023 08/03/2023
Misc
Corrective Action Required
08/01/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today
Site Visit Partial 8/7/2023 8/7/2023 08/07/2023
Misc
Corrective Action Required
08/03/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site
Site Visit Partial 8/11/2023 8/11/2023 08/11/2023
Misc
Corrective Action Required
08/07/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site
Site Visit Partial 8/14/2023 8/14/2023 08/14/2023
Misc
Corrective Action Required
08/11/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site
Site Visit Partial 8/16/2023 8/16/2023 08/16/2023
Misc
Corrective Action Required
08/14/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site
Site Visit Partial 8/21/2023 8/21/2023 08/21/2023
Misc
Corrective Action Required
08/16/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site
Site Visit Partial 8/25/2023 8/25/2023 08/25/2023
Misc
Corrective Action Required
08/21/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site
Site Visit Partial 8/30/2023 8/30/2023 08/30/2023
Misc
Corrective Action Required
08/25/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site
Site Visit Partial 9/6/2023 9/6/2023 09/06/2023
Misc
Corrective Action Required
08/30/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site
Site Visit Partial 9/7/2023 9/7/2023 09/07/2023
Misc
Corrective Action Required
09/06/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet
Site Visit Partial 9/12/2023 9/12/2023 09/12/2023
Misc
Corrective Action Required
09/07/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet 9-12-23 PS Grass/weeds at perimeter of property have been mowed back meeting ordinance requirements. Crew on site loading trees for removal from various stock piles
Site Visit Partial 9/13/2023 9/13/2023 09/13/2023
Misc
Corrective Action Required
09/12/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet 9-12-23 PS Grass/weeds at perimeter of property have been mowed back meeting ordinance requirements. Crew on site loading trees for removal from various stock piles 9-13-23 PS Crew on site removing trees from stockpiles from site
Site Visit Partial 9/19/2023 9/19/2023 09/19/2023
Misc
Corrective Action Required
09/13/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet 9-12-23 PS Grass/weeds at perimeter of property have been mowed back meeting ordinance requirements. Crew on site loading trees for removal from various stock piles 9-13-23 PS Crew on site removing trees from stockpiles from site 9-19-23 PS Crew on site removing trees from stockpiles on site
Site Visit Partial 9/29/2023 9/29/2023 09/29/2023
Misc
Corrective Action Required
09/19/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet 9-12-23 PS Grass/weeds at perimeter of property have been mowed back meeting ordinance requirements. Crew on site loading trees for removal from various stock piles 9-13-23 PS Crew on site removing trees from stockpiles from site 9-19-23 PS Crew on site removing trees from stockpiles on site 9-29-23 PS No activity on site today
Site Visit Complete 01/22/2025
Misc
Corrective Action Required
09/29/2023
3-31-23 PS Erosion control has not been installed on site 4-3-23 PS Contractor has completed cutting down remaining trees on site. No update to erosion control on site 4-11-23 PS No update to erosion control on site per approved plans 4-25-23 PS No additional erosion control has been added to site since 4-17 install 5-1-23 PS Crew on site is chipping trees that have been cut down 5-12-23 PS Crew chipped some of the tree piles but not all on site. No change to erosion control on site since 4-17 install 5-31-23 PS No activity or change to site since last inspection. 6-29-23 PS Crew on site today and yesterday 6/28 removing tree piles on east side of project 7-17-23 PS No activity on site today 7-21-23 PS No activity on site today 7-25-23 PS Tree crew on site today removing tree and brush piles from site 7-26-23 PS No activity on site today. Mulch piles along corner of Ward and 150 were spread out yesterday. 8-1-23 PS No activity on site today 8-3-23 PS No activity on site today 8-7-23 PS Tree crew on site today removing tree and brush piles from site 8-11-23 PS No activity on site 8-14-23 PS No activity on site 8-16-23 PS No activity on site 8-16-23 PS No activity on site 8-25-23 PS No activity on site 8-30-23 PS No activity on site 9-6-23 PS No activity on site 9-7-23 PS 1:10 PM Erosion control contractor on site and will be installing additional erosion control at SE storm box inlet 9-12-23 PS Grass/weeds at perimeter of property have been mowed back meeting ordinance requirements. Crew on site loading trees for removal from various stock piles 9-13-23 PS Crew on site removing trees from stockpiles from site 9-19-23 PS Crew on site removing trees from stockpiles on site 9-29-23 PS No activity on site today
ESC Devices Installed Complete 4/17/2023 01/22/2025
Misc
Corrective Action Required
03/31/2023
3-31-23 PS Erosion control has not been installed on site. 4-17-23 PS Developer has installed additional erosion control silt fence at east side of development along Ward road. Additonal erosion control is needed to protect streams, basin and storm entry at corner of 150 and ward for silt
ESC - (Vegetation/Ground Cover) Passed 01/22/2025
Erosion Control Inspection Passed 01/22/2025
Misc
Informational
06/19/2023
4-17-23 PS Developer has installed additional erosion control silt fence at east side of development along Ward road. Additonal erosion control is needed to protect streams, basin and storm entry at corner of 150 and ward for silt 4-25-23 PS No additional erosion control has been installed on site 6-19-23 PS No additional erosion control has been installed on site or changes to site concerning chipping of trees removed
Documents & Images
Date Uploaded File Type Document Name
03/21/2023 Application Form Arborwalk East LD Permit App
03/21/2023 Letter MDNR Permit Arborwalk East
03/23/2023 Drawing ARBOR EAST LAND DISTURBANCE 3-21-23
03/23/2023 Drawing ARBOR EAST LAND DISTURBANCE 3-23-23
03/29/2023 Engineer Report/Study Arborwalk East SWPPP
03/31/2023 Approved Plans Arborwalk East Land Disturbance Approved 03 31 23
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/06/2023 Receipt Receipt for transaction: 2023-001915
04/06/2023 Letter DE-Permit
04/11/2023 Letter INSPECTION SUMMARY
04/17/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/12/2023 Letter INSPECTION SUMMARY
05/31/2023 Letter INSPECTION SUMMARY
06/19/2023 Letter INSPECTION SUMMARY
06/29/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
08/01/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/07/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/16/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
08/25/2023 Letter INSPECTION SUMMARY
08/30/2023 Letter INSPECTION SUMMARY
09/06/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/12/2023 Letter INSPECTION SUMMARY
09/13/2023 Letter INSPECTION SUMMARY
09/19/2023 Letter INSPECTION SUMMARY
09/29/2023 Letter INSPECTION SUMMARY
01/22/2025 Letter DS P/R Corrections Document
01/22/2025 Letter INSPECTION SUMMARY
01/22/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home