Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
04/07/2020
|
04/09/2020
|
|
Mike Weisenborn
|
|
|
ESC Application and Plan Review
|
No Comments
|
04/09/2020
|
04/09/2020
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
• Please include the following items on the cover sheet:
o Oil and gas (on-site) information note
o FEMA flood hazard information note
o Utility contact information
|
|
Miscellaneous Correction
Corrective Action Required
• Please show and label proposed contour elevations within the disturbance area.
|
|
Miscellaneous Correction
Corrective Action Required
• There is an existing underground 30” water transmission main crossing the property. Please show and label the transmission line on the plan. Also, make sure to note that “No stockpiling is allowed near the transmission main”.
|
|
Miscellaneous Correction
Corrective Action Required
• Given the vast area, additional intermediate silt fence barriers would be required to prevent mud from running over long distances within the disturbance area. Please show the locations of silt fence J-hooks as needed on the plan. Please refer to standard detail ESC-03 on page C103.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general notes, please revise “The reviewing governing agency” to “The City of Lee’s Summit” where applicable.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general note 6, please revise “per Kansas City, Missouri standard details” to “per APWA Kansas City Metro Chapter standard details”.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general note 7, please add “The City of Lee’s Summit Design and Construction manual” when referring to sections 2100 and 2201.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 3 of the SWPPP, please revise the general scope of work to match the expected work shown on the plans.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 5 of the SWPPP, please revise the construction site area to be disturbed to “3.20 acres (1st plat)” as shown on the cover sheet of the set of plans.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 6 of the SWPPP, there is an existing stream along the southern project boundary that needs to be protected. We are also aware of an existing private pond. Does this also need to be protected from silt?
|
|
Miscellaneous Correction
Corrective Action Required
• Pages 6, 9, 11, 12, 13 & 16 of the SWPPP seem to contain information that does not match the expected work on the current set of plans. Please identify, as necessary, the current (1) and future (2) work accommodations to be performed on-site.
|
|
|
ESC Application and Plan Review
|
Corrections
|
03/20/2020
|
03/18/2020
|
|
Mike Weisenborn
|
|
Miscellaneous Correction
Corrective Action Required
• Please include the following items on the cover sheet:
o Oil and gas (on-site) information note
o FEMA flood hazard information note
o Utility contact information
|
|
Miscellaneous Correction
Corrective Action Required
• Please show and label proposed contour elevations within the disturbance area.
|
|
Miscellaneous Correction
Corrective Action Required
• There is an existing underground 30” water transmission main crossing the property. Please show and label the transmission line on the plan. Also, make sure to note that “No stockpiling is allowed near the transmission main”.
|
|
Miscellaneous Correction
Corrective Action Required
• Given the vast area, additional intermediate silt fence barriers would be required to prevent mud from running over long distances within the disturbance area. Please show the locations of silt fence J-hooks as needed on the plan. Please refer to standard detail ESC-03 on page C103.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general notes, please revise “The reviewing governing agency” to “The City of Lee’s Summit” where applicable.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general note 6, please revise “per Kansas City, Missouri standard details” to “per APWA Kansas City Metro Chapter standard details”.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding general note 7, please add “The City of Lee’s Summit Design and Construction manual” when referring to sections 2100 and 2201.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 3 of the SWPPP, please revise the general scope of work to match the expected work shown on the plans.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 5 of the SWPPP, please revise the construction site area to be disturbed to “3.20 acres (1st plat)” as shown on the cover sheet of the set of plans.
|
|
Miscellaneous Correction
Corrective Action Required
• Regarding page 6 of the SWPPP, there is an existing stream along the southern project boundary that needs to be protected. We are also aware of an existing private pond. Does this also need to be protected from silt?
|
|
Miscellaneous Correction
Corrective Action Required
• Pages 6, 9, 11, 12, 13 & 16 of the SWPPP seem to contain information that does not match the expected work on the current set of plans. Please identify, as necessary, the current (1) and future (2) work accommodations to be performed on-site.
|
|
|