Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
07/21/2025
|
07/18/2025
|
|
Craig Hill
|
|
Misc
Corrective Action Required
Information Only: For alarm test call (816) 696-1300 one business day before needing the test.
|
|
|
Fire Plan Review
|
Approved
|
07/10/2025
|
07/09/2025
|
|
Craig Hill
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
Building Plan Review
|
Approved
|
07/10/2025
|
07/09/2025
|
|
Joe Frogge
|
|
IBC 1606.2 Design dead load - structural
2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units.
6/23/2025 - Report must be sealed/signed by the engineer.
|
|
Misc
Inadequate information to complete review.
Action required: Provide engineered designs for how racks are attached to floor.
6/23/2025 - Detail must be sealed/signed by the engineer.
|
|
|
Licensed Contractors
|
Approved
|
07/10/2025
|
07/09/2025
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
06/25/2025
|
06/23/2025
|
|
Joe Frogge
|
|
IBC 1606.2 Design dead load - structural
Corrective Action Required
2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units.
6/23/2025 - Report must be sealed/signed by the engineer.
|
|
Misc
Corrective Action Required
Inadequate information to complete review.
Action required: Provide engineered designs for how racks are attached to floor.
6/23/2025 - Detail must be sealed/signed by the engineer.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/25/2025
|
06/17/2025
|
|
Joe Frogge
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
Licensed Contractors
|
Approved
|
06/25/2025
|
06/17/2025
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Unable to locate license for RES Mechanical)
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
06/13/2025
|
06/02/2025
|
|
Craig Hill
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/02/2025
|
06/02/2025
|
|
Craig Hill
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
Building Plan Review
|
Rejected
|
06/02/2025
|
05/30/2025
|
|
Joe Frogge
|
|
IBC 1606.2 Design dead load - structural
Corrective Action Required
2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units.
|
|
Misc
Corrective Action Required
Inadequate information to complete review.
Action required: Provide engineered designs for how racks are attached to floor.
|
|
|
Licensed Contractors
|
Rejected
|
06/02/2025
|
05/30/2025
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Unable to locate license for RES Mechanical)
|
|
|