Permit Application Status

PRCOM20251690


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251690
Building Permit - Commercial
Issued
RED SUMMIT FAIR LLC
CHANGE OF TENANT
ANCHO AGAVE - TENANT FINISH FOR RESTAURANT - INCLUDES EXTERIOR SEATING **Invite Planner to final to inspect exterior work**
04/24/2025
05/28/2025
11/02/2025
Locations
Contacts
Unified Construction Group, Address:900 Oakmont Lane  
Noel Valenti - Unified Construction Group, Phone:(312) 301-8600  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
MAX ELECTRIC INC, Address:705 BLUE RIDGE EXT, Phone:(816) 965-7555  
Mac Wilson LLC, Address:9100 STATE ROUTE A, Phone:(816) 768-0700  
Carr Warner Architects, Address:3711 N. Ravenswood Ave, Suite 104, Phone:(773) 477-9009  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 05/21/2025 05/28/2025
Joe Frogge
Health Dept Inspection
Corrective Action Required
05/14/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 5/19/2025 - Acknowledged in letter.
Final Development Plan
Resolved
05/28/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 5/19/2025 - Acknowledged in letter.
IBC 1008.3 Emergency power for illumination - at exit discharge
Resolved
05/19/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior landing out of kitchen.
Licensed Contractors Approved 05/21/2025 05/21/2025
Joe Frogge
LC - MEP Subs
Resolved
05/21/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/19/2025 - Acknowledged in letter.
Fire Plan Review Approved 05/21/2025 05/20/2025
Craig Hill
Miscellaneous Correction
Resolved
05/20/2025

1008.3.2 Buildings. In the event of power supply failure, in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge Action required: Provide emergency lighting at exterior landing out of kitchen.
Construction documents for fire alarm systems
Resolved
05/20/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Resolved
05/20/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Health Department Review Approved 05/13/2025
Joe Frogge
Fire Plan Review Rejected 05/06/2025 05/05/2025
Craig Hill
Miscellaneous Correction
Corrective Action Required
05/05/2025

1008.3.2 Buildings. In the event of power supply failure, in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge Action required: Provide emergency lighting at exterior landing out of kitchen.
Construction documents for fire alarm systems
Corrective Action Required
05/05/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/05/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 05/06/2025 05/05/2025
Joe Frogge
Health Dept Review
Resolved
05/13/2025

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
05/05/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Final Development Plan
Corrective Action Required
05/05/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
05/05/2025

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior landing out of kitchen.
Licensed Contractors Rejected 05/06/2025 05/05/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/05/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $8,400.00 $8,400.00 Paid 05/28/2025
$27,720.00
7232302-Commercial Excise Tax Fee $13,860.00 $13,860.00 Paid 04/29/2025
$13,860.00
9110081-Paved Surface Inspection Fee $397.50 $397.50 Paid 05/28/2025
9110071-Site Grading Fee $690.00 $690.00 Paid 05/28/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Hood/Duct Inspection Pending
Alternate Protection Systems Inspection Pending
Documents & Images
Date Uploaded File Type Document Name
04/25/2025 Plans Plan Set_Rev0_PL2025087
04/25/2025 Engineer Report/Study ANCHO & AGAVE_SUMMIT FAIR_MP COMCHECK_04_25_2025
04/25/2025 Engineer Report/Study AA SUMMIT FAIR_COMcheck-Web_ELECT compliance_report_20250424_114338_570
04/29/2025 Application Form Commercial Permit Application_ANCHO AGAVE_1 pv
04/29/2025 Letter License Tax Bill
04/30/2025 Letter Health Dept approval
05/06/2025 Letter DS P/R Corrections Document
05/14/2025 Plans ANCHO AGAVE SUMMIT FAIR_PERMIT REVISION 1_FULL SET
05/14/2025 Letter ANCHO AGAVE SUMMIT FAIR_PLAN REVIEW RESPONSE LTR
05/22/2025 Approved Plans Approved construction plans
05/28/2025 Receipt Receipt for transaction:2025-003892
05/28/2025 Receipt Receipt for transaction:2025-003918
05/28/2025 Letter DS Building Permit
05/27/2025 Plans Stamped Approved FDP Plans_PL2025087
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home