Permit Application Status

PRCOM20250108


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20250108
Building Permit - Commercial
In Plan Review
TI SUMMIT CREST PLAZA LLC
CHANGE OF TENANT
ADDING MERCANTILE AREA AND CONCESSION SERVICE TO DOG GROOMING FACILITY
01/09/2025
07/21/2025
Locations
Contacts
TI SUMMIT CREST PLAZA LLC, Address:7611 STATE LINE RD STE 301  
  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
INTERSTATE ELECTRICAL CONSTRUCTION, Address:3710 ROBINSON PIKE RD, Phone:(816) 761-0200  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 01/29/2025 01/22/2025
Joe Frogge
IBC 602.1 Type of Construction - general
Resolved
01/22/2025

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify Code Notes to show correct construction type which is 5B.
Health Dept Inspection
Corrective Action Required
01/22/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 1/22/2025 - Acknowledged in letter.
IBC 2902.3 Employee and public toilet facilities - access to public toilet
Resolved
01/22/2025

2018 IBC 2902.3 Employee and public toilet facilities. For structures and tenant spaces intended for public utilization, customers, patrons and visitors shall be provided with public toilet facilities. Employees associated with structures and tenant spaces shall be provided with toilet facilities. The number of plumbing fixtures located within the required toilet facilities shall be provided in accordance with Section 2902 for all users. Employee toilet facilities shall be either separate or combined employee and public toilet facilities. Exception: Public toilet facilities shall not be required for: 1. Parking garages where operated without parking attendants. 2. Structures and tenant spaces intended for quick transactions, including takeout, pickup and drop-off, having a public access area less than or equal to 300 square feet. Action required: Each business is required to have restroom access for employees and patrons. If mercantile area is its own business it needs a dedicated restroom. Clarify. (project originally proposed as DG Energy)
IBC 1103.1 Where required - accessibility
Resolved
01/22/2025

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Room behind new counter top must be accessible or the hand washing sink needs to be relocated to an accessible area. If sink is relocated you'll need to resubmit to Jackson County Health Dept.
Licensed Contractors Rejected 01/29/2025 01/22/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
01/22/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 1/22/2025 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
01/22/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/22/2025 - Acknowledged in letter.
Fire Plan Review Approved 01/29/2025 01/22/2025
Joe Frogge
Fire Plan Review Approved 01/22/2025 01/21/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
01/21/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
01/21/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Rejected 01/22/2025 01/17/2025
Joe Frogge
IBC 602.1 Type of Construction - general
Corrective Action Required
01/17/2025

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify Code Notes to show correct construction type which is 5B.
Health Dept Inspection
Corrective Action Required
01/17/2025

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 2902.3 Employee and public toilet facilities - access to public toilet
Corrective Action Required
01/17/2025

2018 IBC 2902.3 Employee and public toilet facilities. For structures and tenant spaces intended for public utilization, customers, patrons and visitors shall be provided with public toilet facilities. Employees associated with structures and tenant spaces shall be provided with toilet facilities. The number of plumbing fixtures located within the required toilet facilities shall be provided in accordance with Section 2902 for all users. Employee toilet facilities shall be either separate or combined employee and public toilet facilities. Exception: Public toilet facilities shall not be required for: 1. Parking garages where operated without parking attendants. 2. Structures and tenant spaces intended for quick transactions, including takeout, pickup and drop-off, having a public access area less than or equal to 300 square feet. Action required: Each business is required to have restroom access for employees and patrons. If mercantile area is its own business it needs a dedicated restroom. Clarify. (project originally proposed as DG Energy)
IBC 1103.1 Where required - accessibility
Corrective Action Required
01/17/2025

2018 IBC 1103.1 Where required. Sites, buildings, structures, facilities, elements and spaces, temporary or permanent, shall be accessible to persons with physical disabilities. Action required: Room behind new counter top must be accessible or the hand washing sink needs to be relocated to an accessible area. If sink is relocated you'll need to resubmit to Jackson County Health Dept.
Licensed Contractors Rejected 01/22/2025 01/17/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
01/17/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
01/17/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
01/09/2025 Application Form APPLICATION
01/10/2025 Plans Doggy Stylz 01-09-2025
01/10/2025 Letter License Tax Bill
01/17/2025 Letter Health Dept approval
01/22/2025 Letter DS P/R Corrections Document
01/22/2025 Letter City Review Response #1
01/22/2025 Plans Doggy Stylz 01-22-2025
01/22/2025 Letter Letter from tenant
01/23/2025 Approved Plans Approved construction plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home