Review Type |
Outcome |
Est. Completion Date |
Completed |
Final Development Plan Review
|
Approved
|
04/10/2025
|
04/10/2025
|
|
Grant White
|
|
|
Building Plan Review
|
Rejected
|
03/12/2025
|
03/11/2025
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Miscellaneous Correction
Corrective Action Required
FAA approval required.
Action required: Provide verification of FAA 7460 approval.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
IBC 1209.2 Finish materials
Corrective Action Required
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Specify compliant wall finish materials at mop sink and at Line Restroom 111. If paint is used it must be epoxy based.
1/15/2025 - Note added to finish schedule. To be field verified.
|
|
IBC 1809.5 Frost protection - foundation
Corrective Action Required
2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods:
1. Extending below the frost line of the locality;
2. Constructing in accordance with ASCE 32; or
3. Erecting on solid rock.
(see code section for exceptions)
Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character.
Action required: Comment is informational. At inspections, a minimum foundation depth of 36" will be verified.
|
|
IBC 1704.2 Special Inspections
Corrective Action Required
2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions)
Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
|
|
|
Fire Plan Review
|
Approved
|
01/17/2025
|
01/16/2025
|
|
Craig Hill
|
|
|
Building Plan Review
|
Rejected
|
01/17/2025
|
01/15/2025
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Miscellaneous Correction
Corrective Action Required
FAA approval required.
Action required: Provide verification of FAA 7460 approval.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
1/15/2025 - Acknowledged in letter.
|
|
Miscellaneous Correction
Inadequate information to complete review.
Provide the following:
- Complete light pole base detail. (detail on ME003 is incomplete)
|
|
IBC 1209.2 Finish materials
Corrective Action Required
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Specify compliant wall finish materials at mop sink and at Line Restroom 111. If paint is used it must be epoxy based.
1/15/2025 - Note added to finish schedule. To be field verified.
|
|
NEC Article 110.26 (C)(2) Large equipment
2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space.
A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met.
(a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted.
(b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition.
110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic device at door 105.1 out of room MEP 105.
|
|
NEC Article 250.66 Size of AC Grounding electrode conductor
2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C).
Action required: Provide sizes for all grounding electrode conductors.
|
|
|
Licensed Contractors
|
Rejected
|
01/17/2025
|
01/15/2025
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
1/15/2025 - Acknowledged in letter.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
1/15/2025 - Acknowledged in letter.
|
|
|
Fire Plan Review
|
Rejected
|
12/18/2024
|
12/17/2024
|
|
Craig Hill
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for alarm system.
|
|
Knox box required
Corrective Action Required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Action Required: Provide a Knox Box above FDC
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for protection system.
|
|
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Action Required: Provide elivator Knox Box neer the elevator.
|
|
Illumination required
Corrective Action Required
Provide emergency lighting in rooms 131, 132, and 133.
|
|
|
Building Plan Review
|
Rejected
|
12/18/2024
|
12/16/2024
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
|
|
Miscellaneous Correction
Corrective Action Required
FAA approval required.
Action required: Provide verification of FAA 7460 approval.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
|
|
Miscellaneous Correction
Corrective Action Required
Inadequate information to complete review.
Provide the following:
- Complete light pole base detail. (detail on ME003 is incomplete)
|
|
IBC 1209.2 Finish materials
Corrective Action Required
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Specify compliant wall finish materials at mop sink and at Line Restroom 111. If paint is used it must be epoxy based.
|
|
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space.
A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met.
(a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted.
(b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition.
110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic device at door 105.1 out of room MEP 105.
|
|
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C).
Action required: Provide sizes for all grounding electrode conductors.
|
|
|
Licensed Contractors
|
Rejected
|
12/18/2024
|
12/13/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Alarm Plan Review
|
Pending
|
|
|
|
Craig Hill
|
|
|
Sprinkler Plan Review
|
Pending
|
|
|
|
Craig Hill
|
|
|
Special Inspections Review
|
Pending
|
|
|
|
Joe Frogge
|
|
|