Permit Application Status

PRCOM20236522


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20236522
Building Permit - Commercial
Certificate of Occupancy
CHICK FIL A INC
ALTERATION COMMERCIAL
CHICK-FIL-A - ALTERING EXISTING RESTAURANT WITH DUAL LANE AND CANOPIES - INCLUDES INTERIOR ALTERATIONS TO REPLACE PLAY AREA WITH DINING **This permit was completed as phase 1 only. Phase 2 will require a new submission.
12/14/2023
06/21/2024
09/04/2024
09/05/2024
Locations
Contacts
CHICK FIL A INC, Address:5200 BUFFINGTON RD  
DIAMOND CONTRACTORS INC, Address:4224 NE PORT DR, Phone:(816) 650-9200  
Mike Parker - Diamond Contractors, Phone:(816) 868-2429  
INTERPLAN LLC, Address:604 COURTLAND STREET, Phone:(407) 645-5008  
PRECISION LIGHTING & ELECTRIC, Address:P O BOX 167, Phone:(402) 332-4275  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
  
RICHARDS CONSTRUCTION COMPANY INC, Address:P O BOX 1904, Phone:(816) 224-4100  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 03/15/2024 03/18/2024
Jim Eden
MISC
Corrective Action Required
03/08/2024

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Verified during construction.
Building Plan Review Approved 03/15/2024 03/08/2024
Joe Frogge
Final Development Plan
Corrective Action Required
03/08/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Licensed Contractors Rejected 03/15/2024 03/08/2024
Joe Frogge
LC - General Contractor
Resolved
05/24/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
03/08/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 12/28/2023 03/08/2024
Joe Frogge
Final Development Plan
Corrective Action Required
12/22/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Final Development Plan Review Approved 01/25/2024 01/25/2024
Scott Ready
Chick-fil-A parking lot expansion
Fire Plan Review Approved with Conditions 12/28/2023 12/28/2023
Jim Eden
MISC
Corrective Action Required
12/28/2023

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Verified during construction.
Licensed Contractors Rejected 12/28/2023 12/22/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
12/22/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
12/22/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $1,500.00 $1,500.00 Paid 06/14/2024
Water Insp Fee $75.00 $75.00 Paid 06/14/2024
Storm Sewer Inspection Fee $232.50 $232.50 Paid 06/14/2024
Paved Surface Inspection Fee $4,175.49 $4,175.49 Paid 06/14/2024
Site Grading Fee $3,283.78 $3,283.78 Paid 06/14/2024
Right of Way Permit Fee $85.00 $85.00 Paid 06/14/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Above Ceiling Inspection Partial 7/2/2024 07/02/2024
Misc
Informational
07/02/2024
Dining C approved
Occupancy Inspection - Codes Commercial Failed 7/12/2024 7/12/2024 07/12/2024
Misc
Informational
07/12/2024
Partial inspection only *OK to use new dining area
Occupancy Inspection - Fire Failed 7/12/2024 7/12/2024 07/12/2024
Piers/Caissons Inspection - Commercial Failed 07/22/2024
Misc
Corrective Action Required
07/22/2024
-Provide 3rd party inspection report for piers next ot building -Suspend cages min 3" from earth
Piers/Caissons Inspection - Commercial Partial 7/29/2024 07/22/2024
Misc
Corrective Action Required
07/22/2024
-Provide 3rd party inspection report for piers next ot building
Underground Plumbing Inspection - Commercial Partial 7/26/2024 7/26/2024 07/26/2024
Miscellaneous Correction
Corrective Action Required
07/26/2024
Canopy drains approved
Underground Electrical Inspection - Commercial Failed 7/26/2024 7/26/2024 07/26/2024
Miscellaneous Correction
Corrective Action Required
07/26/2024
Uncover underground conduit to light poles
Piers/Caissons Inspection - Commercial Failed 07/26/2024
Misc
Corrective Action Required
07/26/2024
Provide pier detail for inspection -Ground rod and conductor not installed
Underground Electrical Inspection - Commercial Partial 7/29/2024 07/29/2024
Miscellaneous Correction
Informational
07/29/2024
Conduit from light pole bases to building approved (1) at monument sign, (1) at NE of canopy
Piers/Caissons Inspection - Commercial Partial 7/29/2024 7/29/2024 07/29/2024
Misc
Corrective Action Required
07/22/2024
-Provide 3rd party inspection report for piers next to building -Canopy piers in drive approved -(2) light pole bases approved (one at NE drive & one by monument sign
ESC - (Vegetation/Ground Cover) Passed 09/04/2024
Misc
Informational
09/04/2024
09/04/24 JMJ Passed.
Erosion Control Inspection Passed 9/4/2024 9/4/2024 09/04/2024
Misc
Informational
09/04/2024
09/04/24 JMJ Passed.
Occupancy Inspection - Planning Temporary C of O 9/5/2024 09/05/2024
Corrective Action Required
09/05/2024
PHASED APPROVAL. The canopy addition and construction of the dual lanes is completed per plan. Waiting on completion of the Phase 2 landscape island improvements to close out the permit.
Above Ceiling Inspection Passed 09/05/2024
Footing Inspection - Commercial Passed 7/22/2024 09/05/2024
Piers/Caissons Inspection - Commercial Passed 09/05/2024
Misc
Resolved
09/05/2024
Provide pier detail for inspection -Ground rod and conductor not installed
Underground Plumbing Inspection - Commercial Passed 09/05/2024
Miscellaneous Correction
Resolved
09/05/2024
Canopy drains approved
Occupancy Inspection - Codes Commercial Full C of O 9/5/2024 9/5/2024 09/05/2024
Misc
Resolved
09/05/2024
Partial inspection only *OK to use new dining area
Occupancy Inspection - Fire Passed 9/5/2024 9/5/2024 09/05/2024
Documents & Images
Date Uploaded File Type Document Name
12/14/2023 Application Form APPLICATION
12/14/2023 Engineer Report/Study 2023_0467 COM-check
12/14/2023 Plans 230467 CFA CPS 2859 SUMMIT FAIR, MO
03/08/2024 Plans CFA CPS 02859 Summit Fair Lees Summit MO
03/08/2024 Letter Revision Narrative
03/18/2024 Approved Plans approved - CFA CPS 02859 Summit Fair Lees Summit MO
06/13/2024 Approved Plans Chick-fil-A_Approved Revised FDP Plan Set_PL2023321_06132024
06/14/2024 Receipt Receipt for transaction:2024-004761
06/21/2024 Letter DS Building Permit
07/02/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter Fire Building Plan Review
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/26/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
08/02/2024 3RD Party Insp Report Third-Party-Inspection-Report - CFA Lee's Summit
08/13/2024 Plans _CFA CPS 2859 Summit Fair
08/13/2024 Letter CFA 02859 Revisions Memo 2024-7-17
08/14/2024 Drawing 90-2859-F2FC-4-CANOPY SECTIONS
08/14/2024 Drawing 91-2859-OMD-10-CANOPY LIGHT LAYOUT
08/19/2024 Approved Plans Approved revisions
09/04/2024 Letter INSPECTION SUMMARY
09/04/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter INSPECTION SUMMARY
09/05/2024 Letter Codes Final Certificate of Occupancy
09/05/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home