Permit Application Status

PRCOM20232824


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232824
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
CHANGE OF TENANT
CHANGE OF TENANT FOR A NEW RETAIL SPACE
06/16/2023
07/13/2023
12/23/2023
10/06/2023
Locations
Contacts
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE, Phone:(913) 649-8181  
United Heating & Cooling, Address:301 Duck Rd, Phone:(816) 761-5262  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
Mike Leardi, Address:344 CAPITAL DR NW, Phone:(816) 564-3918  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 10/02/2023 10/02/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
10/02/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 9/18/2023.
Installation acceptance testing
Corrective Action Required
10/02/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Visual inspection to be completed at occupancy inspection.
Licensed Contractors Approved 07/11/2023 07/12/2023
Joe Frogge
LC - General Contractor
Resolved
07/12/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 7/6/23 - acknowledged in letter
LC - MEP Subs
Resolved
07/12/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/6/23 - acknowledged in letter
Building Plan Review Approved 07/11/2023 07/06/2023
Joe Frogge
IBC 1209.2 Finish materials
Resolved
07/06/2023

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at toilets and mop sink. If paint is used it must be epoxy based. 7/6/23 - per architect there is existing FRP
Fire Plan Review Approved with Conditions 07/11/2023 07/06/2023
Joe Frogge
Construction documents - Fire protection systems
Corrective Action Required
07/03/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for sprinkler modifications.
Portable fire extinguishers - general
Corrective Action Required
07/03/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Construction documents for fire alarm systems
Corrective Action Required
07/03/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for alarm modifications.
Fire Plan Review Approved with Conditions 06/28/2023 06/26/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/26/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for sprinkler modifications.
Portable fire extinguishers - general
Corrective Action Required
06/26/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Construction documents for fire alarm systems
Corrective Action Required
06/26/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for alarm modifications.
Building Plan Review Rejected 06/28/2023 06/23/2023
Joe Frogge
IBC 1209.2 Finish materials
Corrective Action Required
06/23/2023

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at toilets and mop sink. If paint is used it must be epoxy based.
Licensed Contractors Rejected 06/28/2023 06/23/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
06/23/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/23/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $1,000.00 $1,000.00 Paid 07/12/2023
$22,687.50
7232302-Commercial License Tax Fee $11,343.75 $11,343.75 Paid 06/16/2023
$11,343.75
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 8/9/2023 8/9/2023 08/09/2023
Above Ceiling Inspection Passed 8/22/2023 8/22/2023 08/22/2023
Underslab Electrical Inspection - Commercial Passed 8/22/2023 8/22/2023 08/22/2023
Alarm Test Passed 10/3/2023 10/03/2023
Occupancy Inspection - Codes Commercial Failed 10/4/2023 10/4/2023 10/04/2023
Misc
Corrective Action Required
10/04/2023
-Complete corrections for LSFD -Label electrical panel -Tighten loose receptacle at north wall -Move grab bars in restrooms to be code compliant -Missing escutcheon near south windows -Complete hvac in hallway
Occupancy Inspection - Codes Commercial Failed 10/04/2023
Misc
Corrective Action Required
10/04/2023
-Complete corrections for LSFD -Label electrical panel -Tighten loose receptacle at north wall -Move grab bars in restrooms to be code compliant -Missing escutcheon near south windows -Complete hvac in hallway **OK TO STOCK AND TRAIN ONLY-DO NOT OCCUPY
Occupancy Inspection - Codes Commercial Full C of O 10/6/2023 10/6/2023 10/06/2023
Misc
Resolved
10/06/2023
-Complete corrections for LSFD -Label electrical panel -Tighten loose receptacle at north wall -Move grab bars in restrooms to be code compliant -Missing escutcheon near south windows -Complete hvac in hallway **OK TO STOCK AND TRAIN ONLY-DO NOT OCCUPY
Occupancy Inspection - Fire Passed 10/6/2023 10/6/2023 10/06/2023
Documents & Images
Date Uploaded File Type Document Name
06/16/2023 Application Form APPLICATION
06/16/2023 Plans Summit Fair Lululemon - Permit 23-0616
06/16/2023 Letter License Tax Bill
06/26/2023 Letter DS P/R Corrections Document
07/03/2023 Letter 23-0627 City Response Letter
07/03/2023 Plans Summit Fair Lululemon - Permit REV 1 23-0630
07/06/2023 Approved Plans approved - Summit Fair Lululemon - Permit REV 1 23-0630
07/12/2023 Receipt Receipt for transaction:2023-005406
07/13/2023 Letter DS Building Permit
08/09/2023 Letter INSPECTION SUMMARY
08/22/2023 Letter INSPECTION SUMMARY
09/18/2023 Drawing FP 1 LULULEMON-
10/02/2023 FP 1 LULULEMON- APPROVED
10/02/2023 Letter Fire (Sprinkler) Plan Review
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/04/2023 Letter INSPECTION SUMMARY
10/06/2023 Letter Codes Final Certificate of Occupancy
10/06/2023 Letter Field Certificate of Occupancy
10/06/2023 Letter Fire Building Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home