Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved with Conditions
|
06/26/2023
|
06/26/2023
|
|
Joe Frogge
|
|
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception)
Action required: Complete design at new sink and counter in Lobby. Must be fully accessible. Specify/design plumbing system.
6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
|
|
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Provide verification that at least 36" length of new service counter will be maximum 36" high.
6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/26/2023
|
06/25/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modification to the sprinkler system.
|
|
Miscellaneous Correction
Corrective Action Required
Provide details/information on the rack storage.
6/25/2023- How high will the storage be and what is the commodity type?
|
|
Miscellaneous Correction
Provide MEP drawings.
|
|
Portable fire extinguishers - general
Corrective Action Required
2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for modification to the alarm system.
|
|
|
Licensed Contractors
|
Approved
|
06/26/2023
|
06/20/2023
|
|
Joe Frogge
|
|
|
Licensed Contractors
|
Approved
|
|
06/15/2023
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Rejected
|
06/13/2023
|
06/15/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modification to the sprinkler system.
|
|
Miscellaneous Correction
Corrective Action Required
Provide details/information on the rack storage.
|
|
Miscellaneous Correction
Corrective Action Required
Provide MEP drawings.
|
|
Portable fire extinguishers - general
Corrective Action Required
2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for modification to the alarm system.
|
|
|
Building Plan Review
|
Rejected
|
06/13/2023
|
06/13/2023
|
|
Joe Frogge
|
|
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception)
Action required: Complete design at new sink and counter in Lobby. Must be fully accessible. Specify/design plumbing system.
|
|
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed.
Action required: Provide verification that at least 36" length of new service counter will be maximum 36" high.
6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
|
|
|
Zoning Review
|
Approved
|
06/09/2023
|
06/08/2023
|
|
Joe Frogge
|
|
verbal approval from Planning
|