Permit Application Status

PRCOM20232458


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232458
Building Permit - Commercial
Certificate of Occupancy
LBP IV LLC
CHANGE OF TENANT
WAREHOUSE TO STORE ELECTRICAL WIRES, PANELS, AND LIGHTS. OFFICE SPACE AND BUSINESS. MERCANTILE SPACE FOR SHOW ROOM
05/30/2023
07/18/2023
12/12/2023
09/18/2023
Locations
Contacts
LBP IV LLC, Address:3170 NE CARNEGIE DR STE 400  
ARC GENERAL CONTRACTING, Address:7833 BARTON ST, Phone:(913) 492-8008  
Leonard Piontkowski, Address:7833 Barton Street, Phone:(602) 314-2107  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
bc Design Group, Address:12101 W 110th St. Suite 100, Phone:(913) 232-2123  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 06/26/2023 06/26/2023
Joe Frogge
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
06/19/2023

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Complete design at new sink and counter in Lobby. Must be fully accessible. Specify/design plumbing system. 6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
06/19/2023

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Provide verification that at least 36" length of new service counter will be maximum 36" high. 6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
Fire Plan Review Approved with Conditions 06/26/2023 06/25/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/19/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modification to the sprinkler system.
Miscellaneous Correction
Corrective Action Required
06/19/2023

Provide details/information on the rack storage. 6/25/2023- How high will the storage be and what is the commodity type?
Miscellaneous Correction
Resolved
06/25/2023

Provide MEP drawings.
Portable fire extinguishers - general
Corrective Action Required
06/19/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Construction documents for fire alarm systems
Corrective Action Required
06/19/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for modification to the alarm system.
Licensed Contractors Approved 06/26/2023 06/20/2023
Joe Frogge
Licensed Contractors Approved 06/15/2023
Joe Frogge
LC - General Contractor
Resolved
06/15/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
06/15/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 06/13/2023 06/15/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/15/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modification to the sprinkler system.
Miscellaneous Correction
Corrective Action Required
06/15/2023

Provide details/information on the rack storage.
Miscellaneous Correction
Corrective Action Required
06/15/2023

Provide MEP drawings.
Portable fire extinguishers - general
Corrective Action Required
06/15/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Construction documents for fire alarm systems
Corrective Action Required
06/15/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for modification to the alarm system.
Building Plan Review Rejected 06/13/2023 06/13/2023
Joe Frogge
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
06/13/2023

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Complete design at new sink and counter in Lobby. Must be fully accessible. Specify/design plumbing system.
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
06/13/2023

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Provide verification that at least 36" length of new service counter will be maximum 36" high. 6/16/23 - shop drawings difficult to discern but verified by architect in email as compliant. To be field verified.
Zoning Review Approved 06/09/2023 06/08/2023
Joe Frogge
verbal approval from Planning
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $500.00 $500.00 Paid 07/18/2023
7232302-Industrial/Warehouse License Tax Fee $3,146.00 $3,146.00 Paid 06/26/2023
$3,146.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 7/26/2023 07/26/2023
MISC
Corrective Action Required
07/26/2023
WALLS ALREADY COVERED. REMOVE SHEETROCK FOR INSPECTION
Underslab Plumbing Inspection - Commercial Passed 7/26/2023 07/26/2023
Informational
07/26/2023
SUBMIT CHANGE TO SINK LOCATION TO CITY
In-wall Inspection Passed 7/31/2023 7/31/2023 07/31/2023
MISC
Resolved
07/31/2023
WALLS ALREADY COVERED. REMOVE SHEETROCK FOR INSPECTION
Above Ceiling Inspection Failed 8/11/2023 8/11/2023 08/11/2023
Misc
Corrective Action Required
08/11/2023
-Support PVC plumbing at max 10 ft vertical -Support electrical box per code; support MC to independent support wire, color tag, and secure support wire at bottom end. Use listed support clips for MC support -Color/ ID all support wires for MC -Do not use ceiling grid support wire to support MC -Support low voltage cables off ceiling grid in a nice&workmanlike manner
Above Ceiling Inspection Passed 8/18/2023 08/18/2023
Misc
Resolved
08/18/2023
-Support PVC plumbing at max 10 ft vertical -Support electrical box per code; support MC to independent support wire, color tag, and secure support wire at bottom end. Use listed support clips for MC support -Color/ ID all support wires for MC -Do not use ceiling grid support wire to support MC -Support low voltage cables off ceiling grid in a nice&workmanlike manner
Alarm Test Passed 8/25/2023 08/25/2023
Occupancy Inspection - Codes Commercial Failed 8/29/2023 8/29/2023 08/29/2023
Misc
Corrective Action Required
08/29/2023
-Fire approval required -Receptacle located within six ft of sink must be gfci-protected -Provide knee protection under sink -Provide backflow preventer for ice maker -Provide ADA compliant sale counter -Submit to city plan review egress through the electrical room but walls not demoed. Revised plan to include the relocation of plumbing fixture to break room wall
Occupancy Inspection - Fire Failed 8/29/2023 8/29/2023 08/29/2023
Occupancy Inspection - Codes Commercial Full C of O 9/18/2023 9/18/2023 09/18/2023
Misc
Resolved
09/18/2023
-Fire approval required
Documents & Images
Date Uploaded File Type Document Name
05/30/2023 Application Form ElliotLeesummitpermitapp
05/31/2023 Plans 2309_2 Elliot Electric Lee Summit_Permit Set Revised_05_26_2023
06/06/2023 Plans 2023_06_05 Elliot Electric MEP Permit
06/13/2023 Letter License Tax Bill
06/15/2023 Letter DS P/R Corrections Document
06/16/2023 Email P.O.S. height clarification
06/19/2023 Plans 2309_2 Elliot Electric Lee's Summit_PRCOM20232458_ADD1 06_19_2023
06/27/2023 Approved Plans approved elliot elec plans
07/18/2023 Receipt Receipt for transaction: 2023-005538
07/18/2023 Letter DS Building Permit
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/29/2023 Letter INSPECTION SUMMARY
09/05/2023 Approved Plans approved - 2309.2 Elliot Electric LS_Revised 09.05.2023
09/18/2023 Letter Field Certificate of Occupancy
09/18/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home