Permit Application Status

PRCOM20232254


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20232254
Building Permit - Commercial
Certificate of Occupancy
GALE COMMUNITIES INC
CHANGE OF TENANT
TENANT FINISH FOR WINE THEMED LIQUOR STORE
05/19/2023
07/19/2023
12/10/2023
10/19/2023
Locations
Contacts
GALE COMMUNITIES INC, Address:400 SW LONGVIEW BLVD STE 105  
MID-AMERICA CONTRACTORS INC, Address:1400 IRON, Phone:(816) 221-4516  
CLOCKWORK, Address:423 DELAWARE STREET #102, Phone:(816) 807-3787  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
ELECTRICAL CORP OF AMERICA, Address:7320 ARLINGTON, Phone:(816) 737-3206  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
Nick@MACBuildsKC.com, Address:Nick@MACBuildsKC.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 06/30/2023 06/30/2023
Jim Eden
Miscellaneous Correction
Resolved
06/30/2023

Provide a scope of work,intended use, floor plans, MEP's, and updated code analysis. The information provided is insufficient to complete a review.
Construction documents - Fire protection systems
Corrective Action Required
06/30/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modifications to the existing sprinkler system. Submit plans to devservices.cityofls.net
Portable fire extinguishers - general
Corrective Action Required
06/30/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Verified at inspection.
Misc
Corrective Action Required
06/30/2023

All existing conditions subject to inspection and correction to meet requirements for the change in use.
Construction documents for fire alarm systems
Corrective Action Required
06/30/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide plans for modications to notification appliances.
Building Plan Review Approved 06/30/2023 06/23/2023
Joe Frogge
IBC 1004.1 Design occupant load
Resolved
06/23/2023

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Provided detailed breakdown of each area and assign occupant loads per table 1004.5.
Misc
Resolved
06/23/2023

Inadequate information to complete review. Action required: Provide complete MEP designs or detailed scopes of work per trade.
IPC 403.1 Minimum number of fixtures
Resolved
06/23/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountains or approved equivalent.
Misc
Resolved
06/23/2023

To avoid confusion, remove historic code analysis.
Licensed Contractors Approved 06/23/2023 06/23/2023
Joe Frogge
LC - General Contractor
Resolved
06/23/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
06/23/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 06/12/2023 06/12/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
06/12/2023

Provide a scope of work,intended use, floor plans, MEP's, and updated code analysis. The information provided is insufficient to complete a review.
Building Plan Review Rejected 06/12/2023 06/11/2023
Joe Frogge
IBC 1004.1 Design occupant load
Corrective Action Required
06/11/2023

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Provided detailed breakdown of each area and assign occupant loads per table 1004.5.
Misc
Corrective Action Required
06/11/2023

Inadequate information to complete review. Action required: Provide complete MEP designs or detailed scopes of work per trade.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
06/11/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountains or approved equivalent.
Misc
Corrective Action Required
06/11/2023

To avoid confusion, remove historic code analysis.
Licensed Contractors Rejected 06/11/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
06/11/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/11/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Zoning Review Approved 06/01/2023 05/31/2023
Joe Frogge
see email from Shannon
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $200.00 $200.00 Paid 07/07/2023
$19,552.50
7232302-Commercial License Tax Fee $9,776.25 $9,776.25 Paid 05/31/2023
$9,776.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Failed 9/13/2023 9/13/2023 09/13/2023
Misc
Corrective Action Required
09/13/2023
- functional back exit - exit lighting at front entrance to function at time of power outage
Occupancy Inspection - Fire Failed 9/13/2023 9/13/2023 10/04/2023
In-wall Inspection Passed 10/19/2023
Above Ceiling Inspection Passed 10/19/2023 10/19/2023
Occupancy Inspection - Fire Passed 10/19/2023 10/19/2023 10/19/2023
Occupancy Inspection - Codes Commercial Full C of O 10/19/2023 10/19/2023 10/19/2023
Misc
Resolved
10/19/2023
Documents & Images
Date Uploaded File Type Document Name
05/19/2023 Application Form APPLICATION
05/31/2023 Plans 20230531 NLV - Ste 190 - TI
05/31/2023 Application Form NLV - Ste 190 - Commercial Permit Application
05/31/2023 Email planning approval
05/31/2023 Email LT info
05/31/2023 Letter License Tax Bill
06/13/2023 Letter DS P/R Corrections Document
06/23/2023 Plans 20230623 NLV - Ste 190 - TI - Permit Response
06/23/2023 Letter DS P_R Corrections Document - response letter
06/23/2023 Letter Contractor List
07/03/2023 Approved Plans approved - 20230623 NLV - Ste 190 - TI - Permit Response
07/07/2023 Receipt Receipt for transaction:2023-005245
07/20/2023 Letter DS Building Permit
09/13/2023 Letter INSPECTION SUMMARY
10/19/2023 Letter INSPECTION SUMMARY
10/19/2023 Letter INSPECTION SUMMARY
10/19/2023 Letter Codes Final Certificate of Occupancy
10/19/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home