Summary
PRCOM20224909
Building Permit - Commercial
Certificate of Occupancy
NEW COMMERCIAL
NEW 6 BAY STORAGE BUILDING
10/03/2022
06/21/2023
12/10/2023
08/22/2024
Locations
Contacts
PELLA BUILDING SYSTEMS INCORPORATED, Address:906 W 9TH ST, Phone:(641) 628-9300  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
KHENTER@MEGASTORAGEUSA.COM  
FAITH TECHNOLOGIES INC, Address:P O BOX 260, Phone:(920) 225-6500  
KISSICK CONSTRUCTION CO, Address:8131 INDIANA, Phone:(816) 363-5530  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 06/12/2023 06/16/2023
Joe Frogge
IBC 1809.5 Frost protection - foundation
Resolved
06/16/2023

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation plans to show that all footings will be at least 36" deep. 11/15/22 - Footing details do not meet ASCE 32 requirements. Provide minimum 36" deep footings or provide a detail showing exactly how the requirements of ASCE will be met. 4/5/23 - PSI letter explains use of ASCE 32. Update and resubmit foundation plans to match. They need to show insulation type/thickness/r-value, flashing, etc. 6/11/23 - drawing D1 does not provide information requested. Also during my research I see that ASCE 32 doesn not apply to areas with "mean annual outdoor air temperatures less than 32degF. Provide verification that this still applies as we don't have access to that information. 6/16/23 - approved based on engineering data provided
Fire Plan Review Approved with Conditions 06/12/2023 06/12/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
06/05/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a 2A:10B:C fire extinguisher in each unit. Verified at inspection.
Licensed Contractors Approved 06/12/2023 06/11/2023
Joe Frogge
Building Plan Review Rejected 04/05/2023 04/05/2023
Joe Frogge
IBC 1809.5 Frost protection - foundation
Corrective Action Required
03/29/2023

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation plans to show that all footings will be at least 36" deep. 11/15/22 - Footing details do not meet ASCE 32 requirements. Provide minimum 36" deep footings or provide a detail showing exactly how the requirements of ASCE will be met. 4/5/23 - PSI letter explains use of ASCE 32. Update and resubmit foundation plans to match. They need to show insulation type/thickness/r-value, flashing, etc.
Fire Plan Review Approved with Conditions 04/05/2023 04/04/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
03/29/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a 2A:10B:C fire extinguisher in each unit. Verified at inspection.
Licensed Contractors Approved 04/05/2023 03/29/2023
Joe Frogge
Fire Plan Review Approved with Conditions 11/22/2022 11/22/2022
Ben Hicks
Address numbers required
Resolved
11/22/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action Required- Show address on buildings per IFC 2018
Portable fire extinguishers - general
Corrective Action Required
11/15/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action Required- Show locations of fire extinguishers
Portable fire extinguishers - conspicuous locations
Resolved
11/22/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action Required- Show locations of Fire extinguishers to meet requirements IFC 2018
Misc
Resolved
11/22/2022

Action Required- Complete and have be approved Final development plan
Final Development Plan Review Approved 12/02/2022 11/22/2022
Mike Weisenborn
Building Plan Review Rejected 11/22/2022 11/15/2022
Joe Frogge
Final Development Plan
Resolved
11/22/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 11/15/22 - acknowledged in letter
IBC 1809.5 Frost protection - foundation
Corrective Action Required
11/15/2022

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation plans to show that all footings will be at least 36" deep. 11/15/22 - Footing details do not meet ASCE 32 requirements. Provide minimum 36" deep footings or provide a detail showing exactly how the requirements of ASCE will be met.
Licensed Contractors Approved 11/15/2022 11/15/2022
Joe Frogge
Fire Plan Review Rejected 10/17/2022 10/18/2022
Ben Hicks
Address numbers required
Corrective Action Required
10/18/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action Required- Show address on buildings per IFC 2018
Portable fire extinguishers - general
Corrective Action Required
10/18/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action Required- Show locations of fire extinguishers
Portable fire extinguishers - conspicuous locations
Corrective Action Required
10/18/2022

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action Required- Show locations of Fire extinguishers to meet requirements IFC 2018
Misc
Corrective Action Required
10/18/2022

Action Required- Complete and have be approved Final development plan
Building Plan Review Rejected 10/17/2022 10/11/2022
Joe Frogge
Final Development Plan
Corrective Action Required
10/11/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1809.5 Frost protection - foundation
Corrective Action Required
10/11/2022

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify foundation plans to show that all footings will be at least 36" deep.
Licensed Contractors Approved 10/17/2022 10/05/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $565.25 $565.25 Paid 06/19/2023
7232302-Industrial/Warehouse License Tax Fee $935.00 $935.00 Paid 06/19/2023
9110068-Storm Fee $1,822.05 $1,822.05 Paid 06/19/2023
9110081-Paved Surface Inspection Fee $13,993.62 $13,993.62 Paid 06/19/2023
91100C9-Water Insp Fee $200.25 $200.25 Paid 06/19/2023
9110071-Site Grading Fee $116.10 $116.10 Paid 06/19/2023
9110072-Water Test Fee $200.00 $200.00 Paid 06/19/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/10/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 7/17/2023 07/17/2023
Misc
Informational
07/17/2023
7-17-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/24/2023 07/25/2023
Misc
Informational
07/17/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/31/2023 07/31/2023
Misc
Informational
07/25/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues
Fire Line Construction Inspection Partial 08/29/2023
Misc
Informational
08/29/2023
Site visited to look at fire line that is connected to the building and the crews refused to pour a concrete kicker block and after a while they poured it and sent pictures.
Erosion Control Inspection Partial 9/1/2023 09/01/2023
Misc
Informational
07/31/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues
Footing Inspection - Commercial Partial 09/07/2023
Misc
Corrective Action Required
09/07/2023
Footing ok to pour except the NE corner for vehicle entrance
Footing Inspection - Commercial Passed 9/8/2023 9/8/2023 09/08/2023
Misc
Resolved
09/08/2023
Footing ok to pour except the NE corner for vehicle entrance
Underslab Electrical Inspection - Commercial Passed 9/20/2023 9/20/2023 09/20/2023
Water Service Inspection Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears water has passed
Grading/Excavation/Fill Inspection Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work is done.
Water Line - Construction Inspection Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears water has passed
Pavement-Proof Roll Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears it done.
Pavement-Surface Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Install Street and Stop Signs Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Aggregate Base Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has been completed 4-30-24 NS Site visited and it appears that some of the concrete is being replaced.
Pavement-Curb Construction Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has been done.
Pavement-Stabilized Subgrade Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work is done
Storm Sewer Construction Inspection Passed 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears sewer has passed
ESC - (Vegetation/Ground Cover) Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears eco is in good working order
Erosion Control Inspection Partial 12/4/2023 12/04/2023
Misc
Informational
09/01/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues
Erosion Control Inspection Partial 12/18/2023 12/18/2023
Misc
Informational
12/04/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/20/2023 12/20/2023
Misc
Informational
12/18/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/22/2023 12/22/2023
Misc
Informational
12/20/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/28/2023 12/28/2023
Misc
Informational
12/22/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/2/2024 01/02/2024
Misc
Informational
12/28/2023
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/23/2024 01/23/2024
Misc
Informational
01/02/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues
Rough Framing Inspection - Commercial Passed 2/27/2024 2/27/2024 02/27/2024
Rough Electrical Inspection - Commercial Passed 2/27/2024 2/27/2024 02/27/2024
Erosion Control Inspection Partial 2/28/2024 02/28/2024
Misc
Informational
01/23/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues
Fire Line Construction Inspection Passed 03/04/2024
Misc
Informational
08/29/2023
Site visited to look at fire line that is connected to the building and the crews refused to pour a concrete kicker block and after a while they poured it and sent pictures.
Water Line - Hydrostatic Test Passed 03/04/2024
Misc
Informational
03/04/2024
Passed Hydrostatic
Occupancy Inspection - Engineering Temporary C of O 3/4/2024 3/4/2024 03/04/2024
Misc
Informational
03/04/2024
3-4-24 Temporary Occupancy Approved Punchlist: Due 4-4-24 1) Vegetation or Decorative rock between units 2)Concrete replace where broken out due to electric 3) Cleanup Site (Trash, Debris, Trash Dumpster)
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/4/2024 3/4/2024 03/04/2024
MISC
Corrective Action Required
03/04/2024
-APPROVAL REQUIRED FROM: FEI, PLANNING -PROVIDE COMPLIANCE WITH NEC 225.30&31
Occupancy Inspection - Fire Passed 3/4/2024 3/4/2024 03/05/2024
Occupancy Inspection - Planning Temporary C of O 3/4/2024 3/4/2024 03/05/2024
Miscellaneous Correction
Corrective Action Required
03/05/2024
A full inspection will be performed by Planning at the occupancy inspection on the final building.
Erosion Control Inspection Partial 3/29/2024 03/29/2024
Misc
Informational
02/28/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 4/18/2024 04/18/2024
Misc
Informational
03/29/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 4/30/2024 04/30/2024
Misc
Informational
04/18/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues
Occupancy Inspection - Engineering Temporary C of O 5/8/2024 5/8/2024 05/08/2024
Misc
Informational
03/04/2024
3-4-24 Temporary Occupancy Approved Punchlist: Due 4-4-24 1) Vegetation or Decorative rock between units 2)Concrete replace where broken out due to electric 3) Cleanup Site (Trash, Debris, Trash Dumpster) 5-8-24 NS Site visited for a TO concrete has been replaced but dirt and rocks need to be cleaned up
Occupancy Inspection - Planning Temporary C of O 5/8/2024 5/8/2024 05/08/2024
Miscellaneous Correction
Corrective Action Required
03/05/2024
A full inspection will be performed by Planning at the occupancy inspection on the final building.
Corrective Action Required
05/08/2024
Complete landscaping per the approved plan.
Occupancy Inspection - Codes Commercial Failed 5/8/2024 5/8/2024 05/08/2024
MISC
Corrective Action Required
03/04/2024
-APPROVAL REQUIRED FROM: FEI, PLANNING -PROVIDE COMPLIANCE WITH NEC 225.30&31
Erosion Control Inspection Partial 6/28/2024 06/28/2024
Misc
Informational
04/30/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 7/25/2024 07/25/2024
Misc
Informational
06/28/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 8/6/2024 08/06/2024
Misc
Informational
07/25/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 8/8/2024 08/08/2024
Misc
Informational
08/06/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion control issues
Site Visit Partial 08/08/2024
Misc
Informational
08/08/2024
8-8-24 NS Site Visited and no one is working due to rain.
Erosion Control Inspection Partial 8/16/2024 08/16/2024
Misc
Informational
08/08/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion control issues 8-16-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 8/22/2024 08/22/2024
Misc
Informational
08/16/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion control issues 8-16-24 NS Site Visited and no erosion control issues 8-22-24 NS Site Visited and no erosion control issues
Occupancy Inspection - Planning Passed 08/22/2024
Corrective Action Required
08/22/2024
With the completion of construction activity on the site, the porta-potties shall be removed from the site upon issuance of the final Certificate of Occupancy.
Occupancy Inspection - Codes Commercial Full C of O 8/22/2024 08/22/2024
MISC
Resolved
08/22/2024
-APPROVAL REQUIRED FROM: FEI, PLANNING
Erosion Control Inspection Passed 08/22/2024
Misc
Informational
08/22/2024
7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no eco issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues 2-28-24 NS Site Visited and no erosion control issues 3-29-24 NS Site Visited and no erosion control issues 4-18-24 NS Site Visited and no erosion control issues 4-30-24 NS Site Visited and no erosion control issues 6-28-24 NS Site Visited and no erosion control issues 7-25-24 NS Site Visited and no erosion control issues 8-8-24 NS Site Visited and no erosion control issues 8-16-24 NS Site Visited and no erosion control issues 8-22-24 NS Site Visited and no erosion control issues
Site Visit Complete 08/22/2024
Misc
Informational
08/08/2024
8-8-24 NS Site Visited and no one is working due to rain.
Occupancy Inspection - Engineering Passed 08/22/2024
Misc
Informational
05/08/2024
3-4-24 Temporary Occupancy Approved Punchlist: Due 4-4-24 1) Vegetation or Decorative rock between units 2)Concrete replace where broken out due to electric 3) Cleanup Site (Trash, Debris, Trash Dumpster) 5-8-24 NS Site visited for a TO concrete has been replaced but dirt and rocks need to be cleaned up
Documents & Images
Date Uploaded File Type Document Name
10/03/2022 Application Form APPLICATION
10/04/2022 Plans 22220 - Mega Storage Permit Set - 09_30_2022
10/04/2022 Letter comm permit Phase II breakout by building
10/04/2022 Plans ~Foundation Lee Summit, MO 090922
10/04/2022 Engineer Report/Study ~Building 6 and 7 calculations
10/04/2022 Engineer Report/Study ~Building 11 and 12 calculations
10/04/2022 Engineer Report/Study ~Building 16 calculations
10/04/2022 Engineer Report/Study ~Building 17 calculations
10/04/2022 Plans ~Building 6 drawings
10/04/2022 Plans ~Building 7 drawings
10/04/2022 Plans ~Building 11 drawings
10/04/2022 Plans ~Building 16 drawings
10/04/2022 Plans ~Building 17 drawings
10/06/2022 Letter License Tax Bill
10/10/2022 Letter License Tax Bill
10/18/2022 Letter Fire Building Plan Review
11/15/2022 Letter Mega Storage Phase II - Permit Resubmittal Letter
11/15/2022 Plans 22220 - Mega Storage Permit Set - 11_03_2022
11/22/2022 Approved Plans APPROVED 22220 - Mega Storage civil Set - 11_03_2022
11/22/2022 Letter Fire Building Plan Review
11/23/2022 Letter Lees Summit Letter ASCE 32 111722
11/28/2022 Letter ASCE 32 111722 11-28-22
11/28/2022 _Geotechnical Report 03382230 (Proposed Lot 1 Development Lee's Summit MO)
03/29/2023 ~Bldg F 50x100 Calcs 022723
03/29/2023 ~Bldg G 50x100 Calcs 022723
03/29/2023 ~Bldg K 65x70 Calcs 022723
03/29/2023 ~Bldg L 65x70 Calcs 022723
03/29/2023 ~Bldg P 60x84 Calcs 022723
03/29/2023 ~Bldg Q 60x56 Calcs 022723
03/29/2023 ~Bldg R 60x84 Calcs 022723
03/29/2023 ~Bldg S 60x84 Calcs 022723
03/29/2023 ~Bldg T 40x112 Calcs 022723
03/29/2023 ~Bldg U 40x112 Calcs 022723
03/29/2023 ~Building 6 drawings F
03/29/2023 ~Building 7 drawings G
03/29/2023 ~Building 11 drawings K
03/29/2023 ~Building 12 drawings L
03/29/2023 ~Building 16 drawings P
03/29/2023 ~Building 17 drawings Q
03/29/2023 ~Building 18 drawings R
03/29/2023 ~Building 19 drawings S
03/29/2023 ~Building 20 drawings T
03/29/2023 ~Building 21 drawings U
03/29/2023 ~Foundation Lee Summit 022723
03/29/2023 3382337 Addendum 2 - Proposed Lot 1 Development
04/05/2023 Letter DS P/R Corrections Document
06/05/2023 Letter Mega Storage Phase II - Permit Resubmittal Letter 06-05-2023
06/08/2023 Drawing ~D1 053023
06/13/2023 Letter DS P/R Corrections Document
06/16/2023 Approved Plans Approved plans
06/19/2023 Receipt Receipt for transaction:2023-004558
06/21/2023 Letter DS Building Permit
07/14/2023 Plans ~Foundation Lee Summit 071323
07/17/2023 Approved Plans approved ~Foundation Lee Summit 071323
07/25/2023 Letter INSPECTION SUMMARY
07/31/2023 Letter INSPECTION SUMMARY
08/29/2023 Letter Fire Building Plan Review
08/29/2023 Letter Fire Building Plan Review
08/29/2023 Letter Fire Building Plan Review
08/29/2023 Letter Fire Building Plan Review
08/29/2023 Letter Fire Building Plan Review
09/07/2023 Letter Fire Building Plan Review
09/07/2023 Letter DS P/R Corrections Document
09/07/2023 Letter Fire Building Plan Review
09/07/2023 Letter Fire Building Plan Review
09/07/2023 Letter Fire Building Plan Review
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Letter Codes Residential Plan Review
09/07/2023 Letter Fire Building Plan Review
09/08/2023 Letter Fire Building Plan Review
09/08/2023 Letter INSPECTION SUMMARY
09/14/2023 mega storm
09/14/2023 mega water tie
09/20/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
02/28/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/05/2024 Letter INSPECTION SUMMARY
03/29/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
04/30/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/08/2024 Letter INSPECTION SUMMARY
05/10/2024 Certificate/License Codes Temporary Certificate of Occupancy
05/10/2024 Receipt Receipt for transaction:2024-003250
06/21/2024 22220 - Mega Storage Permit Set - 06_21_2022
06/21/2024 Revision summary 06-21-2024
06/28/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
07/24/2024 Approved Plans Approved Lighting Revisions
07/25/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/16/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter INSPECTION SUMMARY
08/22/2024 Letter Field Certificate of Occupancy
08/22/2024 Letter Codes Final Certificate of Occupancy
08/22/2024 Letter INSPECTION SUMMARY
08/23/2024 Engineer Report/Study R, S, T, U Foundation Reports
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home