Permit Application Status

PRCOM20223245


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20223245
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
HOSPITAL RENOVATION - OR SPACE AND STORAGE **OR SPECIALTY SYSTEMS DEFERRED (med gas, etc)
07/13/2022
08/05/2022
01/22/2023
01/09/2023
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
jon.whaley@jedunn.com, Address:jon.whaley@jedunn.com, Phone:(816) 215-5852  
justin.j.parker@jedunn.com, Address:justin.j.parker@jedunn.com, Phone:(816) 577-1769  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 08/22/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
08/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Alteration plans received August 8, 2022.
Installation acceptance testing
Corrective Action Required
08/22/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
Licensed Contractors Approved 08/04/2022 08/05/2022
Joe Frogge
LC - General Contractor
Resolved
08/05/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 7/29/22 - acknowledged in letter.
LC - MEP Subs
Resolved
08/05/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/29/22 - acknowledged in letter.
Fire Plan Review Approved 08/04/2022 07/29/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
07/28/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
07/28/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Miscellaneous Correction
Informational
07/29/2022

Provide documentation for pressure testing of medical gas piping. Verified at inspection.
Building Plan Review Approved with Conditions 08/04/2022 07/28/2022
Joe Frogge
IBC 706.1 Fire and Smoke Protection - General
Resolved
07/29/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Actions required: - Provide complete UL construction details for UL465. - Modify door schedule to show 45min rating at door 1A047B.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
07/28/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: All circuits in patient care areas are required to have redundant ground system. To be field verified. 7/29/22 - acknowledged in letter.
Fire Plan Review Approved with Conditions 07/25/2022 07/26/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
07/26/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
07/26/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for review and approval.
Miscellaneous Correction
Corrective Action Required
07/26/2022

Provide documentation for pressure testing of medical gas piping. Verified at inspection.
Building Plan Review Rejected 07/25/2022 07/21/2022
Joe Frogge
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
07/21/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Actions required: - Provide complete UL construction details for UL465. - Modify door schedule to show 45min rating at door 1A047B.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
07/21/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: All circuits in patient care areas are required to have redundant ground system. To be field verified.
Licensed Contractors Rejected 07/25/2022 07/20/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
07/20/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
07/20/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $5,120.00 $5,120.00 Paid 08/05/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 8/11/2022 08/11/2022
Misc
Informational
08/11/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058
Above Ceiling Inspection Partial 8/24/2022 8/24/2022 08/24/2022
Miscellaneous Correction
Corrective Action Required
08/24/2022
1A047B-OK 1A056-OK 1A046-Complete 1 hr rating at perimeter walls
Underslab Electrical Inspection - Commercial Passed 08/29/2022
Final Electrical Inspection - Commercial Failed 9/6/2022 09/06/2022
Miscellaneous Correction
Corrective Action Required
09/06/2022
ROOM 1A046 OPEN BOX ABOVE CEILING AT ACCESS DOOR & REAR WALL ( BACKORDER)
Above Ceiling Inspection Partial 9/6/2022 9/6/2022 09/06/2022
Miscellaneous Correction
Corrective Action Required
08/24/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/22
In-wall Inspection Partial 8/29/2022 9/6/2022 09/06/2022
Misc
Informational
08/11/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22
Rough Mechanical Inspection - Commercial Partial 9/23/2022 09/23/2022
Misc
Informational
09/23/2022
DUCT WORK ROOM 2A116 JANITOR CLOSET, 3RD FLOOR MECH ROOM
Rated Assembly Inspection Partial 9/23/2022 9/23/2022 09/23/2022
Misc
Informational
09/23/2022
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 -
Rough Mechanical Inspection - Commercial Partial 9/26/2022 09/26/2022
Misc
Informational
09/23/2022
DUCT WORK ROOM 2A116 JANITOR CLOSET, 3RD FLOOR MECH ROOM - ROOM 2A116 DUCT INSULATION IN WALL OF JANITOR CLOSET -
Rated Assembly Inspection Partial 9/26/2022 9/26/2022 09/26/2022
Misc
Informational
09/23/2022
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 - - ROOM 2A040 2ND LAYER SCREW PATTERN, ROOM 02-1A094 1ST LAYER ABOVE CEILING GRID -
In-wall Inspection Partial 9/27/2022 9/27/2022 09/27/2022
Misc
Informational
09/06/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22 - RM 021A083 EAST, WEST, SOUTH WALLS OK TO COVER,
Miscellaneous Correction
Corrective Action Required
09/27/2022
- RM 02-1A083 INSTALL BACKORDERED PANEL SOUTH WALL -
Rated Assembly Inspection Partial 9/27/2022 9/27/2022 09/27/2022
Misc
Informational
09/26/2022
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 - - ROOM 2A040 2ND LAYER SCREW PATTERN, ROOM 02-1A094 1ST LAYER ABOVE CEILING GRID - - RM 02-1A094 2ND LAYER ABOVE CEILING GRID WEST & SOUTH WALLS, SCREW PATTERN 1ST OF 3 LAYERS SOFFIT NORTH WALL -
Rated Assembly Inspection Partial 9/28/2022 9/28/2022 09/28/2022
Misc
Informational
09/27/2022
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 - - ROOM 2A040 2ND LAYER SCREW PATTERN, ROOM 02-1A094 1ST LAYER ABOVE CEILING GRID - - RM 02-1A094 2ND LAYER ABOVE CEILING GRID WEST & SOUTH WALLS, SCREW PATTERN 1ST OF 3 LAYERS SOFFIT NORTH WALL - - RM 02-1A094 2ND LAYER TYPE C SCREW PATTERN AT SOFFIT -
Rated Assembly Inspection Partial 9/29/2022 9/29/2022 09/29/2022
Misc
Informational
09/28/2022
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 - - ROOM 2A040 2ND LAYER SCREW PATTERN, ROOM 02-1A094 1ST LAYER ABOVE CEILING GRID - - RM 02-1A094 2ND LAYER ABOVE CEILING GRID WEST & SOUTH WALLS, SCREW PATTERN 1ST OF 3 LAYERS SOFFIT NORTH WALL - - RM 02-1A094 2ND LAYER TYPE C SCREW PATTERN AT SOFFIT - - RN 02-1A094 3RD LAYER TYPE C CEILING AT SOFFITT -
Above Ceiling Inspection Partial 10/3/2022 10/3/2022 10/03/2022
Miscellaneous Correction
Corrective Action Required
09/06/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22
Above Ceiling Inspection Partial 10/10/2022 10/10/2022 10/10/2022
Miscellaneous Correction
Corrective Action Required
10/03/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22 10/10/22 Sterile Storage room 02-1A079 OK
In-wall Inspection Partial 10/10/2022 10/10/2022 10/10/2022
Misc
Informational
09/27/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22 - RM 021A083 EAST, WEST, SOUTH WALLS OK TO COVER, - 10/10/22 Electrical raceway sterile storage ROOM 02-1A079 OK -
Miscellaneous Correction
Corrective Action Required
09/27/2022
- RM 02-1A083 INSTALL BACKORDERED PANEL SOUTH WALL -
In-wall Inspection Partial 10/17/2022 10/17/2022 10/17/2022
Misc
Informational
10/10/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22 - RM 021A083 EAST, WEST, SOUTH WALLS OK TO COVER, - 10/10/22 Electrical raceway sterile storage ROOM 02-1A079 OK - - 10/17/22 Room 02-1A094 electrical raceway storage room -
Miscellaneous Correction
Corrective Action Required
10/10/2022
- RM 02-1A083 INSTALL BACKORDERED PANEL SOUTH WALL -
Above Ceiling Inspection Partial 10/17/2022 10/17/2022 10/17/2022
Miscellaneous Correction
Corrective Action Required
10/10/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22 10/10/22 Sterile Storage room 02-1A079 OK
Miscellaneous Correction
Corrective Action Required
10/17/2022
- 10/17/22 ROOM 02-1A094 FIRE CAULK PENETRATIONS AT MC CABLES TO RACEWAYS & MC ABOVE DOOR LOW VOLT, FIRE CAULK END OF SLEEVES PENETRATING WALL ABOVE DOOR
In-wall Inspection Partial 10/20/2022 10/20/2022 10/20/2022
Misc
Informational
10/17/2022
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22 - RM 021A083 EAST, WEST, SOUTH WALLS OK TO COVER, - 10/10/22 Electrical raceway sterile storage ROOM 02-1A079 OK - - 10/17/22 Room 02-1A094 electrical raceway storage room OK - -10/20/22 Control room 02-1A082 OK -
Miscellaneous Correction
Corrective Action Required
10/17/2022
- RM 02-1A083 INSTALL BACKORDERED PANEL SOUTH WALL -
Above Ceiling Inspection Partial 10/20/2022 10/20/2022 10/20/2022
Miscellaneous Correction
Corrective Action Required
10/17/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22 10/10/22 Sterile Storage room 02-1A079 OK - 10/20/22 HARD LID 02-1A083 OK -
Miscellaneous Correction
Corrective Action Required
10/17/2022
- 10/17/22 ROOM 02-1A094 FIRE CAULK PENETRATIONS AT MC CABLES TO RACEWAYS & MC ABOVE DOOR LOW VOLT, FIRE CAULK END OF SLEEVES PENETRATING WALL ABOVE DOOR
Occupancy Inspection - Codes Commercial Failed 10/24/2022 10/24/2022 10/24/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/24/2022
PARTIAL OK TO OCCUPY THE FOLLOWING ROOMS SV OFFICE # 02-1A058, CONSULTATION # 02-1A047B, PATHOLOGY # 02-1A056 STORAGE # 02-1A079 CLEAN ROOM # 02-1A046
Alarm Test Partial 10/24/2022 10/24/2022
Occupancy Inspection - Fire Partial 10/24/2022 10/24/2022 10/24/2022
Corrective Action Required
10/24/2022
The spaces listed below are approved for occupancy. Consultation 02-1A047B Pathology 02-1A056 SV Office 02-1A058 Storage 02-1A079 Clean Room 02-1A046
Above Ceiling Inspection Failed 11/4/2022 11/4/2022 11/04/2022
Miscellaneous Correction
Corrective Action Required
10/20/2022
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22 10/10/22 Sterile Storage room 02-1A079 OK - 10/20/22 HARD LID 02-1A083 OK -
Miscellaneous Correction
Corrective Action Required
10/20/2022
- 10/17/22 ROOM 02-1A094 FIRE CAULK PENETRATIONS AT MC CABLES TO RACEWAYS & MC ABOVE DOOR LOW VOLT, FIRE CAULK END OF SLEEVES PENETRATING WALL ABOVE DOOR
Misc
Corrective Action Required
11/04/2022
11/4/22 - CONTROL RM 02-1A082 FIRE CAULK ALL PENETRATIONS
Occupancy Inspection - Codes Commercial Failed 11/17/2022 11/17/2022 11/17/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
10/24/2022
PARTIAL OK TO OCCUPY THE FOLLOWING ROOMS SV OFFICE # 02-1A058, CONSULTATION # 02-1A047B, PATHOLOGY # 02-1A056 STORAGE # 02-1A079 CLEAN ROOM # 02-1A046 STORAGE ROOM # 02-1A094
Alarm Test Partial 11/17/2022 11/17/2022
Corrective Action Required
11/17/2022
storage 02-1A094
Occupancy Inspection - Fire Partial 11/17/2022 11/17/2022 11/17/2022
Corrective Action Required
11/17/2022
storage 02-1A094
Occupancy Inspection - Codes Commercial Failed 12/27/2022 12/27/2022 12/27/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
11/17/2022
PARTIAL OK TO OCCUPY THE FOLLOWING ROOMS SV OFFICE # 02-1A058, CONSULTATION # 02-1A047B, PATHOLOGY # 02-1A056 STORAGE # 02-1A079 CLEAN ROOM # 02-1A046 STORAGE ROOM # 02-1A094 OR # 02-1A083 CONTROL ROOM # 02-1A082 EQUIPMENT #02-1A082B
Occupancy Inspection - Codes Commercial Failed 1/5/2023 1/5/2023 01/05/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/27/2022
PARTIAL OK TO OCCUPY THE FOLLOWING ROOMS SV OFFICE # 02-1A058, CONSULTATION # 02-1A047B, PATHOLOGY # 02-1A056 STORAGE # 02-1A079 CLEAN ROOM # 02-1A046 STORAGE ROOM # 02-1A094 OR # 02-1A083 CONTROL ROOM # 02-1A082 EQUIPMENT #02-1A082B STORAGE #1A046
Above Ceiling Inspection Passed 1/9/2023 1/9/2023 01/09/2023
Miscellaneous Correction
Resolved
01/09/2023
1A047B-OK 1A056-OK 1A046 - OK 9/6/2 02-14056 - OK 10/3/22 10/10/22 Sterile Storage room 02-1A079 OK - 10/20/22 HARD LID 02-1A083 OK -
Miscellaneous Correction
Resolved
01/09/2023
- 10/17/22 ROOM 02-1A094 FIRE CAULK PENETRATIONS AT MC CABLES TO RACEWAYS & MC ABOVE DOOR LOW VOLT, FIRE CAULK END OF SLEEVES PENETRATING WALL ABOVE DOOR
Misc
Resolved
01/09/2023
11/4/22 - CONTROL RM 02-1A082 FIRE CAULK ALL PENETRATIONS
Rated Assembly Inspection Passed 01/09/2023
Misc
Resolved
01/09/2023
- ROOM 2A116 1 ST LAYER SCREW PATTERN TYPE F2 UL U469 - - ROOM 2A040 2ND LAYER SCREW PATTERN, ROOM 02-1A094 1ST LAYER ABOVE CEILING GRID - - RM 02-1A094 2ND LAYER ABOVE CEILING GRID WEST & SOUTH WALLS, SCREW PATTERN 1ST OF 3 LAYERS SOFFIT NORTH WALL - - RM 02-1A094 2ND LAYER TYPE C SCREW PATTERN AT SOFFIT - - RN 02-1A094 3RD LAYER TYPE C CEILING AT SOFFITT -
Rough Mechanical Inspection - Commercial Passed 01/09/2023
Misc
Resolved
01/09/2023
DUCT WORK ROOM 2A116 JANITOR CLOSET, 3RD FLOOR MECH ROOM - ROOM 2A116 DUCT INSULATION IN WALL OF JANITOR CLOSET -
In-wall Inspection Passed 01/09/2023
Misc
Resolved
01/09/2023
In-wall ok below: -Clean room 02-1A046; Consultation 02-1A047B; SV office 02-1A058 - 1A056 - OK 9/6/22 - RM 021A083 EAST, WEST, SOUTH WALLS OK TO COVER, - 10/10/22 Electrical raceway sterile storage ROOM 02-1A079 OK - - 10/17/22 Room 02-1A094 electrical raceway storage room OK - -10/20/22 Control room 02-1A082 OK -
Miscellaneous Correction
Resolved
01/09/2023
- RM 02-1A083 INSTALL BACKORDERED PANEL SOUTH WALL -
Final Electrical Inspection - Commercial Passed 01/09/2023
Miscellaneous Correction
Resolved
01/09/2023
ROOM 1A046 OPEN BOX ABOVE CEILING AT ACCESS DOOR & REAR WALL ( BACKORDER)
Occupancy Inspection - Codes Commercial Full C of O 01/09/2023
THE FOLLOWING AREAS ARE APPROVED
Resolved
01/09/2023
PARTIAL OK TO OCCUPY THE FOLLOWING ROOMS SV OFFICE # 02-1A058, CONSULTATION # 02-1A047B, PATHOLOGY # 02-1A056 STORAGE # 02-1A079 CLEAN ROOM # 02-1A046 STORAGE ROOM # 02-1A094 OR # 02-1A083 CONTROL ROOM # 02-1A082 EQUIPMENT #02-1A082B STORAGE #1A046
Documents & Images
Date Uploaded File Type Document Name
07/13/2022 Application Form application
07/14/2022 Plans SLE HYBRID OR - PERMIT SET 22-0714
07/26/2022 Letter DS P/R Corrections Document
07/27/2022 Letter 3-20034-City-Code_Review Response_Hybrid OR 22-0727
07/27/2022 Drawing A0-3 - PARTITION TYPES AND DETAILS
07/27/2022 Drawing A4-1 - DOOR AND FRAME SCHEDULE AND DETAILS
08/02/2022 Letter Fire Building Plan Review
08/02/2022 Letter Fire Building Plan Review
08/04/2022 Approved Plans approved - SLE HYBRID OR - PERMIT SET 22-0714
08/05/2022 Receipt Receipt for transaction:2022-006417
08/05/2022 Letter DS Building Permit
08/11/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter Fire (Sprinkler) Plan Review
08/24/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/06/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/26/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/17/2022 Letter INSPECTION SUMMARY
10/17/2022 Letter INSPECTION SUMMARY
10/17/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter Fire Loss Reduction Form
11/04/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter Fire Loss Reduction Form
12/27/2022 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter Codes Final Certificate of Occupancy
01/09/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home