Summary
PRCOM20215281
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 5PLEX
10/08/2021
08/25/2022
06/22/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
TEG CHAPEL RIDGE LLC, Address:365 NY 59 STE 110  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/07/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $2,343.55 $2,343.55 Paid 08/24/2022
8331507-Sewer Connection Fee $1,650.00 $1,650.00 Paid 08/24/2022
7232302-Residential Excise Tax Fee $3,046.40 $3,046.40 Paid 08/24/2022
9110078-Valuation Fee for New Multi-Family $3,645.71 $3,645.71 Paid 08/24/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Partial 10/17/2022 10/14/2022 10/14/2022
Misc
Corrective Action Required
10/14/2022
Attic firewall-1st layer ok
Electrical Service Inspection Passed 11/17/2022 11/17/2022 11/17/2022
Gas Service Inspection - Commercial Failed 11/17/2022 11/17/2022 11/17/2022
Misc
Corrective Action Required
11/17/2022
-Gas test fails for units B and E
All Rough Inspection - Commercial Failed 11/17/2022 11/17/2022 11/17/2022
Misc
Corrective Action Required
11/17/2022
-Provide metal flashing above horizontal protrusion behind service equipment UNIT A: -Secure SE cable within 12” of panel -Securely fasten SE cables above kitchen per code -Fb half bathroom wall from soffit; Fb all floor penetrations and wall plate penetrations throughout -Secure SE cables within 12” of service enclosure -Strap top plates lapped less than 2 ft at rear bedroom -Gap at 3” vent roof flashing UNIT B: -Secure SE cable within 12” of panel -Fb all floor penetrations and wall plate penetrations throughout -Protect 3” DVW at kitchen/bath wall with BOCA -Securely fasten SE cables above kitchen per code -Provide fire protection for roof deck above rear bathroom -Provide min 1” gap around b-vent at insulation shield. You can cut slots along the top of insulation shield and bend toward the b-vent shield to maintain the 1” clearance UNIT C: -Screw trusses to garage wall -Secure SE cable within 12” of panel -Toe nail joists to wall top plates per code -Vent half bathroom fan -Protect 3” DVW at kitchen/bath wall with BOCA -Complete master shower plumbing -Securely fasten SE cables above kitchen per code -Support 1.5” DVW per code above dining -Fb all floor penetrations and wall plate penetrations throughout -Provide fire protection for roof deck above rear bathroom -Provide min 1” gap around b-vent at insulation shield. You can cut slots along the top of insulation shield and bend toward the b-vent shield to maintain the 1” clearance -Install Sheetrock between back-back electrical boxes UNIT D: -Nail garage PFH wall sheathing per code. Nail to header w/8d@3” grid pattern -Fill in gap at entry door hinges with wood -Vent half bathroom fan -Protect 3” DVW at kitchen/bath wall with BOCA -Securely fasten SE cables above kitchen per code -Fb all floor penetrations and wall plate penetrations throughout -Provide fire protection for roof deck above rear bathroom -Provide min 1” gap around b-vent at insulation shield. You can cut slots along the top of insulation shield and bend toward the b-vent shield to maintain the 1” clearance UNIT E: -Nail garage PFH wall sheathing per code. Nail to header w/8d@3” grid pattern -Fill in gap at entry door hinges with wood -Vent half bathroom fan -Protect 3” DVW at half bath wall with BOCA -Securely fasten SE cables above kitchen per code -Fb all floor penetrations and wall plate penetrations throughout -Complete dryer duct -Gap at plumbing roof flashings -Protect wiring at hallway bottom wall plate -Secure wiring within 8” of master bedroom light switch -Protect water lines in master closet with BOCA plates **OK TO INSULATE
Gas Service Inspection - Commercial Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/17/2022
-Gas test fails for unit E. Pressure not holding
All Rough Inspection - Commercial Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/17/2022
-Provide metal flashing above horizontal protrusion behind service equipment -Fb AC coolant line penetration of floor near auxiliary drain pan UNIT A: -Gap at 3” vent roof flashing UNIT B: -Provide fire protection for roof deck above rear bathroom UNIT C: -Vent half bathroom fan **Fb top plate -Provide fire protection for roof deck above rear bathroom UNIT D: -Fill in gap at entry door hinges with wood -Fb all floor penetrations and wall plate penetrations throughout **at 3” vent stack at master shower -Provide fire protection for roof deck above rear bathroom UNIT E: -Gap at plumbing roof flashings **OK TO INSULATE
Gas Service Inspection - Commercial Failed 11/30/2022 11/30/2022 11/30/2022
Misc
Corrective Action Required
11/22/2022
-Gas test fails for unit E. Pressure not holding **Still not holding. Pressure drops 1.5 marks in 10 minutes
Gas Service Inspection - Commercial Passed 12/2/2022 12/2/2022 12/02/2022
Misc
Resolved
12/02/2022
-Gas test fails for unit E. Pressure not holding **Still not holding. Pressure drops 1.5 marks in 10 minutes
Rated Assembly Inspection Partial 12/7/2022 12/7/2022 12/07/2022
Misc
Corrective Action Required
10/14/2022
Attic firewall-2nd layer ok Dwelling firewall-1st layer ok
All Rough Inspection - Commercial Passed 12/7/2022 12/07/2022
Misc
Resolved
12/07/2022
-Provide metal flashing above horizontal protrusion behind service equipment -Fb AC coolant line penetration of floor near auxiliary drain pan UNIT A: -Gap at 3” vent roof flashing UNIT B: -Provide fire protection for roof deck above rear bathroom UNIT C: -Vent half bathroom fan **Fb top plate -Provide fire protection for roof deck above rear bathroom UNIT D: -Fill in gap at entry door hinges with wood -Fb all floor penetrations and wall plate penetrations throughout **at 3” vent stack at master shower -Provide fire protection for roof deck above rear bathroom UNIT E: -Gap at plumbing roof flashings **OK TO INSULATE
Rated Assembly Inspection Passed 12/14/2022 12/14/2022 12/14/2022
Misc
Resolved
12/14/2022
Attic firewall-2nd layer ok Dwelling firewall-1st layer ok
Occupancy Inspection - Codes Commercial Ready for Temp CO 4/14/2023 4/14/2023 04/14/2023
Misc
Corrective Action Required
04/14/2023
OUTDOOR: -Seal exterior wall penetrations, light, etc -Flash protrusion behind service -Paint gas service piping -Install tamperproof caps at AC valves **TCO approved for all units
Occupancy Inspection - Codes Commercial Full C of O 06/22/2023
Misc
Resolved
06/22/2023
-Install tamperproof caps at AC valves
Documents & Images
Date Uploaded File Type Document Name
08/24/2022 Receipt Receipt for transaction:2022-006945
08/25/2022 Letter DS Building Permit
10/14/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
12/02/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
06/02/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/02/2023 Receipt Receipt for transaction:2023-003915
06/22/2023 Letter Field Certificate of Occupancy
06/22/2023 Letter Codes Final Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy221
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents