Summary
PRCOM20215276
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 4PLEX
10/08/2021
08/25/2022
06/23/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
TEG CHAPEL RIDGE LLC, Address:365 NY 59 STE 110  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/07/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $1,874.84 $1,874.84 Paid 08/24/2022
8331507-Sewer Connection Fee $1,320.00 $1,320.00 Paid 08/24/2022
7232302-Residential Excise Tax Fee $2,437.12 $2,437.12 Paid 08/24/2022
9110078-Valuation Fee for New 3 or 4 Family $2,251.12 $2,251.12 Paid 08/24/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Passed 8/26/2022 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
Attic separation wall-1st layer ok
Gas Service Inspection - Commercial Passed 10/7/2022 10/07/2022
Electrical Service Inspection Passed 10/7/2022 10/7/2022 10/07/2022
All Rough Inspection - Commercial Failed 10/7/2022 10/7/2022 10/07/2022
Misc
Corrective Action Required
10/07/2022
UNIT A: -Fill in void behind entry door hinges -Protect 3” DVW in half bathroom -Nail corner studs 16d@12” or equivalent nailing -Fb opening at laundry/bedroom wall bottom and top plate -Protect wiring within six ft of attic access -Fb wall plate penetrations -Support furnace flue pipes every 5 ft -Support plumbing vent every 4 ft -Gap at vent roof flashing -Back-back electrical boxes in firewall too close. Use putty pad -Raise the vent offset min 6” above sink flood rim at master bathroom UNIT B: -Toe nail all joists to wall top plates -Fill in gaps at entry door hinges and strike plate side per security code -Complete master shower plumbing -Nail corner studs 16d@12” or equivalent nailing -Protect dryer duct at wall bottom plate -Protect clothes washer red water line at wall bottom plate -The laundry/bathroom vent roof flashing not completely sealed around vent -Back-back electrical boxes in firewall too close. Use putty pad -Fb wall plate penetrations -Protect water lines in master closet UNIT C: -Toe nail all joists to wall top plates -Fill in gaps at entry door hinges and strike plate side per security code -Protect plumbing in half bathroom -Complete master shower plumbing -Nail corner studs 16d@12” or equivalent nailing -Protect dryer duct at wall bottom plate -Secure wiring within 8” of receptacle box at rear bedroom -Wiring outside of stud space at rear corner of rear bedroom -Protect plumbing at rear bathroom top wall plate -Fb wall plate penetrations -Protect red water line in master closet UNIT D: -Re-nail sheathing to sill and stud at half bathroom -Protect plumbing in half bathroom -Fb half bathroom wall from soffit -Protect wiring at stair wall -Provide min 1” clearance from b-vent to combustible -The laundry/bathroom vent roof flashing not completely sealed around vent -Protect water line at master closet **OK TO INSULATE
Rated Assembly Inspection Partial 10/7/2022 10/07/2022
Misc
Corrective Action Required
08/26/2022
Attic separation wall-2nd layer ok
All Rough Inspection - Commercial Failed 10/24/2022 10/24/2022 10/24/2022
Misc
Corrective Action Required
10/07/2022
UNIT A: -Gap at vent roof flashing -Raise the vent offset min 6” above sink flood rim at master bathroom UNIT B: -Protect clothes washer red water line at wall bottom plate -The laundry/bathroom vent roof flashing not completely sealed around vent UNIT C: -Protect plumbing at top wall plate at rear bathroom UNIT D: -The laundry/bathroom vent roof flashing not completely sealed around vent
Rated Assembly Inspection Partial 10/25/2022 10/25/2022 10/25/2022
Misc
Corrective Action Required
08/26/2022
Attic separation wall-2nd layer ok Dwelling separation wall-1st layer ok
All Rough Inspection - Commercial Passed 10/27/2022 10/27/2022 10/27/2022
Misc
Resolved
10/27/2022
UNIT A: UNIT B: UNIT C: UNIT D:
Rated Assembly Inspection Passed 11/1/2022 11/1/2022 11/01/2022
Misc
Resolved
11/01/2022
Attic separation wall-2nd layer ok Dwelling separation wall-2nd layer ok
Occupancy Inspection - Codes Commercial Failed 4/28/2023 4/28/2023 04/28/2023
Miscellaneous Correction
Corrective Action Required
04/28/2023
-first stair riser from kitchen floor is 8 inches high and not per code (1011.5.2) -exterior wall penetrations need to be sealed -A/C unit is not installed at time of inspection -sod and splash pads are not installed -water meter was not checked at time of inspection because final grading is not completed
Occupancy Inspection - Codes Commercial Failed 4/28/2023 04/28/2023
Miscellaneous Correction
Corrective Action Required
04/28/2023
A -first stair riser from kitchen floor is 8 inches high and not per code (1011.5.2) -exterior wall penetrations need to be sealed -A/C unit is not installed at time of inspection -sod and splash pads are not installed -water meter was not checked at time of inspection because final grading is not completed B -first stair riser from kitchen floor is 8 inches high and is not per code (1011.5.2) -exterior lights need to be sealed at the top -a/c unit is not installed at the time of inspection -sod and splash pad not installed -water meter not inspected because final grading is not completed C -garage to house door self closing hinge is not working -first stair riser from kitchen floor is 8 inches high and is not per code (1011.5.2) -a/c unit is not installed at the time of inspection -exterior lights need to be sealed at the top -sod and splash pad not installed -Water meter not inspected because final grading is not completed D -garage to house self closing hinge is not working -first stair riser from the kitchen floor is 8 1/4 inches high and is not per code (1011.5.2) -a/c unit not installed at time of inspection -exterior lights need to be sealed at the top -sod and splash pad not installed -water meter not inspected because final grading is not completed
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/1/2023 5/1/2023 05/01/2023
Miscellaneous Correction
Corrective Action Required
04/28/2023
-Complete exterior: patio, install AC units, etc -Seal exterior wall penetrations, lights, flashing above protrusion, etc -Sod and install splash blocks **TCO approved for all units
Occupancy Inspection - Codes Commercial Full C of O 6/23/2023 06/23/2023
Miscellaneous Correction
Resolved
06/23/2023
-Complete exterior: patio, install AC units, etc -Seal exterior wall penetrations, lights, flashing above protrusion, etc -Sod and install splash blocks **TCO approved for all units
Documents & Images
Date Uploaded File Type Document Name
08/24/2022 Receipt Receipt for transaction:2022-006945
08/25/2022 Letter DS Building Permit
08/26/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
10/27/2022 Letter INSPECTION SUMMARY
11/01/2022 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
06/02/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/02/2023 Receipt Receipt for transaction:2023-003915
06/23/2023 Letter Codes Final Certificate of Occupancy
06/23/2023 Letter Field Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy217
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home