Permit Application Status

PRCOM20215275


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215275
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 4PLEX
10/08/2021
08/25/2022
06/22/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/07/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $1,874.84 $1,874.84 Paid 08/24/2022
8331507-Sewer Connection Fee $1,320.00 $1,320.00 Paid 08/24/2022
7232302-Residential Excise Tax Fee $2,437.12 $2,437.12 Paid 08/24/2022
9110078-Valuation Fee for New 3 or 4 Family $2,251.12 $2,251.12 Paid 08/24/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rated Assembly Inspection Partial 8/26/2022 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/26/2022
Attic separation wall-1st layer ok
Electrical Service Inspection Passed 9/19/2022 9/19/2022 09/19/2022
Gas Service Inspection - Commercial Failed 9/19/2022 9/19/2022 09/19/2022
Misc
Corrective Action Required
09/19/2022
Unit A gas piping at zero psi pressure
Rated Assembly Inspection Partial 9/19/2022 09/19/2022
Misc
Corrective Action Required
08/26/2022
Attic separation wall-2nd layer ok
All Rough Inspection - Commercial Failed 9/19/2022 9/19/2022 09/19/2022
Misc
Corrective Action Required
09/19/2022
COMMON: -Complete dryer duct installation -Fb all floor and wall plate penetrations -Close excessive gag at ridge near firewall -Complete bathroom fan duct to outdoor UNIT A: -Address the half bathroom exterior wall top plate completely got cut off. Please tell the guy not to do this again -Vent half bathroom fan duct to outside -Fb all wall plate penetrations; Fb half bathroom walls from soffit and at top plate; Fb floor penetration at trap -Protect wiring at rear east bedroom closet wall where within 1.25” of stud surface -Roof flashing for vent -Complete bathroom fan duct to outside -Fb opening at bathroom/laundry wall top plate -Complete dryer duct to outside -Tell the guy don’t try to get combustion air from the master bedroom -Insulate flexible duct above door to master bedroom UNIT B: -Fb all wall plate penetrations; Fb half bathroom walls from soffit and at top plate; Fb floor penetration at trap -Install dryer duct -Secure dryer receptacle box to stud -Close roof deck openings near firewall -Support vent piping in attic every 4 ft -Flashing for vent at roof penetration -Close excessive gap at ridge near firewall UNIT C: -Fb all wall plate penetrations; Fb half bathroom wall; Fb floor penetration at trap -Nail all plate holes (at AC line protect plate) -Complete dryer duct to outside -Fb wall opening at laundry/bathroom wall; Fb floor penetration at trap -Close roof deck openings near firewall -Vent master bathroom fan to outside -Support vent piping in attic every 4 ft -Flashing for vent at roof penetration -Protect plumbing at master shower wall top plate UNIT D: -Anchor rear garage brace wall -Fb all wall plate penetrations; Fb half bathroom wall; Fb floor penetration at trap -Support plumbing above kitchen -Protect wiring at stair wall; at rear bedroom party wall -Vent 2nd fl bathroom fan to outside -Missing stud at 2nd fl bathroom/laundry wall -Complete dryer duct to outside **OK TO INSULATE
All Rough Inspection - Commercial Failed 9/23/2022 9/23/2022 09/23/2022
Misc
Corrective Action Required
09/19/2022
**DO NOT NOTCH THE EXTERIOR WALL TOP PLATE MORE THAN 50%. UNIT A: -Fb half bathroom exterior wall at top plate -Protect wiring at rear east bedroom closet wall where within 1.25” of stud surface -Roof flashing for vent -Fb opening at bathroom/laundry wall top plate -Insulate flexible duct above door to master bedroom UNIT B: -Fb half bathroom exterior wall at top plate -Install dryer duct **protect dryer duct **I see a nail hole through the roof deck near the vent above washer UNIT C: -Nail all plate holes (at AC line protect plate) UNIT D: -Protect wiring at rear bedroom party wall
Gas Service Inspection - Commercial Passed 9/23/2022 9/23/2022 09/23/2022
Misc
Resolved
09/23/2022
Unit A gas piping at zero psi pressure
Rated Assembly Inspection Partial 9/29/2022 9/29/2022 09/29/2022
Misc
Corrective Action Required
09/19/2022
Attic separation wall-2nd layer ok Dwelling separation wall-1st layer ok
All Rough Inspection - Commercial Passed 10/4/2022 10/4/2022 10/04/2022
Misc
Resolved
10/04/2022
UNIT A-OK UNIT B-OK UNIT C-OK UNIT D-OK
Rated Assembly Inspection Passed 10/4/2022 10/4/2022 10/04/2022
Misc
Resolved
10/04/2022
Attic separation wall-2nd layer ok Dwelling separation wall-1st layer ok
Occupancy Inspection - Codes Commercial Failed 2/27/2023 2/27/2023 02/27/2023
Misc
Corrective Action Required
02/27/2023
Exterior: -Final grade, sod, splash blocks -Install AC units -Paint gas service piping -Seal wall penetrations and lights; flash above electrical service Unit A: -Range anti-tipping device Unit B: -Provide peep hole at entry door Unit C: -Provide peep hole at entry door -Fb mechanical closet ceiling -Install furnace switch cover plate -Fix master bathroom receptacle ground fault condition and gfci protection Unit D-OK
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/7/2023 3/7/2023 03/07/2023
Misc
Corrective Action Required
02/27/2023
Exterior: -Final grade, sod, splash blocks -Install AC units -Paint gas service piping -Seal wall penetrations and lights; flash above electrical service **TCO APPROVED FOR ALL UNITS
Occupancy Inspection - Codes Commercial Full C of O 6/22/2023 06/22/2023
Misc
Resolved
06/22/2023
Exterior: -Final grade, sod, splash blocks -Install AC units -Paint gas service piping -Seal wall penetrations and lights; flash above electrical service **TCO APPROVED FOR ALL UNITS
Documents & Images
Date Uploaded File Type Document Name
08/24/2022 Receipt Receipt for transaction:2022-006945
08/25/2022 Letter DS Building Permit
08/26/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter INSPECTION SUMMARY
10/04/2022 Letter INSPECTION SUMMARY
02/27/2023 Letter INSPECTION SUMMARY
06/02/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/02/2023 Receipt Receipt for transaction:2023-003915
06/22/2023 Letter Codes Final Certificate of Occupancy
06/22/2023 Letter Field Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy216
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home