Permit Application Status

PRCOM20214955


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214955
Building Permit - Commercial
Certificate of Occupancy
JR COLLEGE DISTRICT OF METROPOLITAN KCMO
ADDITION COMMERCIAL
BUILDING ADDITION FOR COLLISION REPAIR SCHOOL - PROJECT INCLUDES INTERIOR RENOVATIONS TO CLASSROOMS
09/22/2021
01/04/2022
04/02/2022
11/20/2023
Locations
Contacts
charlie.wiggins@royalcskc.com, Address:charlie.wiggins@royalcskc.com  
Indoor Air Specialists, Address:6337 RAYTOWN RD, Phone:(816) 885-8564  
GRE ELECTRIC, Address:7427 TROOST AVE STE C, Phone:(816) 299-2949  
GENESIS PLUMBING, Address:P O BOX 18456, Phone:(816) 353-6724  
BNIM ARCHITECTS, Address:1735 BALTIMORE, SUITE 300, Phone:(816) 783-1500  
JR COLLEGE DISTRICT OF METROPOLITAN KCMO, Address:3200 BROADWAY  
Royal Construction Services LLC, Address:2017 W 104TH ST, Phone:(816) 886-7905  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 10/06/2021 10/12/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
10/12/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received October 12, 2022.
Installation acceptance testing
Corrective Action Required
10/12/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1303 to schedule test.
Miscellaneous Correction
Corrective Action Required
10/12/2022

The scope of work is for Maple Woods CC. FYI only.
Miscellaneous Correction
Corrective Action Required
10/12/2022

The alarm system shall supervise the sprinkler flow control valve on the spray booths. Verified at inspection.
Sprinkler Plan Review Released for Construction 10/06/2021 05/06/2022
Jim Eden
Installation acceptance testing
Corrective Action Required
05/06/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a hydrostatic test and flow test.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
05/06/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing system shall have documentation of a current annual inspection. Verified at inspection.
Licensed Contractors Approved 12/15/2021 12/30/2021
Joe Frogge
LC - General Contractor
Resolved
12/30/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Resolved
12/30/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 12/15/2021 12/28/2021
Joe Frogge
Final Development Plan
Resolved
12/28/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 12/8/21 - acknowledged in letter
IBC 602.1 Type of Construction - general
Resolved
12/08/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code narrative to show correct Construction Type which is 2B.
IBC 603.1 Type of Construction - Allowable Materials
Resolved
12/08/2021

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Remove wood from all wall details and sections.
IBC 706.1 Fire and Smoke Protection - General
Resolved
12/08/2021

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide UL # and complete construction details for fire rated assembly that includes nail/screw patterns.
Planning - Screening of ground mounted equipment
Resolved
12/08/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (re: CU-1)
Misc
Corrective Action Required
12/08/2021

Inadequate information to complete review. Action required: Provide complete paint booth design or request deferral. 12/8/21 - deferred per request
Final Development Plan Review Approved 12/28/2021
Joe Frogge
Fire Plan Review Approved with Conditions 12/15/2021 12/08/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
12/08/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
12/08/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
12/08/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Duct smoke detectors
Resolved
12/08/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Building Plan Review Rejected 10/06/2021 10/04/2021
Joe Frogge
Final Development Plan
Corrective Action Required
10/04/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
IBC 602.1 Type of Construction - general
Corrective Action Required
10/04/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code narrative to show correct Construction Type which is 2B.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
10/04/2021

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Remove wood from all wall details and sections.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
10/04/2021

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide UL # and complete construction details for fire rated assembly that includes nail/screw patterns.
Planning - Screening of ground mounted equipment
Corrective Action Required
10/04/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (re: CU-1)
Misc
Corrective Action Required
10/04/2021

Inadequate information to complete review. Action required: Provide complete paint booth design or request deferral.
Fire Plan Review Approved with Conditions 10/06/2021 10/04/2021
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
10/04/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
10/04/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/04/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Duct smoke detectors
Corrective Action Required
10/04/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Licensed Contractors Rejected 10/06/2021 10/04/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
10/04/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/04/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/06/2021 09/27/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/27/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings for the fire alarm system to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
09/27/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings for the fire sprinkler system to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
09/27/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Duct smoke detectors
Corrective Action Required
09/27/2021

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $2,922.95 $2,922.95 Paid 01/03/2022
$0.00
7232302-Commercial Excise Tax Fee $4,222.50 $4,222.50 Paid 01/03/2022
$4,222.50
9110081-Paved Surface Inspection Fee $1,752.48 $1,752.48 Paid 01/03/2022
9110071-Site Grading Fee $1,068.75 $1,068.75 Paid 01/03/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/26/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 10/25/2023
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$75.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 02/07/2022
Misc
Informational
02/07/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Site Visit Partial 2/14/2022 2/14/2022 02/15/2022
Misc
Informational
02/07/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
02/15/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Site Visit Partial 2/18/2022 2/18/2022 02/21/2022
Misc
Informational
02/15/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
02/15/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Site Visit Partial 2/22/2022 2/22/2022 02/23/2022
Misc
Informational
02/21/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
02/21/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/23/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Site Visit Partial 2/25/2022 2/25/2022 02/25/2022
Misc
Informational
02/23/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
02/23/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
02/23/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/23/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Site Visit Partial 2/28/2022 2/28/2022 03/03/2022
Misc
Informational
02/25/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
02/25/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
02/25/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/25/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/03/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Footing Inspection - Commercial Partial 3/4/2022 (9:00) 3/4/2022 03/04/2022
Misc
Corrective Action Required
03/04/2022
partial, D-M, 4-8
Site Visit Partial 3/7/2022 3/7/2022 03/14/2022
Misc
Informational
03/03/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
03/03/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
03/03/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/03/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
03/03/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/03/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
03/14/2022
No exterior work being done on site. RP 3-10-22
Site Visit Partial 03/14/2022
Misc
Informational
03/14/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
03/14/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
03/14/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
03/14/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Underslab Plumbing Inspection - Commercial Passed 3/16/2022 03/16/2022
Footing Inspection - Commercial Passed 3/17/2022 (11:00) 3/17/2022 03/17/2022
Misc
Resolved
03/17/2022
Site Visit Partial 3/21/2022 3/21/2022 03/21/2022
Misc
Informational
03/14/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
03/14/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
03/14/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
03/14/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
03/21/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Erosion Control Inspection Partial 03/24/2022
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
In-wall Inspection Partial 3/24/2022 3/24/2022 03/24/2022
Misc
Informational
03/24/2022
rough framing and electrical for welding room
Underslab Plumbing Inspection - Commercial Passed 3/28/2022 03/28/2022
Site Visit Partial 3/24/2022 3/24/2022 04/06/2022
Misc
Informational
03/21/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
03/21/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
03/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/21/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
03/21/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/21/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
03/21/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
03/21/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
03/21/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
04/06/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Site Visit Partial 4/11/2022 4/11/2022 04/12/2022
Misc
Informational
04/06/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
04/06/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
04/06/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/06/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
04/06/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/06/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
04/06/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
04/06/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
04/06/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
04/06/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
04/12/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Site Visit Partial 4/19/2022 4/19/2022 04/20/2022
Misc
Informational
04/12/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
04/12/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
04/12/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/12/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
04/12/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/12/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
04/12/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
04/12/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
04/12/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
04/12/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
04/12/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
04/20/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
04/27/2022
Spoke with AC and Charlie. Charlie said they have a plan for the pavement area and those plans should be getting submitted soon. 4/27/22 ES
Site Visit Partial 4/25/2022 4/25/2022 05/04/2022
Misc
Informational
04/20/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
04/20/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
04/20/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/20/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
04/20/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/20/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
04/20/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
04/20/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
04/20/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
04/20/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
04/20/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
04/20/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
05/04/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Site Visit Partial 05/04/2022
Misc
Informational
05/04/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
05/04/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
05/04/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/04/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
05/04/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
05/04/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
05/04/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
05/04/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
05/04/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
05/04/2022
Updated plans came into office on 5/3/22ES
Site Visit Partial 05/16/2022
Misc
Informational
05/04/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
05/04/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
05/04/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/04/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
05/04/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
05/04/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
05/04/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
05/04/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
05/04/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
05/04/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
05/04/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
05/16/2022
No work being performed today. 5/16/22
In-wall Inspection Partial 5/20/2022 5/20/2022 05/20/2022
Misc
Informational
03/24/2022
-rough framing and electrical for welding room -5/20/22 framing and electrical inspection for rooms HT202, HT203
Site Visit Partial 05/31/2022
Misc
Informational
05/16/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
05/16/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
05/16/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/16/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
05/16/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/16/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
05/16/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
05/16/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
05/16/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
05/16/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
05/16/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
05/16/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
05/16/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
05/16/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
05/16/2022
No work being performed today. 5/16/22 No outside work being performed today. Doesn’t look like parking lot is close to ready. 5/31/22 ES
Site Visit Partial 06/08/2022
Misc
Informational
05/31/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
05/31/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
05/31/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/31/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
05/31/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/31/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
05/31/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
05/31/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
05/31/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
05/31/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
05/31/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
05/31/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
05/31/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
05/31/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
05/31/2022
No work being performed today. 5/16/22 No outside work being performed today. Doesn’t look like parking lot is close to ready. 5/31/22 ES No work being done that needs inspections. 6/8/22 ES
Site Visit Partial 07/12/2022
Misc
Informational
06/08/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
06/08/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
06/08/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
06/08/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
06/08/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
06/08/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
06/08/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
06/08/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
06/08/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
06/08/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
06/08/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
06/08/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
06/08/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
06/08/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
06/08/2022
No work being performed today. 5/16/22 No outside work being performed today. Doesn’t look like parking lot is close to ready. 5/31/22 ES No work being done that needs inspections. 6/8/22 ES No work being done. The majority of the shell is completed, but parking lot work not done or prepped. 7/12/22 ES
Erosion Control Inspection Residential Partial 07/12/2022
Misc
Informational
07/12/2022
No erosion control issues. 7/12/22 ES
Site Visit Partial 07/15/2022
Misc
Informational
07/12/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
07/12/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
07/12/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
07/12/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
07/12/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
07/12/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
07/12/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
07/12/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
07/12/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
07/12/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
07/12/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
07/12/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
07/12/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
07/12/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
07/12/2022
No work being performed today. 5/16/22 No outside work being performed today. Doesn’t look like parking lot is close to ready. 5/31/22 ES No work being done that needs inspections. 6/8/22 ES No work being done. The majority of the shell is completed, but parking lot work not done or prepped. 7/12/22 ES No work being done. 7/15/22 ES
Site Visit Partial 07/18/2022
Misc
Informational
07/15/2022
Met Charlie Wiggins from Royal Construction on the job site. Discussed the parking lot options once the building addition has been added. I need to follow up with my project manager and planning concerning the parking lot. RP 2-7-22
Misc
Informational
07/15/2022
Stopped by to talk to Charlie some more about the parking lot. Nobody was on site doing work except the electrician. RP 2-15-22
Misc
Informational
07/15/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
07/15/2022
Talked with Charlie concerning the parking lot according to the plans. He will get with the designer to see about just mill and overlay the parking lot. RP 2-23-22
Misc
Informational
07/15/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
07/15/2022
Stopped by and talked with Charlie about the parking lot. He said they are still waiting to hear back from the engineer too. RP 3-3-22
Misc
Informational
07/15/2022
No exterior work being done on site. RP 3-10-22
Misc
Informational
07/15/2022
No exterior work being done on site for my inspections. Subcontractor is trying to dry out the subgrade to pour footings for the pad. Charlie wasn’t present to follow up on the parking lot issue. RP 3-14-22
Misc
Informational
07/15/2022
Stopped by and talked with Charlie. Nothing happening on site today due to the incoming storm. He said he hasn’t heard back from the engineer yet. I told him I would check if anything was happening on our end. RP 3-21-22
Misc
Informational
07/15/2022
Stopped by and talked with Charlie. Still no word on the parking lot from the city or Charlie’s side. RP 4-6-22
Misc
Informational
07/15/2022
Building has been framed, but no work being done due to weather. Talked with Charlie, still no word on the parking lot. RP 4-12-22
Misc
Informational
07/15/2022
Stopped by and talked with Charlie. Engineers are working on a new plan for the parking lot. Charlie is hoping to have them by the end of the week. RP 4-20-22
Misc
Informational
07/15/2022
Spoke with Charlie they should have plans early next week. 4/28/22 ES
Misc
Informational
07/15/2022
Updated plans came into office on 5/3/22ES
Misc
Informational
07/15/2022
No work being performed today. 5/16/22 No outside work being performed today. Doesn’t look like parking lot is close to ready. 5/31/22 ES No work being done that needs inspections. 6/8/22 ES No work being done. The majority of the shell is completed, but parking lot work not done or prepped. 7/12/22 ES No work being done. 7/15/22 ES No work being done. 7/18/22 ES
Above Ceiling Inspection Passed 8/5/2022 8/5/2022 08/05/2022
Misc
Informational
08/05/2022
Inspection of class rooms upstairs, 2 rooms north and south, ok
Piers/Caissons Inspection - Commercial Passed 08/11/2022
Occupancy Inspection - Codes Commercial Failed 8/11/2022 8/11/2022 08/11/2022
Misc
Corrective Action Required
08/11/2022
Inspection on HT101A, HT202 AND HT203 ONLY - fire stop all penetrations in welding room - Upload information on the fire proofing on trusses in welding room - Provide engineers letter on ventilation for welding room. OK to put in funiture in class rooms: HT101A, HT202, HT203
Sprinkler - Hydrostatic Test Passed 9/26/2022 09/27/2022
Water Service Inspection Passed 09/18/2023
Occupancy Inspection - Engineering Passed 9/18/2023 9/18/2023 09/18/2023
Misc
Informational
09/18/2023
9-18-23 DP. This project has been completed from my standpoint. Passed.
Occupancy Inspection - Planning Passed 9/18/2023 9/18/2023 09/18/2023
Occupancy Inspection - Codes Commercial Failed 9/18/2023 9/18/2023 09/18/2023
Misc
Corrective Action Required
08/11/2022
Inspection on HT101A, HT202 AND HT203 ONLY - fire stop all penetrations in welding room - Upload information on the fire proofing on trusses in welding room - Provide engineers letter on ventilation for welding room. OK to put in funiture in class rooms: HT101A, HT202, HT203
Misc
Corrective Action Required
09/18/2023
Paint shop - open Jbox in second floor mecanical room - provide gas piping pressure certificate or set up test - secure electrical conduit at Noth East entrance
Occupancy Inspection - Water Utilities Passed 9/18/2023 9/18/2023 09/19/2023
Erosion Control Inspection Residential Passed 09/25/2023
In-wall Inspection Passed 09/26/2023
Misc
Resolved
09/26/2023
-rough framing and electrical for welding room -5/20/22 framing and electrical inspection for rooms HT202, HT203
Occupancy Inspection - Codes Commercial Ready for Temp CO 9/26/2023 9/26/2023 09/26/2023
Misc
Resolved
09/26/2023
Misc
Resolved
11/20/2023
Paint shop - gas piping pressure test
Alarm Test Passed 09/26/2023
Sprinkler - Hydrostatic Test Passed 09/26/2023
Sprinkler - Flow Test Passed 09/26/2023
Alarm Test Passed 09/26/2023
Occupancy Inspection - Fire Temporary C of O 9/18/2023 9/18/2023 09/26/2023
Gas Service Inspection - Commercial Passed 9/27/2023 09/27/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 10/24/2023
Misc
Resolved
09/27/2023
Paint shop - gas piping pressure test
Erosion Control Inspection Passed 11/20/2023 11/20/2023
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Occupancy Inspection - Codes Commercial Full C of O 11/20/2023 11/20/2023
Occupancy Inspection - Fire Passed 11/20/2023 11/20/2023
Documents & Images
Date Uploaded File Type Document Name
09/22/2021 Application Form 210924_MCC LV HT_License Tax Form
09/22/2021 Application Form 210924_MCC LV HT_Commercial Permit Application
09/24/2021 Specifications 210924_MCC LV HT_Project Manual
09/24/2021 Plans 210924_MCC LV HT_Drawings
09/27/2021 Letter Fire Building Plan Review
10/04/2021 Letter DS P/R Corrections Document
12/08/2021 Letter 211201_MCC LV HT_Permit & FDP Resubmission Responses
12/08/2021 Application Form 211201_MCC LV HT_Commercial Permit Application_Resubmission
12/08/2021 Plans 211201_MCC LV HT_Permit & FDP Resubmission Drawings
12/08/2021 Letter Fire Building Plan Review
12/30/2021 Plans 211228_MCC LV HT_Drawings_Conformed
12/30/2021 Approved Plans approved - 211228_MCC LV HT_Drawings_Conformed
01/03/2022 Receipt Receipt for transaction:2022-000015
12/28/2021 Approved Plans Approved FDP_122821_Longview MCC Bldg Addition & Renovation
01/04/2022 Letter DS Building Permit
02/07/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/21/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/25/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/16/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/21/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/26/2022 Approved Plans FDP Approved_REV SET_C001-002_042622_220421_MCC LV HT_C001 & C002 Updated0
04/27/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/06/2022 MCC Longview Add Reno - Calculations
05/06/2022 MCC Longview Add Reno - FP1
05/06/2022 Letter Fire (Sprinkler) Plan Review
05/16/2022 Letter INSPECTION SUMMARY
05/20/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
10/12/2022 Drawing MCC - Longview - High Technology TLS Signed
10/12/2022 Letter Fire (Alarm) Plan Review Notice
09/18/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/25/2023 LV Automotive Welding Room Truss Fire Proofing Submittal
09/26/2023 Letter INSPECTION SUMMARY
09/26/2023 Certificate/License Codes Temporary Certificate of Occupancy
09/26/2023 Receipt Receipt for transaction:2023-007331
09/27/2023 Letter INSPECTION SUMMARY
10/24/2023 City of Lees Summit TCO extension request
10/25/2023 Certificate/License Codes Temporary Certificate of Occupancy
10/25/2023 Receipt Receipt for transaction:2023-008050
11/20/2023 Letter INSPECTION SUMMARY
11/20/2023 Letter Field Certificate of Occupancy
11/20/2023 Letter Codes Final Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy309
12/20/2023 Codes Temporary Certificate of Occupancy309
12/20/2023 Codes Temporary Certificate of Occupancy320
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home