Permit Application Status

PRCOM20204028


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20204028
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
ALTERATIONS TO EXISTING POLICE STATION THAT INCLUDES ADDED SQUARE FOOTAGE TO UPPER LEVEL BY ADDING FLOOR SPACE OVER OPEN AREA
10/29/2020
01/04/2021
10/07/2021
Locations
Contacts
TURNER CONSTRUCTION COMPANY, Address:1220 WASHINGTON STE 1000, Phone:(816) 283-0555  
Kruse Corporation, Address:3636 N. Topeka St, Phone:(816) 686-0498  
PRO ELECTRIC LC, Address:510 MIAMI AVE, Phone:(913) 621-6611  
RODRIGUEZ MECHANICAL CONTRACTORS INC, Address:541 S 11TH ST, Phone:(913) 281-1814  
HOEFER WYSOCKI, Address:11460 TOMAHAWK CREEK PARKWAY, Phone:(913) 307-3700  
bstufflebean@tcco.com, Address:bstufflebean@tcco.com  
CITY OF LEES SUMMIT, Address:207 SW MARKET ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 02/10/2021 02/10/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/10/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test.
Licensed Contractors Approved 11/12/2020 12/28/2020
Joe Frogge
LC - General Contractor
Resolved
12/28/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Resolved
12/28/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/12/2020 11/05/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/03/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide PE stamped electronic shop drawings for any modifications to the fire alarm system to mike.weissenbach@cityofls.net Note: Fire alarm to be operational during construction
Construction documents - Fire protection systems
Corrective Action Required
11/03/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide PE stamped electronic shop drawings for any modifications to the fire sprinkler system to mike.weissenbach@cityofls.net Note: Fire sprinkler system to be operational during construction.
Installation acceptance testing
Corrective Action Required
11/03/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Approved 11/12/2020 11/05/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $14,000.00 $14,000.00 Paid 01/04/2021
$0.00
7232302-Commercial License Tax Fee $2,392.50 $2,392.50 Paid 12/22/2020
$2,392.50
8331507-Sewer Connection Fee $150.00 $150.00 Paid 01/04/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 1/28/2021 1/28/2021 01/28/2021
Misc
Informational
01/28/2021
- ROOM M43 OK TO ROCK -
In-wall Inspection Partial 1/29/2021 1/29/2021 01/29/2021
Misc
Corrective Action Required
01/29/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 -
In-wall Inspection Partial 2/5/2021 2/5/2021 02/05/2021
Misc
Corrective Action Required
01/29/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M38,M39,M40- - M36 FIRE CAULK CONDUIT AT BOTTOM PLATE -
In-wall Inspection Partial 2/9/2021 2/9/2021 02/09/2021
Misc
Informational
02/09/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40-
In-wall Inspection Partial 2/11/2021 2/11/2021 02/11/2021
Misc
Informational
02/09/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, -
Above Ceiling Inspection Partial 2/18/2021 2/17/2021 02/17/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/17/2021
- ROOM M42 COURT ENTRYWAY -
In-wall Inspection Partial 2/17/2021 2/17/2021 02/17/2021
Misc
Informational
02/11/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 -
Above Ceiling Inspection Partial 2/18/2021 02/18/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/17/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM -
In-wall Inspection Partial 2/19/2021 2/19/2021 02/19/2021
Misc
Informational
02/18/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 -
In-wall Inspection Partial 2/22/2021 2/22/2021 02/22/2021
Misc
Informational
02/19/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, -
In-wall Inspection Partial 2/23/2021 02/23/2021
Misc
Informational
02/22/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING -
Underslab Plumbing Inspection - Commercial Partial 2/23/2021 2/23/2021 02/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/23/2021
- CORRIDOR E 147 DRINKING FOUNTAINS -
In-wall Inspection Partial 3/1/2021 3/1/2021 03/01/2021
Misc
Informational
02/23/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, -
Miscellaneous Inspection Passed 3/3/2021 3/3/2021 03/03/2021
Misc
Informational
03/03/2021
- ROOM M43 TRAINING ROOM - - OK TO OCCUPY THIS ROOM -
Above Ceiling Inspection Partial 3/9/2021 3/9/2021 03/09/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/18/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 -
Above Ceiling Inspection Partial 3/15/2021 3/15/2021 03/15/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/09/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 -
Rough Electrical Inspection - Commercial Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/19/2021
- ROOM E 130 TRANSFORMER & SERVICE PANELS -
Above Ceiling Inspection Partial 3/19/2021 3/19/2021 03/19/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/15/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,-
Above Ceiling Inspection Partial 3/29/2021 3/29/2021 03/29/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/19/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 -
Underslab Plumbing Inspection - Commercial Partial 5/4/2021 5/4/2021 05/04/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/23/2021
- CORRIDOR E 147 DRINKING FOUNTAINS - - K-9 ROOM LOWER LEVEL FLOOR DRAINS -
Suspended Slab Inspection Partial 5/11/2021 05/11/2021
Misc
Informational
05/11/2021
MAIN FLOOR LOBBY AREA
Underslab Plumbing Inspection - Commercial Partial 5/11/2021 5/11/2021 05/11/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/04/2021
- CORRIDOR E 147 DRINKING FOUNTAINS - - K-9 ROOM LOWER LEVEL FLOOR DRAINS - - WOMEN'S LOCKER ROOM SHOWER, KITCHEN & BREAKROOM -
In-wall Inspection Partial 5/25/2021 5/25/2021 05/25/2021
Misc
Informational
03/01/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 -
Underslab Plumbing Inspection - Commercial Passed 6/2/2021 06/02/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/11/2021
- CORRIDOR E 147 DRINKING FOUNTAINS - - K-9 ROOM LOWER LEVEL FLOOR DRAINS - - WOMEN'S LOCKER ROOM SHOWER, KITCHEN & BREAKROOM -
Suspended Slab Inspection Passed 6/2/2021 06/02/2021
Misc
Informational
05/11/2021
MAIN FLOOR LOBBY AREA
In-wall Inspection Partial 6/2/2021 06/02/2021
Misc
Informational
05/25/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 - - BREAK ROOM @ COUNTERTOP -
In-wall Inspection Partial 6/11/2021 6/11/2021 06/11/2021
Misc
Informational
06/02/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 - - BREAK ROOM @ COUNTERTOP - - ROOMS M15 THRU M19 -
Above Ceiling Inspection Partial 6/21/2021 6/21/2021 06/21/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/29/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 -
Above Ceiling Inspection Partial 6/23/2021 6/23/2021 06/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
06/21/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 -
Above Ceiling Inspection Partial 6/28/2021 6/28/2021 06/28/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
06/23/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS -
In-wall Inspection Partial 7/2/2021 7/2/2021 07/02/2021
Misc
Informational
06/11/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 - - BREAK ROOM @ COUNTERTOP - - ROOMS M15 THRU M19 - - ROOM L20, L21 -
Above Ceiling Inspection Partial 7/8/2021 7/8/2021 07/08/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
06/28/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID -
Above Ceiling Inspection Partial 7/9/2021 7/9/2021 07/09/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/08/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID - - BREAK ROOM -
In-wall Inspection Partial 7/13/2021 7/13/2021 07/13/2021
Misc
Informational
07/02/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 - - BREAK ROOM @ COUNTERTOP - - ROOMS M15 THRU M19 - - ROOM L20, L21 - - L22 -
Above Ceiling Inspection Partial 7/13/2021 7/13/2021 07/13/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/09/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID - - BREAK ROOM - - L23, M15,M16, -
Above Ceiling Inspection Partial 7/21/2021 7/21/2021 07/21/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/13/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID - - BREAK ROOM - - L23, M15,M16, - - L02, L03, L06, L18, L19 -
Above Ceiling Inspection Partial 7/29/2021 7/29/2021 07/29/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/21/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID - - BREAK ROOM - - L23, M15,M16, - - L02, L03, L06, L18, L19 - - L27 -
Above Ceiling Inspection Passed 7/30/2021 7/30/2021 07/30/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/29/2021
- ROOM M42 COURT ENTRYWAY - - M43 TRAINING ROOM - - M04,M05,M06,M07,M08,M09,M10,M11,M12,M13,M14 - - L08,L11,L12,L13,L14,L15,L16,M32,E221 - - M34,M35,M36,L28,L29,L30,L31,L32,L33,L34,L35,L36,- - M39,M40 - - M21 THRU M25 - - M28 - - MENS & WOMENS LOCKER ROOMS - - CORRIDOR M30, L21 KITCHEN HARD LID - - BREAK ROOM - - L23, M15,M16, - - L02, L03, L06, L18, L19 - - L27 - - L22 -
Occupancy Inspection - Codes Commercial Failed 8/11/2021 8/11/2021 08/11/2021
Misc
Corrective Action Required
08/11/2021
LAND MC CABLE IN BACKORDERED SIGN @ REAR ENTRANCE NEAR GARAGE
In-wall Inspection Passed 8/11/2021 08/11/2021
Misc
Informational
07/13/2021
- ROOM M43 - - ROOMS M04,M05,M06,M07,M09,M10,M11,M12 - - ROOMS M32,M33,M34,M35,M36, M38,M39,M40- - ROOMS L11,L12,L13,L14,L15, - - ROOMS L10,L16,L17 - - ROOMS M42,L36,L35,L34,L33,L32,L31,L30,L29 - - ROOM L28, - - ROOM M34 IN WALL PLUMBING - - ROOM M07, - - ROOMS M-21 THRU M-27, M-29, E-241, E -249 - - BREAK ROOM @ COUNTERTOP - - ROOMS M15 THRU M19 - - ROOM L20, L21 - - L22 -
Rough Electrical Inspection - Commercial Passed 8/11/2021 08/11/2021
Misc
Informational
03/19/2021
- ROOM E 130 TRANSFORMER & SERVICE PANELS -
Rough Plumbing Inspection - Commercial Passed 8/11/2021 08/11/2021
Occupancy Inspection - Fire Failed 8/11/2021 8/11/2021 08/11/2021
Corrective Action Required
08/11/2021
1. Cover East side of South waiting room exit sign. 2. Sprinkler System out of date, need annual inspection. 3. Synchronize strobes for the alarm system. 4. Add chevron to exit sign in basement. x2 5. Remove exit sign by small break room. 6. Strobe in dispatch did not work.
Alarm Test Failed 8/11/2021 08/11/2021
Corrective Action Required
08/11/2021
1. Synchronize strobes for the alarm system. 2. Strobe in dispatch did not work. 3. Alarm was not received by the fire department dispatch. 4. FACP labeled with panel # and breaker #. 5. Breaker labeled FACP.
Occupancy Inspection - Codes Commercial Temporary C of O 8/23/2021 8/23/2021 08/23/2021
Misc
Corrective Action Required
08/11/2021
LAND MC CABLE IN BACKORDERED SIGN @ REAR ENTRANCE NEAR GARAGE
Final Plumbing Inspection - Commercial Passed 10/7/2021 10/07/2021
Final Mechanical Inspection Passed 10/7/2021 10/07/2021
Final Electrical Inspection - Commercial Passed 10/7/2021 10/07/2021
Occupancy Inspection - Codes Commercial Full C of O 10/7/2021 10/07/2021
Misc
Resolved
10/07/2021
Documents & Images
Date Uploaded File Type Document Name
10/29/2020 Specifications Lee's Summit Specifications Combined
10/29/2020 Plans Lee's Summit Drawings Combined
10/29/2020 Application Form Commercial Permit Application
11/05/2020 Letter Fire Building Plan Review
12/28/2020 Approved Plans approved - Lee's Summit Drawings Combined
01/04/2021 Receipt Receipt for transaction: 2021-000016
01/04/2021 Letter DS Building Permit
01/28/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
02/05/2021 Letter INSPECTION SUMMARY
02/09/2021 Letter INSPECTION SUMMARY
02/09/2021 Letter Codes Plan Review Conditions
02/10/2021 Letter Fire (Sprinkler) Plan Review
02/11/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/17/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
03/01/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/09/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter INSPECTION SUMMARY
06/23/2021 Letter INSPECTION SUMMARY
06/28/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
07/08/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter Fire Loss Reduction Form
08/11/2021 Letter Fire Loss Reduction Form
08/23/2021 Letter Codes Temporary Certificate of Occupancy
10/07/2021 Letter Codes Final Certificate of Occupancy
10/07/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter Field Certificate of Occupancy
10/14/2021 Letter INSPECTION SUMMARY
04/28/2022 Drawing Electrical_Red_Line_As_Builts-pgs-12_13_14
04/28/2022 Plans as-built Justice-Center-renovation_production_merged
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home