Permit Application Status

PRCOM20203516


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20203516
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
ADDITION COMMERCIAL
RENOVATION TO EXISTING OUTDOOR STADIUM FACILITIES WHICH WILL INCLUDE EXPANSION OF EXISTING PRESS BOX; CONSTRUCTION OF NEW RESTROOMS, CONCESSIONS, AND TICKET BOOTHS; AND CONSTRUCTION OF NEW BLEACHER SEATING
10/05/2020
01/14/2021
04/21/2021
11/05/2021
Locations
Contacts
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Monarch Build, LLC, Address:8100 Newton Street Ste 300, Phone:(913) 942-2400  
GOULD EVANS, Address:4041 MILL STREET, Phone:(816) 701-5315  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
PRO DESIGN CONTRACTORS LLC, Address:918 E WARREN ST, Phone:(913) 308-6900  
james.mowdy@monarch.build, Address:james.mowdy@monarch.build  
CITY WIDE SHEET METAL, INC, Address:2820 G ROE LN, Phone:(913) 871-7464  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 06/14/2021 06/14/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/14/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Approved with Conditions 11/17/2020 01/14/2021
Mike Weisenborn
Final Development Plan
Resolved
01/14/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
IPC 403.1 Minimum number of fixtures
Resolved
11/11/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Insufficient number of fixtures provided. CMR has been submitted. 11/11/20 - cmr approved
Health Dept Review
Resolved
12/16/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
11/10/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
11/10/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
11/10/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
11/10/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
IBC 1209.2 Finish materials
Resolved
11/11/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Modify drawings to show compliant wall finish materials at water closets and mop sink. If paint is used it must be epoxy based.
Licensed Contractors Approved 11/17/2020 01/14/2021
Mike Weisenborn
LC - General Contractor
Resolved
01/14/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 11/11/20 - acknowledged in letter
LC - MEP Subs
Resolved
01/14/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.general contractor. 11/11/20 - acknowledged in letter
Health Department Review Approved 12/16/2020
Joe Frogge
Fire Plan Review Approved with Conditions 11/17/2020 11/11/2020
Michael Weissenbach
Miscellaneous Correction
Resolved
11/11/2020

(Action Required) Add exterior emergency lighting outside of vestibule and stairwell from the press box.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/10/2020

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Order a Knox Box for the elevator at knoxbox.com 11/11/2020 (Verified At Inspection)
Building Plan Review Rejected 10/26/2020 10/23/2020
Joe Frogge
Final Development Plan
Corrective Action Required
10/23/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
10/23/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Insufficient number of fixtures provided. CMR has been submitted.
Health Dept Review
Corrective Action Required
10/23/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/23/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
10/23/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
10/23/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
10/23/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
IBC 1209.2 Finish materials
Corrective Action Required
10/23/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Modify drawings to show compliant wall finish materials at water closets and mop sink. If paint is used it must be epoxy based.
Licensed Contractors Rejected 10/26/2020 10/23/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
10/23/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
10/23/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.general contractor.
Fire Plan Review Approved with Conditions 10/26/2020 10/19/2020
Michael Weissenbach
Miscellaneous Correction
Corrective Action Required
10/19/2020

(Action Required) Add exterior emergency lighting outside of vestibule and stairwell from the press box.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
10/19/2020

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Order a Knox Box for the elevator at knoxbox.com
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $6,545.00 $6,545.00 Paid 01/14/2021
9110081-Paved Surface Inspection Fee $2,664.79 $2,664.79 Paid 01/14/2021
9110071-Site Grading Fee $948.87 $948.87 Paid 01/14/2021
9110068-Storm Fee $155.76 $155.76 Paid 01/14/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 3/23/2021 (11:30) 3/23/2021 03/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/23/2021
- ELEVATOR PIT & FOOTING IN EXISTING BLDG -
Underslab Plumbing Inspection - Commercial Partial 3/24/2021 3/24/2021 03/24/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/24/2021
- UNDERSLAB PLUMBING IN FORMER CONCESSION STAND/ COACHES LOCKER ROOM -
Underslab Plumbing Inspection - Commercial Partial 4/1/2021 4/1/2021 04/01/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/24/2021
- UNDERSLAB PLUMBING IN FORMER CONCESSION STAND/ COACHES LOCKER ROOM - - UNDERSLAB PLUMBING NEW CONCESSION STAND -
Underground Electrical Inspection - Commercial Partial 4/1/2021 4/1/2021 04/01/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/01/2021
UNDERGROUND CONDUIT BEHIND STADUIM TO NORTH & SOUTH TICKET BOOTHS
Underslab Electrical Inspection - Commercial Partial 4/1/2021 04/01/2021
Misc
Informational
04/01/2021
- CONNCESSION STAND, NORTH & SOUTH TICKET BOOTHS -
Underground Electrical Inspection - Commercial Partial 4/2/2021 04/02/2021
Underslab Electrical Inspection - Commercial Partial 4/2/2021 04/02/2021
Misc
Informational
04/01/2021
- NEW CONNCESSION STAND, NORTH & SOUTH TICKET BOOTHS - - UNDERGOUND CONDUIT FROM EXISITING CONCESSION STAND TO NEW CONCESSION STAND -
Underslab Plumbing Inspection - Commercial Partial 4/7/2021 4/7/2021 04/07/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
04/01/2021
- UNDERSLAB PLUMBING IN FORMER CONCESSION STAND/ COACHES LOCKER ROOM - - UNDERSLAB PLUMBING NEW CONCESSION STAND -
Underslab Electrical Inspection - Commercial Partial 4/7/2021 4/7/2021 04/07/2021
Misc
Informational
04/02/2021
- NEW CONNCESSION STAND, NORTH & SOUTH TICKET BOOTHS - - UNDERGOUND CONDUIT FROM EXISITING CONCESSION STAND TO NEW CONCESSION STAND - - UNDERSLAB CONDUIT NORTH & SOUTH STADIUM TICKET BOOTHS -
Underslab Electrical Inspection - Commercial Partial 4/8/2021 4/8/2021 04/08/2021
Misc
Informational
04/07/2021
- NEW CONNCESSION STAND, NORTH & SOUTH TICKET BOOTHS - - UNDERGOUND CONDUIT FROM EXISITING CONCESSION STAND TO NEW CONCESSION STAND - - UNDERSLAB CONDUIT NORTH & SOUTH STADIUM TICKET BOOTHS - - UNDERSLAB CONDUIT NEW CONCESSION STAND @ BASEBALL FIELDS -
In-wall Inspection Partial 4/20/2021 4/20/2021 04/20/2021
Misc
Informational
04/20/2021
- IN WALL PLUMBING FOR OLD CONNCESSION STAND AREA -
In-wall Inspection Partial 6/18/2021 6/18/2021 06/18/2021
Misc
Informational
04/20/2021
- IN WALL PLUMBING FOR OLD CONNCESSION STAND AREA - - IN WALL 2ND & 3RD FLOOR PRESS BOX -
Above Ceiling Inspection Partial 6/25/2021 06/25/2021
Misc
Corrective Action Required
06/25/2021
CONCESSION STAND SOUTH END APPROVED - EXISTING RESTROOMS NOT READY -
Above Ceiling Inspection Partial 6/28/2021 6/28/2021 06/28/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/25/2021
CONCESSION STAND SOUTH END APPROVED - EXISTING RESTROOMS NEAR LOCKER ROOMS SOUTH END OF FIELD APPROVED -
Site Visit Partial 7/2/2021 07/02/2021
Misc
Informational
07/02/2021
7-2-21 10:08 The work being done does not require inspections from me at this time.
Above Ceiling Inspection Partial 7/7/2021 7/7/2021 07/07/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/28/2021
CONCESSION STAND SOUTH END APPROVED - EXISTING RESTROOMS NEAR LOCKER ROOMS SOUTH END OF FIELD APPROVED - - CONCESSION STAND UNDER BLEACHERS, HARD LIDS NORTH & SOUTH STAIRS TO PRESS BOX -
Above Ceiling Inspection Partial 7/19/2021 7/19/2021 07/19/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/07/2021
CONCESSION STAND SOUTH END APPROVED - EXISTING RESTROOMS NEAR LOCKER ROOMS SOUTH END OF FIELD APPROVED - - CONCESSION STAND UNDER BLEACHERS, HARD LIDS NORTH & SOUTH STAIRS TO PRESS BOX - - HARD LID AT ELEVATOR 1ST FLOOR, PRESS BOX 2ND FLOOR -
Footing Inspection - Commercial Partial 7/19/2021 7/19/2021 07/19/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
03/23/2021
- ELEVATOR PIT & FOOTING IN EXISTING BLDG - - HOME BLEACHERS COLUMNS & PADS, A LINE 4 SOUTH 4 NORTH, B LINE 3 SOUTH 3 NORTH -
Piers/Caissons Inspection - Commercial Partial 7/20/2021 7/20/2021 07/20/2021
Misc
Informational
07/20/2021
- (1) PIER & PAD SOUTH END, (1) PIER & PAD NORTH END - PREVIOUS PIERS CALLED IN AS FOOTING
Miscellaneous Inspection Failed 8/6/2021 08/06/2021
Miscellaneous Correction
Corrective Action Required
08/06/2021
: PRE FINAL MEP FINAL REQUESTED : 8/6/21 pre final MEP final Concession stand south end of football field Complete open J boxes Complete light fixtures canopy Complete gutters & roof drains Women's Restroom in former concession stand Provide missing cover plates electrical Check city approved plans on ADA sinks in this room Men's restroom 18" vertical grab bar SOUTH TICKET BOOTH Install Backordered light fixtures or provide cover plates on open J boxes Label service panels Complete roof drains NORTH TICKET BOOTH Install backordered light fixtures or provide cover plates open J boxes Label service panels Complete roof drains CONCESSION STAND UNDER BLEACHERS Complete wiring at service panels Label service panels Provide GFCI protection next to 3 compartment sink Cover plate light switch at elevator Guard under stairway 2ND FLOOR PRESS BOX Install fixtures or cover plates in open J boxes 3RD FOOR No power to check GFCI Install missing fixtures or provide cover plates open J boxes
Underslab Plumbing Inspection - Commercial Passed 8/23/2021 08/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
04/07/2021
- UNDERSLAB PLUMBING IN FORMER CONCESSION STAND/ COACHES LOCKER ROOM - - UNDERSLAB PLUMBING NEW CONCESSION STAND -
Underslab Electrical Inspection - Commercial Passed 8/23/2021 08/23/2021
Misc
Informational
04/08/2021
- NEW CONNCESSION STAND, NORTH & SOUTH TICKET BOOTHS - - UNDERGOUND CONDUIT FROM EXISITING CONCESSION STAND TO NEW CONCESSION STAND - - UNDERSLAB CONDUIT NORTH & SOUTH STADIUM TICKET BOOTHS - - UNDERSLAB CONDUIT NEW CONCESSION STAND @ BASEBALL FIELDS -
Underground Electrical Inspection - Commercial Passed 8/23/2021 08/23/2021
Piers/Caissons Inspection - Commercial Passed 8/23/2021 08/23/2021
Misc
Informational
07/20/2021
- (1) PIER & PAD SOUTH END, (1) PIER & PAD NORTH END - PREVIOUS PIERS CALLED IN AS FOOTING
Miscellaneous Inspection Passed 8/23/2021 08/23/2021
Miscellaneous Correction
Resolved
08/23/2021
In-wall Inspection Passed 8/23/2021 08/23/2021
Misc
Informational
06/18/2021
- IN WALL PLUMBING FOR OLD CONNCESSION STAND AREA - - IN WALL 2ND & 3RD FLOOR PRESS BOX -
Footing Inspection - Commercial Passed 8/23/2021 08/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
07/19/2021
- ELEVATOR PIT & FOOTING IN EXISTING BLDG - - HOME BLEACHERS COLUMNS & PADS, A LINE 4 SOUTH 4 NORTH, B LINE 3 SOUTH 3 NORTH -
Above Ceiling Inspection Passed 8/23/2021 08/23/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
07/19/2021
CONCESSION STAND SOUTH END APPROVED - EXISTING RESTROOMS NEAR LOCKER ROOMS SOUTH END OF FIELD APPROVED - - CONCESSION STAND UNDER BLEACHERS, HARD LIDS NORTH & SOUTH STAIRS TO PRESS BOX - - HARD LID AT ELEVATOR 1ST FLOOR, PRESS BOX 2ND FLOOR -
All Rough Inspection - Commercial Passed 8/23/2021 08/23/2021
Occupancy Inspection - Codes Commercial Temporary C of O 8/23/2021 8/23/2021 08/23/2021
Misc
Corrective Action Required
08/23/2021
WOMEN'S RESTROOM N5-103 SOUTH END OF FIELD PROVIDE ADA SINKS PER PLAN
Occupancy Inspection - Fire Temporary C of O 8/23/2021 8/23/2021 08/23/2021
Corrective Action Required
08/23/2021
Add elevator knox box. Post max occupancy sign on third floor observation deck.
Occupancy Inspection - Planning Passed 08/23/2021
Occupancy Inspection - Engineering Temporary C of O 9/23/2021 08/23/2021
Misc
Informational
08/23/2021
Temporary Occupancy can be given. 1. Vegetation of 70% needs to be established. Will check back in 30 days on9/23/21
Occupancy Inspection - Fire Passed 9/23/2021 9/23/2021 09/21/2021
Occupancy Inspection - Codes Commercial Temporary C of O 9/23/2021 9/23/2021 09/23/2021
Misc
Corrective Action Required
08/23/2021
Complete gates at ticket booths Provide vegetation behind stadium
Occupancy Inspection - Engineering Passed 10/28/2021 10/28/2021
Misc
Informational
08/23/2021
Temporary Occupancy can be given. 1. Vegetation of 70% needs to be established. Will check back in 30 days on9/23/21
Misc
Partial Correction
10/28/2021
Vegetation has been established. Full occupancy can be given.
Occupancy Inspection - Codes Commercial Full C of O 11/05/2021
Misc
Corrective Action Required
09/23/2021
Complete gates at ticket booths Provide vegetation behind stadium
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home