Permit Application Status

PRCOM20203311


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20203311
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS TO ACCOMMODATE NEW MEDICAL EQUIPMENT
09/24/2020
12/18/2020
04/17/2021
03/30/2021
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
brian.helmich@jedunn.com, Address:brian.helmich@jedunn.com  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 03/24/2021 03/24/2021
Michael Weissenbach
Misc
Corrective Action Required
03/24/2021

(Informational Purposes) Update your records showing 2018 I-series and 2016 edition NFPA 72. Note: Plans are as-builts with no additions of notification/activation devices. Alarm test not required.
Sprinkler Plan Review Released for Construction 01/13/2021 01/13/2021
Michael Weissenbach
Licensed Contractors Approved 10/23/2020 12/18/2020
Joe Frogge
LC - General Contractor
Resolved
12/18/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
12/18/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 10/23/2020 10/20/2020
Joe Frogge
Misc
Resolved
12/18/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Fire Plan Review Approved with Conditions 10/23/2020 10/19/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/19/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Hazardous material identification
Corrective Action Required
10/19/2020

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
10/19/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/19/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 10/15/2020 10/05/2020
Joe Frogge
Misc
Corrective Action Required
10/05/2020

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Licensed Contractors Rejected 10/15/2020 10/05/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
10/05/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
10/05/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/15/2020 10/02/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/02/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Hazardous material identification
Corrective Action Required
10/02/2020

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
10/02/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/02/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,800.00 $2,800.00 Paid 12/18/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 1/25/2021 1/25/2021 01/25/2021
Misc
Informational
01/25/2021
- IN WALL LAB ROOM -
All Rough Inspection - Commercial Partial 2/12/2021 02/12/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/12/2021
-Electrical and framing- office 41f, break room 41d
Above Ceiling Inspection Partial 2/23/2021 2/23/2021 02/23/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/23/2021
-Office 1A041F, Break room 1A041D, Lab Storage room 1A007B
Above Ceiling Inspection Passed 03/30/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
02/23/2021
-Office 1A041F, Break room 1A041D, Lab Storage room 1A007B
All Rough Inspection - Commercial Passed 03/30/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
02/12/2021
-Electrical and framing- lab room, office 41f, break room 41d
Occupancy Inspection - Fire Passed 3/30/2021 3/30/2021 03/30/2021
Occupancy Inspection - Codes Commercial Full C of O 3/30/2021 3/30/2021 03/30/2021
Documents & Images
Date Uploaded File Type Document Name
09/24/2020 Application Form Comm Permit Application - SLE Lab
10/01/2020 Plans 3-20030_SLE Lab Analyzers - Vendor Drawings
10/01/2020 Plans old - 3-20030_SLE Lab Analyzers_CD Set
10/02/2020 Letter Fire Building Plan Review
10/05/2020 Letter License Tax Not Applicable
10/16/2020 Plans 3-20030 SLE Lab_Revised Construction Set
10/19/2020 Letter Fire Building Plan Review
10/20/2020 Letter Addendum 01
10/20/2020 Letter SLE Lab Addendum 01 - Arch Cover
10/20/2020 Approved Plans Approved - Lab Construction Set
12/18/2020 Application Form License_Tax_Application
12/18/2020 Receipt Receipt for transaction:2020-008133
12/18/2020 Letter DS Building Permit
01/13/2021 Saint Luke's East Lab Remodel
01/13/2021 Letter Fire (Sprinkler) Plan Review
01/25/2021 Letter INSPECTION SUMMARY
02/12/2021 Letter INSPECTION SUMMARY
02/12/2021 Letter Codes Plan Review Conditions
02/23/2021 Letter INSPECTION SUMMARY
03/24/2021 Plans Permit PRCOM20203311 Stamped Fire Alarm Plans for City Review
03/24/2021 Letter Fire (Alarm) Plan Review Notice
03/30/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter Codes Final Certificate of Occupancy
03/30/2021 Letter Field Certificate of Occupancy
03/30/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home