Permit Application Status

PRCOM20202733


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20202733
Building Permit - Commercial
Certificate of Occupancy
ALTERATION COMMERCIAL
ALTER BAY IN EXISTING GARAGE TO BECOME MAINTENANCE ROOM
09/01/2020
09/16/2020
12/16/2020
Locations
Contacts
GRIFFIN RILEY PROPERTY GROUP, Address:21 SE 29TH TER, Phone:(816) 366-7900  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Jake Loveless-Griffin Riley Property Group, Phone:(916) 366-7900  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/15/2020 09/16/2020
Joe Frogge
LC - General Contractor
Resolved
09/16/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Resolved
09/16/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 09/15/2020 09/02/2020
Joe Frogge
Fire Plan Review Approved with Conditions 09/15/2020 09/02/2020
Michael Weissenbach
Portable fire extinguishers - general
Corrective Action Required
09/02/2020

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. (Verified At Inspection) Provide 2 2A10BC Fire Extinguishers.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $50.00 $50.00 Paid 09/16/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Electrical Inspection - Commercial Passed 9/21/2020 9/21/2020 09/21/2020
Electrical Service Inspection Passed 11/13/2020 11/13/2020 11/13/2020
Final Electrical Inspection - Commercial Passed 11/18/2020 11/18/2020 11/18/2020
Occupancy Inspection - Codes Commercial Full C of O 12/16/2020
Documents & Images
Date Uploaded File Type Document Name
09/01/2020 Plans 20050_200901_Echelon Maint_permit set
09/02/2020 Letter Fire Building Plan Review
09/02/2020 Application Form 200831_Echelon_Building Permit Application
09/02/2020 Approved Plans approved - Echelon Maint_permit set
09/16/2020 Email RE Echelon maintenance room - PRCOM20202733
09/16/2020 Receipt Receipt for transaction:2020-006275
09/16/2020 Letter DS Building Permit
09/21/2020 Letter INSPECTION SUMMARY
11/13/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter Field Certificate of Occupancy
12/16/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home