Summary
PRCOM20192696
Building Permit - Commercial
Final Completion
B & D BUSINESS HOLDINGS LLC
NEW OTHER (COMMERCIAL)
NEW FUEL TANKS - GAS AND DIESEL *drawings are in plan review file
09/20/2019
02/11/2020
03/28/2020
02/03/2021
Locations
Contacts
B & D BUSINESS HOLDINGS LLC, Address:24000 W 43RD STREET  
DOUBLE CHECK COMPANY INC, Address:PO BOX 300347, Phone:(816) 921-5032  
COLEMAN EQUIPMENT, Address:4101 NE LAKEWOOD WAY, Phone:(816) 254-5100  
  
FATBOY ELECTRIC INC, Address:P O BOX 300198, Phone:(816) 861-6600  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 02/25/2020 02/20/2020
Joe Frogge
Fire Plan Review Approved with Conditions 02/25/2020 02/18/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/18/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational purposes) Call (816)969-1300 to test emergency shutoff.
Misc
Corrective Action Required
02/18/2020

(Informational Purposes) Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place. 2/18/20 Verified At Inspection
Building Plan Review Approved 02/13/2020 02/07/2020
Joe Frogge
Misc
Resolved
02/07/2020

2017 NEC Article 500.1 Scope – Articles 500 Through 504. Articles 500 through 504 cover the requirements for electrical and electronic equipment and wiring for all voltages in Class I, Divisions 1 and 2; Class II, Divisions 1 and 2; and Class III, Divisions 1 and 2 locations where fire or explosion hazards may exist due to flammable gases, flammable liquid-produces vapors, combustible liquid-produced vapors, combustible liquid-produced vapors, combustible dusts, or ignitable fibers/flyings. (see code for additional information and specific requirements) Action required: Provide detailed electrical design/spec for installations in class 1 div 1 areas.
Fire Plan Review Approved with Conditions 02/13/2020 02/07/2020
Joe Frogge
Installation acceptance testing
Corrective Action Required
02/06/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational purposes) Call (816)969-1300 to test emergency shutoff.
Misc
Corrective Action Required
02/06/2020

(Informational Purposes) Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place.
Licensed Contractors Approved 02/13/2020 02/06/2020
Development Center
LC - MEP Subs
Resolved
02/06/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 10/04/2019 09/23/2019
Joe Frogge
Misc
Corrective Action Required
09/23/2019

2017 NEC Article 500.1 Scope – Articles 500 Through 504. Articles 500 through 504 cover the requirements for electrical and electronic equipment and wiring for all voltages in Class I, Divisions 1 and 2; Class II, Divisions 1 and 2; and Class III, Divisions 1 and 2 locations where fire or explosion hazards may exist due to flammable gases, flammable liquid-produces vapors, combustible liquid-produced vapors, combustible liquid-produced vapors, combustible dusts, or ignitable fibers/flyings. (see code for additional information and specific requirements) Action required: Provide detailed electrical design/spec for installations in class 1 div 1 areas.
Licensed Contractors Rejected 10/04/2019 09/23/2019
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/23/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/04/2019 09/23/2019
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
09/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational purposes) Call (816)969-1300 to test emergency shutoff.
Misc
Corrective Action Required
09/23/2019

(Informational Purposes) Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $90.00 $90.00 Paid 02/11/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/11/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Not Ready 2/25/2020 2/25/2020 at 1:15 PM 02/25/2020
Underground Electrical Inspection - Commercial Passed 2/26/2020 2/26/2020 at 10:35 AM 02/26/2020
Final Inspection - Commercial Failed 3/12/2020 3/12/2020 at 9:50 AM 03/12/2020
Misc
Corrective Action Required
03/12/2020
FIRE APPROVAL REQUIRED
Occupancy Inspection - Fire Passed 3/20/2020 03/20/2020
Final Inspection - Commercial Passed 02/03/2021
Misc
Resolved
02/03/2021
FIRE APPROVAL REQUIRED
Documents & Images
Date Uploaded File Type Document Name
09/23/2019 Letter Fire Building Plan Review
09/23/2019 Letter DS P/R Corrections Document
02/11/2020 Receipt Receipt for transaction: 2020-000545
02/11/2020 Letter DS Building Permit
02/18/2020 Letter Fire Building Plan Review
02/25/2020 Letter INSPECTION SUMMARY
02/26/2020 Letter INSPECTION SUMMARY
03/11/2020 Receipt Receipt for transaction: 2020-001116
03/12/2020 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home