Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved
|
02/25/2020
|
02/20/2020
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
02/25/2020
|
02/18/2020
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational purposes)
Call (816)969-1300 to test emergency shutoff.
|
|
Misc
Corrective Action Required
(Informational Purposes)
Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place.
2/18/20
Verified At Inspection
|
|
|
Building Plan Review
|
Approved
|
02/13/2020
|
02/07/2020
|
|
Joe Frogge
|
|
Misc
2017 NEC Article 500.1 Scope – Articles 500 Through 504. Articles 500 through 504 cover the requirements for electrical and electronic equipment and wiring for all voltages in Class I, Divisions 1 and 2; Class II, Divisions 1 and 2; and Class III, Divisions 1 and 2 locations where fire or explosion hazards may exist due to flammable gases, flammable liquid-produces vapors, combustible liquid-produced vapors, combustible liquid-produced vapors, combustible dusts, or ignitable fibers/flyings. (see code for additional information and specific requirements)
Action required: Provide detailed electrical design/spec for installations in class 1 div 1 areas.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
02/13/2020
|
02/07/2020
|
|
Joe Frogge
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational purposes)
Call (816)969-1300 to test emergency shutoff.
|
|
Misc
Corrective Action Required
(Informational Purposes)
Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place.
|
|
|
Licensed Contractors
|
Approved
|
02/13/2020
|
02/06/2020
|
|
Development Center
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Building Plan Review
|
Rejected
|
10/04/2019
|
09/23/2019
|
|
Joe Frogge
|
|
Misc
Corrective Action Required
2017 NEC Article 500.1 Scope – Articles 500 Through 504. Articles 500 through 504 cover the requirements for electrical and electronic equipment and wiring for all voltages in Class I, Divisions 1 and 2; Class II, Divisions 1 and 2; and Class III, Divisions 1 and 2 locations where fire or explosion hazards may exist due to flammable gases, flammable liquid-produces vapors, combustible liquid-produced vapors, combustible liquid-produced vapors, combustible dusts, or ignitable fibers/flyings. (see code for additional information and specific requirements)
Action required: Provide detailed electrical design/spec for installations in class 1 div 1 areas.
|
|
|
Licensed Contractors
|
Rejected
|
10/04/2019
|
09/23/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
10/04/2019
|
09/23/2019
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational purposes)
Call (816)969-1300 to test emergency shutoff.
|
|
Misc
Corrective Action Required
(Informational Purposes)
Refer to Chapters 23 and 57 in the 2018 IFC for distance requirements, Placarding, and placement of emergency shutoff switch. Vehicle protection (Bollards) will need to be in place.
|
|
|