Permit Application Status

PRCOM20191809


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191809
Building Permit - Commercial
Certificate of Occupancy
WOODS CHAPEL INVESTORS LLC
NEW COMMERCIAL
NEW FAST FOOD RESTAURANT WITH DRIVE THRU
07/09/2019
09/30/2019
01/20/2020
07/01/2020
Locations
Contacts
BEAR CONSTRUCTION SERVICES, Address:9218 METCALF #311, Phone:(913) 674-8004  
ATLAS MECHANICAL SERVICES INC, Address:26015 RA HWY, Phone:(913) 708-4695  
INTEGRITY PLUMBING SERVICES LLC, Address:405 SW Nelson Dr., Phone:(816) 803-9032  
GLMV ARCHITECTURE , Address:9229 WARD PKWY SUITE #210, Phone:(816) 444-4200  
WOODS CHAPEL INVESTORS LLC, Address:4520 MAIN ST STE 1600  
SECO ELECTRICAL , Address:352 S GEOSPACE DR, Phone:(913) 207-1029  
LELAND HICKS, Address:8017 HIGH DRIVE, Phone:(913) 238-0081  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 09/03/2019 09/30/2019
Joe Frogge
Final Development Plan
Resolved
09/27/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 8/28/19 - acknowledged in letter
License Tax Application
Corrective Action Required
08/26/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 8/28/19 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
08/26/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 8/28/19 - acknowledged in letter
Plan Submittal 2012 Codes
Resolved
08/28/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code analysis to show currently adopted codes.
Engineered truss package
Corrective Action Required
08/26/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Submit roof truss package or request deferral. 8/28/19 - deferred per request
Accessibility - Turning space 603.2.1
Resolved
08/28/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update design to provide 67" diameter turning spaces.
Accessibility - Lavatory clear floor space 606.2
Resolved
08/28/2019

ICC A117.1-2017 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Updated designs to provide 52" long clear floor spaces at required locations.
Plumb - Water distribution pipe 605.4
Resolved
08/28/2019

2018 IPC 605.4 Water distribution pipe. Water distribution pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule or equivalent.
Misc
Corrective Action Required
08/28/2019

comment added 8/28/19 Action required: Comment is for informational purposes. The spec section provided shows an incorrect ASTM reference for the natural gas piping. It should be D2513 per IFGC 403.6 To be field verified.
Licensed Contractors Approved 09/03/2019 09/30/2019
Mike Weisenborn
LC - General Contractor
Resolved
09/30/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 8/28/19 - acknowledged in letter
LC - MEP Subs
Resolved
09/30/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/28/19 - acknowledged in letter
Final Development Plan Review Approved 09/27/2019
Joe Frogge
Fire Plan Review Approved with Conditions 09/03/2019 09/03/2019
Joe Frogge
Posting of occupant load
Corrective Action Required
08/26/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 44
Address numbers required
Corrective Action Required
08/26/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Type I hood - Where required
Corrective Action Required
08/26/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/26/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
08/26/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Panic and fire exit hardware
Corrective Action Required
08/26/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection)
Health Department Review Approved 08/20/2019
Joe Frogge
Building Plan Review Rejected 07/23/2019 07/16/2019
Joe Frogge
Final Development Plan
Corrective Action Required
07/16/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
07/16/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Health Dept Review
Resolved
08/20/2019

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
07/16/2019

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Plan Submittal 2012 Codes
Corrective Action Required
07/16/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code analysis to show currently adopted codes.
Engineered truss package
Corrective Action Required
07/16/2019

Copies of the engineered truss package were not provided at the time of permit application. Action required: Submit roof truss package or request deferral.
Accessibility - Turning space 603.2.1
Corrective Action Required
07/16/2019

ICC A117.1-2017 Section 304.3 Size. Turning spaces shall comply with Section 304.3.1 or 304.3.2. 304.3.1 Circular Space. 304.3.1.1 New Buildings and facilities. In new buildings and facilities, the turning space shall be a circular space with a 67-inch minimum diameter. (see code for information regarding allowed overlapping) 304.3.1.2 Existing buildings and facilities. In existing buildings and facilities, the turning space shall be a circular space with a 60-inch minimum diameter. (see code for information regarding allowed overlapping) Action required: Update design to provide 67" diameter turning spaces.
Accessibility - Lavatory clear floor space 606.2
Corrective Action Required
07/16/2019

ICC A117.1-2017 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Updated designs to provide 52" long clear floor spaces at required locations.
Plumb - Water distribution pipe 605.4
Corrective Action Required
07/16/2019

2018 IPC 605.4 Water distribution pipe. Water distribution pipe and tubing shall conform to NSF 61 and shall conform to one of the standards listed in Table 605.4. Hot water distribution pipe and tubing shall have a pressure rating of not less than 100 psi at 180degF. 2018 IPC 702.1 Above-ground sanitary drainage and vent pipe. Above-ground soil, waste and vent pipe shall conform to one of the standards listed in Table 702.1 2018 IPC 702.2 Underground building sanitary drainage and vent pipe. Underground building sanitary drainage and vent pipe shall conform to one of the standards listed in Table 702.2. Action required: Provide pipe material schedule or equivalent.
Licensed Contractors Rejected 07/23/2019 07/16/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
07/16/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
07/16/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 07/23/2019 07/11/2019
Michael Weissenbach
Posting of occupant load
Corrective Action Required
07/11/2019

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 44
Address numbers required
Corrective Action Required
07/11/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Type I hood - Where required
Corrective Action Required
07/11/2019

2018 IFC 609.2- Where required. A Type I hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/11/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection)
Duct smoke detectors
Corrective Action Required
07/11/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection)
Panic and fire exit hardware
Corrective Action Required
07/11/2019

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Verified At Inspection)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $1,800.00 $1,800.00 Paid 09/24/2019
8331507-Sewer Connection Fee $300.00 $300.00 Paid 09/24/2019
Commercial Excise Tax Fee $25,162.50 $25,162.50 Paid 12/23/2019
8331506-EFHB Maybrook, Full $426.10 $426.10 Paid 09/24/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 04/08/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Failed 10/1/2019 at 2:45 PM 10/01/2019
Misc
Corrective Action Required
10/01/2019
THE BUILDER FAILED TO CONTACT THE CITY FOR THE FOOTING INSPECTION AND INSTEAD LEFT A VOICE MESSAGE. AFTER TALKING TO HIM (MR. PETER), I STOPPED BY THE SITE, BUT THE FOOTING WAS ALREADY MOSTLY POURED. I CALLED HIM AND REQUESTED THAT THE ENGINEER OF RECORD MUST SUBMIT TO THE CITY THE LETTER APPROVING THE FOOTING. GROUNDING TO UFER, APPARENTLY, WAS NOT DONE
Underslab Plumbing Inspection - Commercial Failed 10/16/2019 10/16/2019 at 10:35 AM 10/16/2019
Misc
Corrective Action Required
10/16/2019
-COMPLETE PLUMBING AND PROVIDE CONTINUOUS GRAVEL SUPPORT
Underslab Plumbing Inspection - Commercial Not Ready 10/17/2019 10/17/2019 at 11:35 AM 10/17/2019
Misc
Corrective Action Required
10/16/2019
-COMPLETE PLUMBING AND PROVIDE CONTINUOUS GRAVEL SUPPORT **NO CITY APPROVED PLAN ON SITE
Footing Inspection - Commercial Failed 10/17/2019 10/17/2019 10/17/2019
Misc
Corrective Action Required
10/01/2019
THE BUILDER FAILED TO CONTACT THE CITY FOR THE FOOTING INSPECTION AND INSTEAD LEFT A VOICE MESSAGE. AFTER TALKING TO HIM (MR. PETER), I STOPPED BY THE SITE, BUT THE FOOTING WAS ALREADY MOSTLY POURED. I CALLED HIM AND REQUESTED THAT THE ENGINEER OF RECORD MUST SUBMIT TO THE CITY THE LETTER APPROVING THE FOOTING. GROUNDING TO UFER, APPARENTLY, WAS NOT DONE
Underslab Plumbing Inspection - Commercial Partial 10/18/2019 10/18/2019 at 9:55 AM 10/18/2019
Misc
Partial Correction
10/18/2019
-COMPLETE PLUMBING TO NORTH SINK -HAVE ENGINEER RESUBMIT CHANGE OF THE GREASE WASTE BUILDING DRAIN FROM 6" TO 4"
Underslab Plumbing Inspection - Commercial Partial 10/23/2019 at 2:00 PM 10/23/2019
Misc
Partial Correction
10/18/2019
-HAVE ENGINEER RESUBMIT CHANGE OF THE GREASE WASTE BUILDING DRAIN FROM 6" TO 4"
Underslab Electrical Inspection - Commercial Passed 10/23/2019 10/23/2019 at 9:10 AM 10/23/2019
Miscellaneous Inspection Failed 11/5/2019 11/5/2019 at 10:55 AM 11/05/2019
Misc
Corrective Action Required
11/05/2019
-SOUTH EXTERIOR WALL, NAIL SHEATHING ALONG EDGE W/ 10D @ 2" OC PER SHEATHING NAIL SCHEDULE DETAIL 2. -COMPLETE INSTALLING SIMPSON 30" STRAPS ALONG THE TOP PLATES
Underground Electrical Inspection - Commercial Partial 11/7/2019 at 9:40 AM 11/07/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY TWO 60' RUNS OF 4" PVC CONDUIT FROM NE OF SE CORNER OF BLDG TO E OF NE CORNER OF BLDG;
Miscellaneous Inspection Failed 11/11/2019 11/11/2019 at 10:00 AM 11/11/2019
Misc
Corrective Action Required
11/05/2019
-EXTERIOR WALL SHEATHING NAILING-OK -FOUNATION ANCHORAGE OF EXTERIOR WALL NOT READY: RODS MUST BE DRILLED DOWN INTO THE FOUNDATION WITH DEPTH PER PLAN; TIGHTEN DOWN NUT; ANCHOR SILL PLATES WITHIN 12" OF BREAKS
In-wall Inspection Failed 11/13/2019 at 2:10 PM 11/13/2019
Misc
Corrective Action Required
11/13/2019
-COMPLETE INSTALLING HD19 HOLD DOWN. TIGHTEN DOWN HOLD DOWN NUTS. ALL HOLD DOWNS RODS SHALL BE EMBBEDDED PER PLAN DETAIL 7/S.4; ANCHOR SILL PLATES WITHIN 12" OF ALL BREAKS -PROTECT PLUMBING WHERE WITHIN 1.25" OF THE WALL PLATES SURFACE -FIRE BLOCK WALL FROM ROOF SPACE
Underslab Plumbing Inspection - Commercial Passed 11/15/2019
Misc
Informational
11/15/2019
-ENGINEER LETTER OK THE CHANGE OF THE GREASE WASTE BUILDING DRAIN FROM 6" TO 4" RECEIVED
In-wall Inspection Partial 11/15/2019 11/15/2019 at 1:20 PM 11/15/2019
Misc
Corrective Action Required
11/13/2019
-ANCHOR THE KITCHEN HOOD WALL BOTTOM TRACK. FASTEN THE SHEATHING TO BOTTOM TRACK -PROTECT PLUMBING WHERE WITHIN 1.25" OF THE WALL PLATES SURFACE -FIRE BLOCK WALL FROM ROOF SPACE
Underground Electrical Inspection - Commercial Partial 11/20/2019 11/20/2019 11/20/2019
Misc
Partial Correction
11/07/2019
OK TO COVER WHEN READY: -TWO 60' RUNS OF 4" PVC CONDUIT FROM NE OF SE CORNER OF BLDG TO E OF NE CORNER OF BLDG; -WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO ~40 FT NORTH OF BUILDING
Electrical Service Inspection Failed 11/22/2019 11/22/2019 11/22/2019
Misc
Corrective Action Required
11/22/2019
INSPECTION OF JUST THE UFER CONNECTION-VERIFY THAT THE CLAMP IS LISTED REBAR GROUNDIG CLAMP TO BE BURIED IN CONCRETE. THE SCREWS&BOLT ARE NOT STAINLESS STEEL
Underground Electrical Inspection - Commercial Partial 11/22/2019 11/22/2019 11/22/2019
Misc
Partial Correction
11/20/2019
OK TO COVER WHEN READY: -TWO 60' RUNS OF SECONDARY 4" PVC CONDUIT FROM NE OF SE CORNER OF BLDG TO E OF NE CORNER OF BLDG; -WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO 5 LIGHT POLE PIERS ON WEST AND NORTH SIDES OF BUILDING
Underground Electrical Inspection - Commercial Partial 11/26/2019 11/26/2019 at 10:40 AM 11/26/2019
Misc
Partial Correction
11/22/2019
OK TO COVER WHEN READY: -TWO SETS OF SECONDARY 4" PVC CONDUIT FROM BUILDING TO TRANSFORMER; WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO 5 LIGHT POLE PIERS ON WEST AND NORTH SIDES OF BUILDING; CONDUITS TO 2 EAST LP
Underground Electrical Inspection - Commercial Partial 11/27/2019 11/27/2019 at 1:30 PM 11/27/2019
Misc
Partial Correction
11/26/2019
OK TO COVER WHEN READY: -TWO SETS OF SECONDARY 4" PVC CONDUIT FROM BUILDING TO TRANSFORMER; WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO 5 LIGHT POLE PIERS ON WEST AND NORTH SIDES OF BUILDING; CONDUITS TO 2 EAST LP; SECONDARY FROM TRANSFORMER NEAR TACO BELL TO FUTURE COFFEE SHOP
Above Ceiling Inspection Partial 12/6/2019 12/6/2019 at 2:55 PM 12/06/2019
Misc
Partial Correction
12/06/2019
ABOVE CEILING APPROVED TO COVER: -RESTROOMS AND WEST SEATING AREA SOFFIT
Gas Piping Inspection - Commercial Passed 12/13/2019 12/13/2019 12/13/2019
Hood/Duct Inspection Failed 12/13/2019 12/13/2019 at 9:55 AM 12/13/2019
Misc
Corrective Action Required
12/13/2019
-WELD HOLE ABOVE HOOD -RE-WELD THE CUT-OUT SECTION
Hood/Duct Inspection Failed 12/16/2019 12/16/2019 at 10:20 AM 12/16/2019
Misc
Corrective Action Required
12/13/2019
-RE-WELD THE CUT-OUT SECTION **CLEAN OUT MUST MEET IMC 506.3.8. HAVE ENGINEER OK THIS IF YOU STILL WANT A CLEANOUT THERE, BYUT THE CLEANOUT MUST STILL MEET 506.3.8 WITH NO SCREWS PENETRATING THE DUCT
Hood/Duct Inspection Partial 12/17/2019 12/17/2019 at 1:25 PM 12/17/2019
Misc
Partial Correction
12/17/2019
-DUCT INSPECTION-OK -1ST LAYER OF FIRE-WRAP IN PROGRESS. FIRE-WRAP NEEDS TO GO ALL THE WAY TO THE FAN BASE
Gas Service Inspection - Commercial Passed 12/18/2019
Miscellaneous Inspection Passed 12/18/2019
Misc
Resolved
12/18/2019
-EXTERIOR WALL SHEATHING NAILING-OK
Hood/Duct Inspection Passed 12/18/2019 12/18/2019
Misc
Informational
12/18/2019
-DUCT INSPECTION-OK -2ND LAYER OF FIRE-WRAP-OK
Above Ceiling Inspection Partial 12/19/2019 12/19/2019 at 1:25 PM 12/19/2019
Misc
Partial Correction
12/06/2019
ABOVE CEILING APPROVED TO COVER: -RESTROOMS AND WEST SEATING AREA SOFFIT *SECURE ALL WIRING WITHIN 12" OF ALL BOXES
In-wall Inspection Passed 12/19/2019
Misc
Resolved
12/19/2019
-ANCHOR THE KITCHEN HOOD WALL BOTTOM TRACK. FASTEN THE SHEATHING TO BOTTOM TRACK -PROTECT PLUMBING WHERE WITHIN 1.25" OF THE WALL PLATES SURFACE -FIRE BLOCK WALL FROM ROOF SPACE
Underground Electrical Inspection - Commercial Partial 12/19/2019 12/19/2019
Misc
Partial Correction
11/27/2019
OK TO COVER WHEN READY: -TWO SETS OF SECONDARY 4" PVC CONDUIT FROM BUILDING TO TRANSFORMER; WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO 5 LIGHT POLE PIERS ON WEST AND NORTH SIDES OF BUILDING; CONDUITS TO 2 EAST LP; SECONDARY FROM TRANSFORMER NEAR TACO BELL TO FUTURE COFFEE SHOP
Misc
Corrective Action Required
12/19/2019
-PROVIDE GROUNDING FOR LIGHT POLES -ONE PIER AT NORTH SIDE HAS LESS THAN 5 FT BURIAL DEPTH. HAVE ENGINEER ADDRESS
Above Ceiling Inspection Passed 12/20/2019 at 8:20 AM 12/20/2019
Misc
Resolved
12/20/2019
ABOVE CEILING APPROVED TO COVER: -RESTROOMS AND WEST SEATING AREA SOFFIT *SECURE ALL WIRING WITHIN 12" OF ALL BOXES
Electrical Service Inspection Passed 12/23/2019 12/23/2019
Misc
Resolved
12/23/2019
INSPECTION OF JUST THE UFER CONNECTION-VERIFY THAT THE CLAMP IS LISTED REBAR GROUNDIG CLAMP TO BE BURIED IN CONCRETE. THE SCREWS&BOLT ARE NOT STAINLESS STEEL
Miscellaneous Inspection Partial 12/23/2019 12/23/2019 12/23/2019
Informational
12/23/2019
WALKTHROUGH PRE-FINAL COMPLETED. BUILDING GENERALLY NOT READY. ENGINEER SHALL SUBMIT APPROVAL FOR 5 EAST SIDE LIGHT POLE PIERS, AS WELL AS THE BUILDING FOOTING, THAT WERE NOT INSPECTED BY THE CITY. LIGHT POLE GROUNDING CONNECTIONS VERIFIED.
Footing Inspection - Commercial Passed 12/27/2019
Misc
Informational
12/27/2019
-FOOTINGS APPROVED BY SPECIAL INSPECTION. LETTER PROVIDED
Occupancy Inspection - Codes Commercial Failed 12/27/2019 12/27/2019 at 9:30 AM 12/27/2019
Misc
Corrective Action Required
12/27/2019
-5 piers on east side were not inspected. Have engineer approval submitted -Approval from the following departments required: Fire, Planning, and Field Service -Seal exterior wall penetration -Complete roof downspout connections to underground drainage -Paint exterior gas piping against corrosion -Ground the light pole with the grounding electrode conductor first, then bond with other equipment grounding conductors -Grounding connection to rod shall be buried or covered in concrete. Cover exposed unprotected grounding electrode conductors as well -Secure LFNC raceway that encloses water service bonding jumper (below service enclosure) -Bond around the water service back flow valve -Walk-in cooler and freezer breakers maximum breaker size shall be 15 amp per labels -Provide protection from water entry at roof penetrations -Grease reservoir not installed at hood exhaust fan -Secure all roof top LFNC per code -Remove all construction debris off the rooftop
Alternate Protection Systems Inspection Passed 12/27/2019 12/27/2019
Occupancy Inspection - Fire Failed 12/27/2019 12/27/2019
Occupancy Inspection - Water Utilities Passed 12/27/2019 12/27/2019
Occupancy Inspection - Engineering Temporary C of O 12/27/2019 12/27/2019
Occupancy Inspection - Fire Passed 12/27/2019 12/27/2019
Occupancy Inspection - Codes Commercial Temporary C of O 12/30/2019 12/27/2019 12/27/2019
Misc
Corrective Action Required
12/27/2019
-5 piers on east side were not inspected. Have engineer approval submitted -Approval from the following departments required: Planning, and Field Service -Seal exterior wall penetration -Complete roof downspout connections to underground drainage -Paint exterior gas piping against corrosion -Ground the light pole with the grounding electrode conductor first, then bond with other equipment grounding conductors -Grounding connection to rod shall be buried or covered in concrete. Cover exposed unprotected grounding electrode conductors as well -Secure LFNC raceway that encloses water service bonding jumper (below service enclosure) -Bond around the water service back flow valve -Walk-in cooler and freezer breakers maximum breaker size shall be 15 amp per labels -Provide protection from water entry at roof penetrations -Grease reservoir not installed at hood exhaust fan -Secure all roof top LFNC per code -Remove all construction debris off the rooftop
Occupancy Inspection - Planning Temporary C of O 12/27/2019 12/30/2019
Corrective Action Required
12/30/2019
Landscaping needs to be installed per approved plan.
Corrective Action Required
12/30/2019
Trash enclosure doors need to be installed per approved plan.
Occupancy Inspection - Codes Commercial Temporary C of O 4/6/2020 4/6/2020 at 1:10 PM 04/06/2020
Misc
Corrective Action Required
12/27/2019
-Approval from the following departments required: Planning, and Field Service -Install sewer cleanout plugs for both sanitary and grease drain
Underground Electrical Inspection - Commercial Passed 05/01/2020
Misc
Resolved
12/27/2019
OK TO COVER WHEN READY: -TWO SETS OF SECONDARY 4" PVC CONDUIT FROM BUILDING TO TRANSFORMER; WEST SIDE LOW VOLTAGE CONDUITS AND EXT. LIGHTS CONDUITS FROM SW CORNER TO 5 LIGHT POLE PIERS ON WEST AND NORTH SIDES OF BUILDING; CONDUITS TO 2 EAST LP; SECONDARY FROM TRANSFORMER NEAR TACO BELL TO FUTURE COFFEE SHOP
Misc
Resolved
12/27/2019
-PROVIDE GROUNDING FOR LIGHT POLES -ONE PIER AT NORTH SIDE HAS LESS THAN 5 FT BURIAL DEPTH. HAVE ENGINEER ADDRESS
Occupancy Inspection - Planning Passed 06/05/2020
Occupancy Inspection - Codes Commercial Failed 6/5/2020 06/05/2020
Misc
Corrective Action Required
04/06/2020
Determine what will be done with the un-used water service.
Occupancy Inspection - Engineering Failed 06/05/2020
Miscellaneous Correction
Corrective Action Required
06/05/2020
Determine what will be done with the un-used water service.
Occupancy Inspection - Engineering Passed 07/01/2020
Occupancy Inspection - Codes Commercial Full C of O 07/01/2020
Misc
Resolved
07/01/2020
-Approval from the following departments required: Planning, and Field Service Mike Weisenborn 07/01/2020 11:56 AM - All outstanding items have been completed.
Documents & Images
Date Uploaded File Type Document Name
07/11/2019 Letter Fire Building Plan Review
07/16/2019 Letter DS P/R Corrections Document
08/20/2019 jxn county
09/24/2019 Receipt Receipt for transaction: 2019-006409
09/30/2019 Letter License Tax Bill
09/30/2019 Letter DS Building Permit
10/01/2019 Letter INSPECTION SUMMARY
10/16/2019 Letter INSPECTION SUMMARY
10/17/2019 Letter INSPECTION SUMMARY
10/17/2019 Letter INSPECTION SUMMARY
10/18/2019 Letter INSPECTION SUMMARY
10/23/2019 Letter INSPECTION SUMMARY
10/23/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/11/2019 Letter INSPECTION SUMMARY
11/13/2019 Letter INSPECTION SUMMARY
11/15/2019 Engineer Report/Study Taco Bell Plumbing Letter
11/15/2019 Letter INSPECTION SUMMARY
11/15/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter INSPECTION SUMMARY
11/20/2019 Letter Codes Plan Review Conditions
11/22/2019 Letter INSPECTION SUMMARY
11/22/2019 Letter INSPECTION SUMMARY
11/26/2019 Letter INSPECTION SUMMARY
11/27/2019 Letter INSPECTION SUMMARY
12/06/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/16/2019 Letter INSPECTION SUMMARY
12/17/2019 Letter INSPECTION SUMMARY
12/18/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/20/2019 Letter INSPECTION SUMMARY
12/23/2019 Receipt Receipt for transaction: 2019-007822
12/23/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
12/27/2019 sp insp letter
12/27/2019 Letter INSPECTION SUMMARY
12/27/2019 Letter Codes Temporary Certificate of Occupancy
12/30/2019 TB - WC Special Inspections Response 12.27.2019
04/06/2020 Letter Codes Temporary Certificate of Occupancy
04/08/2020 Receipt Receipt for transaction:2020-001439
06/05/2020 Letter INSPECTION SUMMARY
07/01/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home