Permit Application Status

PRCOM20191624


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20191624
Building Permit - Commercial
Final Completion
MARION RIDGE SAFETY STORAGE LLC
NEW SHELL BUILDING
SHELL FOR FUTURE OFFICE/WAREHOUSE
06/21/2019
09/11/2019
02/08/2020
04/05/2021
Locations
Contacts
WARD DEVELOPMENT & INVESTMENT CO, Address:1120 NW EAGLE RIDGE BLVD, Phone:(816) 229-8115  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
BLUE SPRINGS ELECTRICAL SERVICE, Address:3402 LAKE SHORE DR, Phone:(816) 224-9911  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
SBC ARCHITECTURE, Address:3009 ELMIRA CT, Phone:(816) 797-7115  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
KENT BILQUIST, Address:WARD DEVELOPMENT  
MARION RIDGE SAFETY STORAGE LLC, Address:1101 C NW PAMELA BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 02/20/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/20/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Sprinkler Plan Review Released for Construction 01/21/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
01/21/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test and a water flow test.
Miscellaneous Correction
Corrective Action Required
01/21/2020

(Action Required) Provide Horn/Strobe on exterior of building by FDC. Provide 2 Class 1 standpipes: One on each end of the shell building. More to possibly follow when tenants begin to fill in.
Final Development Plan Review Approved 09/10/2019
Joe Frogge
Licensed Contractors Approved 08/15/2019 08/15/2019
Joe Frogge
Building Plan Review Approved with Conditions 08/22/2019 08/15/2019
Joe Frogge
Final Development Plan
Resolved
09/10/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Bldg - Premises identification/address 501.2
Corrective Action Required
08/15/2019

Address not provided on application form. This building has been assigned the address of - 2701 NE Independence Avenue Action required: Comment is for informational purposes. Please update your records. 8/12/19 - per owner request, address has been changed to 2700 NE McBaine Dr
Miscellaneous Correction
Resolved
08/15/2019

Construction of sprinkler room incomplete. Action required: Provide complete construction details for sprinkler room. 8/12/19 - Design incomplete. How will walls be constructed? Height? Will there be a ceiling? Type and spacing of studs?
Fire Plan Review Approved with Conditions 08/22/2019 08/15/2019
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
08/15/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three stamped sets of shop drawings for the alarm system.
Address numbers required
Corrective Action Required
08/15/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/15/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com and mount by FDC.
Hydrant required
Corrective Action Required
08/15/2019

2018 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). (Action Required) Show a fire hydrant within 100 feet from the FDC. Also, show placement of FDC on building.
Construction documents - Fire protection systems
Corrective Action Required
08/15/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three stamped sets of shop drawings for the sprinkler system. Note: Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
08/15/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm/sprinkler testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/15/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified at Inspection)
Misc
Corrective Action Required
08/15/2019

(Informational Purposes) Provide intended use for this space. If high-pile storage see Chapter 32 in the IFC for code requirements.
Duct smoke detectors
Corrective Action Required
08/15/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) CFM over 2000 will be required to have duct detection.
Building Plan Review Rejected 08/15/2019 08/12/2019
Joe Frogge
Final Development Plan
Corrective Action Required
08/08/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Bldg - Premises identification/address 501.2
Corrective Action Required
08/08/2019

Address not provided on application form. This building has been assigned the address of - 2701 NE Independence Avenue Action required: Comment is for informational purposes. Please update your records. 8/12/19 - per owner request, address has benn changed to 2700 NE McBaine Dr
Miscellaneous Correction
Resolved
08/12/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Plan Submittal 2012 Codes
Resolved
08/12/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code reference on Sheet S000.
Miscellaneous Correction
Corrective Action Required
08/08/2019

Construction of sprinkler room incomplete. Action required: Provide complete construction details for sprinkler room. 8/12/19 - Design incomplete. How will walls be constructed? Height? Will there be a ceiling? Type and spacing of studs?
Plumb - Water hammer 604.9
Resolved
08/12/2019

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. (re: Pipe Material Schedule note #3 on MP201)
Miscellaneous Correction
Resolved
08/12/2019

Site lighting design incomplete. Action required: Provide complete site lighting design including circuitry and light pole base detail.
Plumb - Freezing 305.4
Resolved
08/12/2019

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide means of heating sprinkler room or other approved method to protect pipes from freezing.
Plumb - Cleanouts - Building sewer 708.3.2
Resolved
08/12/2019

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.1 Horizontal drains within buildings. Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet. Building drains shall have cleanouts located at intervals of not more than 100 feet apart except where manholes are used instead of cleanouts, the manholes hall be located at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, the end of the horizontal drain or the end of the building drain. (see code for exception) Action required: Provide cleanouts at maximum 100' intervals.
Licensed Contractors Approved 08/15/2019 08/11/2019
Joe Frogge
LC - MEP Subs
Resolved
08/11/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumber. (R-Z Plumbing not licensed)
Fire Plan Review Approved with Conditions 08/15/2019 08/10/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/08/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three stamped sets of shop drawings for the alarm system.
Address numbers required
Corrective Action Required
08/08/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
08/08/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com and mount by FDC.
Hydrant required
Corrective Action Required
08/08/2019

2018 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). (Action Required) Show a fire hydrant within 100 feet from the FDC. Also, show placement of FDC on building.
Construction documents - Fire protection systems
Corrective Action Required
08/08/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three stamped sets of shop drawings for the sprinkler system. Note: Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
08/08/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm/sprinkler testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/08/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified at Inspection)
Miscellaneous Correction
Resolved
08/10/2019

(Action Required) Provide access to building from Independence Ave. Doors should be no more than 100 lineal feet apart. Sprinkler Room access should be made off of Independence Ave.
Misc
Corrective Action Required
08/08/2019

(Informational Purposes) Provide intended use for this space. If high-pile storage see Chapter 32 in the IFC for code requirements.
Duct smoke detectors
Corrective Action Required
08/08/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) CFM over 2000 will be required to have duct detection.
Special Inspections Review Approved 07/24/2019
Joe Frogge
Building Plan Review Rejected 07/08/2019 07/03/2019
Joe Frogge
Final Development Plan
Corrective Action Required
07/03/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Bldg - Premises identification/address 501.2
Corrective Action Required
07/03/2019

Address not provided on application form. This building has been assigned the address of - 2701 NE Independence Avenue Action required: Comment is for informational purposes. Please update your records.
Miscellaneous Correction
Corrective Action Required
07/03/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Plan Submittal 2012 Codes
Corrective Action Required
07/03/2019

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code reference on Sheet S000.
Miscellaneous Correction
Resolved
07/24/2019

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
Miscellaneous Correction
Corrective Action Required
07/03/2019

Construction of sprinkler room incomplete. Action required: Provide complete construction details for sprinkler room.
Plumb - Water hammer 604.9
Corrective Action Required
07/03/2019

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. (re: Pipe Material Schedule note #3 on MP201)
Miscellaneous Correction
Corrective Action Required
07/03/2019

Site lighting design incomplete. Action required: Provide complete site lighting design including circuitry and light pole base detail.
Plumb - Freezing 305.4
Corrective Action Required
07/03/2019

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide means of heating sprinkler room or other approved method to protect pipes from freezing.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
07/03/2019

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.1 Horizontal drains within buildings. Horizontal drainage pipes in buildings shall have cleanouts located at intervals of not more than 100 feet. Building drains shall have cleanouts located at intervals of not more than 100 feet apart except where manholes are used instead of cleanouts, the manholes hall be located at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, the end of the horizontal drain or the end of the building drain. (see code for exception) Action required: Provide cleanouts at maximum 100' intervals.
Licensed Contractors Rejected 07/08/2019 07/03/2019
Joe Frogge
LC - General Contractor
Resolved
07/24/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. (Ward Dev. license has lapsed)
LC - MEP Subs
Corrective Action Required
07/03/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Plumber. (R-Z Plumbing not licensed)
Fire Plan Review Rejected 07/08/2019 06/25/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
06/25/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three stamped sets of shop drawings for the alarm system.
Address numbers required
Corrective Action Required
06/25/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
06/25/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox Box from knoxbox.com and mount by FDC.
Hydrant required
Corrective Action Required
06/25/2019

2018 IFC 508.5.1 -Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Exceptions: 1. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). (Action Required) Show a fire hydrant within 100 feet from the FDC. Also, show placement of FDC on building.
Construction documents - Fire protection systems
Corrective Action Required
06/25/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three stamped sets of shop drawings for the sprinkler system. Note: Class 1 standpipes to be installed.
Installation acceptance testing
Corrective Action Required
06/25/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm/sprinkler testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/25/2019

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified at Inspection)
Miscellaneous Correction
Corrective Action Required
06/25/2019

(Action Required) Provide access to building from Independence Ave. Doors should be no more than 100 lineal feet apart. Sprinkler Room access should be made off of Independence Ave.
Misc
Corrective Action Required
06/25/2019

(Action Required) Provide intended use for this space. If high-pile storage see Chapter 32 in the IFC for code requirements.
Duct smoke detectors
Corrective Action Required
06/25/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) CFM over 2000 will be required to have duct detection.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $13,844.00 $13,844.00 Paid 09/05/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 10/2/2019 at 11:15 AM 10/02/2019
Misc
Partial Correction
10/02/2019
-EAST AND SOUTH BUILDING DRAIN-OK
Underslab Plumbing Inspection - Commercial Partial 10/3/2019 10/3/2019 at 11:00 AM 10/03/2019
Misc
Partial Correction
10/02/2019
-EAST, WEST, AND SOUTH BUILDING DRAIN-OK
Underground Electrical Inspection - Commercial Partial 6/25/2020 6/25/2020 at 8:55 AM 06/25/2020
Misc
Partial Correction
06/25/2020
UNDERGROUND RACEWAYS TO LIGHT POLES-OK: UE FROM BUILDING TO NW AND SE LP;
Underground Electrical Inspection - Commercial Partial 7/6/2020 7/6/2020 at 1:00 PM 07/06/2020
Misc
Partial Correction
06/25/2020
-UNDERGROUND RACEWAYS TO LIGHT POLES-OK: UE FROM BUILDING TO NW AND SE LP; -UE FROM TRANSFORMER TO MDP OK
Footing Inspection - Commercial Partial 7/7/2020 (2:00) 7/7/2020 at 2:00 PM 07/07/2020
Informational
07/07/2020
RETAINING WALL FOOTING AT NORTH AND SOUTH DOCK AREAS-OK
Footing Inspection - Commercial Passed 7/14/2020 (8:00) 7/14/2020 at 10:00 AM 07/14/2020
Informational
07/14/2020
RETAINING WALL FOOTING AT NORTH AND SOUTH DOCK AREAS-OK
Electrical Service Inspection Passed 8/4/2020 8/4/2020 at 12:55 PM 08/04/2020
Informational
08/04/2020
OK TO RELEASE SERVICE METER FOR HOUSE AS WELL
Underground Electrical Inspection - Commercial Partial 8/5/2020 8/5/2020 08/05/2020
Misc
Partial Correction
07/06/2020
-UNDERGROUND RACEWAYS TO LIGHT POLES-OK: UE FROM BUILDING TO NW AND SE LP; UE TO NORTH LP -UE FROM TRANSFORMER TO MDP OK -LP PIERS-OK: 5 NORTH LP AND SE LP PIER
Sprinkler - Hydrostatic Test Passed 8/7/2020 08/07/2020
Rated Assembly Inspection Passed 8/28/2020 8/28/2020 08/28/2020
Informational
08/28/2020
FIRE SPRINKLER ROOM FIRE-RATED WALL AND CEILING-OK
Underslab Plumbing Inspection - Commercial Passed 09/02/2020
Misc
Resolved
09/02/2020
-EAST, WEST, AND SOUTH BUILDING DRAIN-OK
Underslab Electrical Inspection - Commercial Passed 10/2/2019 09/02/2020
Misc
Resolved
09/02/2020
Rough Electrical Inspection - Commercial Passed 9/2/2020 9/2/2020 at 9:50 AM 09/02/2020
Sprinkler - Flow Test Passed 9/15/2020 09/15/2020
Alarm Test Passed 9/15/2020 09/15/2020
Underground Electrical Inspection - Commercial Passed 09/17/2020
Misc
Resolved
09/17/2020
-UNDERGROUND RACEWAYS TO LIGHT POLES-OK: UE FROM BUILDING TO NW AND SE LP; UE TO NORTH LP -UE FROM TRANSFORMER TO MDP OK -LP PIERS-OK: 5 NORTH LP AND SE LP PIER
Occupancy Inspection - Fire Passed 9/17/2020 09/17/2020
Occupancy Inspection - Codes Commercial Temporary C of O 9/17/2020 9/17/2020 09/17/2020
Misc
Corrective Action Required
09/17/2020
-Approval required from: Water, Field Service, Fire, Planning -Submit Special Inspection report for building -Fire-caulk all penetrations of rated wall; fill gap at top with mineral wool; mud all screw holes -ID all gas service to each tenant -Seal exterior wall penetrations -Paint all exterior gas piping to protect against corrosion -Provide compliance with NEC 110.16 **LICENSE TAX WILL BE DEFERRED TO THE TENANT
Occupancy Inspection - Engineering Temporary C of O 09/18/2020
Miscellaneous Correction
Corrective Action Required
09/18/2020
Install vegetation.
Occupancy Inspection - Planning Temporary C of O 09/18/2020
Miscellaneous Correction
Corrective Action Required
09/18/2020
Install landscaping.
Miscellaneous Correction
Corrective Action Required
09/18/2020
Install trash enclosure gates.
Occupancy Inspection - Water Utilities Temporary C of O 09/18/2020
Miscellaneous Correction
Corrective Action Required
09/18/2020
Provide backflow certification for irrigation system.
Occupancy Inspection - Codes Commercial Temporary C of O 9/21/2020 9/21/2020 09/21/2020
Misc
Corrective Action Required
09/17/2020
-Approval required from: Water, Field Service, Fire, Planning
Occupancy Inspection - Water Utilities Passed 10/26/2020
Miscellaneous Correction
Corrective Action Required
09/18/2020
Provide backflow certification for irrigation system.
Gas Service Inspection - Commercial Passed 11/6/2020 11/6/2020 11/06/2020
Occupancy Inspection - Engineering Passed 02/10/2021
Occupancy Inspection - Planning Passed 03/25/2021
Miscellaneous Correction
Corrective Action Required
09/18/2020
Install landscaping.
Miscellaneous Correction
Corrective Action Required
09/18/2020
Install trash enclosure gates.
Occupancy Inspection - Codes Commercial Full C of O 4/5/2021 04/05/2021
Misc
Resolved
04/05/2021
-Provide compliance with NEC 110.16 **Need to install the arc-flash warning label.
Documents & Images
Date Uploaded File Type Document Name
06/25/2019 Letter Fire Building Plan Review
07/03/2019 Letter DS P/R Corrections Document
07/24/2019 IBC Update- 2700 NE Independence Ave A-OG 18-429E
08/10/2019 Letter Fire Building Plan Review
08/12/2019 Letter DS P/R Corrections Document
09/05/2019 Receipt Receipt for transaction: 2019-006060
09/10/2019 Letter License Tax Bill
09/11/2019 Letter DS Building Permit
10/02/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
01/21/2020 Letter Fire (Sprinkler) Plan Review
02/20/2020 Letter Fire (Alarm) Plan Review Notice
06/25/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
07/07/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
08/04/2020 Letter INSPECTION SUMMARY
08/05/2020 Letter Codes Plan Review Conditions
08/05/2020 Letter INSPECTION SUMMARY
08/18/2020 Engineer Report/Study I-470 Business Center Final SI Report.
08/28/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter Codes Temporary Certificate of Occupancy
09/17/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/18/2020 Engineer Report/Study I-470 Business Center Final SI Report_ (3)
09/21/2020 Letter Codes Temporary Certificate of Occupancy
11/06/2020 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter Codes Final Certificate of Occupancy
04/05/2021 Letter Field Certificate of Occupancy
04/05/2021 Letter INSPECTION SUMMARY
04/05/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home