Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
|
01/10/2020
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule alarm testing.
|
|
|
Licensed Contractors
|
Approved
|
07/22/2019
|
07/23/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
6/24/19 - acknowledged in letter. (Wiegmann is not licensed to work in LS.)
7/15/19 - (Wiegmann still not licensed to work in LS.)
|
|
|
Fire Plan Review
|
Approved with Conditions
|
07/22/2019
|
07/16/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action required)
Have the Fire Alarm contractor provide three sets of shop drawings of the system to be installed.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified at inspection)
Plans indicate address as 2816, permit shows address as 2801. Confirm correct address. Address needs to be readable from Independence Ave.
|
|
Knox box required
Corrective Action Required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
(Verified at inspection)
Order Knox Box from Knoxbox.com. Knox Box to be placed by FDC and exterior Horn/Strobe approximately five feet high from finished grade.
|
|
Construction documents - Fire protection systems
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action required)
Have Fire Sprinkler system installer provide three sets of shop drawings of the system being installed.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Action required) Information purposes
All field and acceptance testing of the fire sprinkler and fire alarm systems will be conducted before a final occupancy inspection. Contact the Fire Dept. to schedule testing. (816)969-1300.
|
|
Miscellaneous Correction
Code analysis
(Action Required)
Applicable codes should include 2018 IFC, IBC, Mechanical and Electrical codes.
|
|
Miscellaneous Correction
FDC Location
(Suggestion)
Possible cost savings on project. Utilize city hydrant located on Jones Industrial Drive on North end of building. Place FDC on North end of building out of the sprinkler room. By doing this no private hydrant will be needed and FDC underground will be eliminated.
|
|
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
(Action Required)
Elevator key boxes can be obtained through Knoxbox.com. Box to be mounted on the first floor next to elevator.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Verified At Inspection)
All duct detection to be wired into the Fire Alarm System.
|
|
Door operations
Corrective Action Required
2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
(Verified At Inspection)
|
|
|
Building Plan Review
|
Approved with Conditions
|
07/22/2019
|
07/15/2019
|
|
Joe Frogge
|
|
Miscellaneous Correction
2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80.
Action required: Provide 1hr rated doors at exit access stairways.
6/24/19 - doors still show a 45m rating. change to 1hour or provide detailed justification.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
NEC - Spaces about electrical equipment 110.26
2011 NEC 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure.
Action required: Door out of Elec. Rm 108 must swing outward in direction of egress and be equipped with panic hardware.
6/24/19 - door swing corrected but panic hardware is still required
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
|
06/30/2019
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Action Required)
Call (816)969-1300 to schedule testing. Testing to be completed before a final occupancy inspection.
|
|
Misc
Corrective Action Required
(Informational Purposes)
If no backflow is present between the hydrant and the riser, a check valve at the base of the riser will be required.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/28/2019
|
06/24/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action required)
Have the Fire Alarm contractor provide three sets of shop drawings of the system to be installed.
|
|
Hazardous material identification
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Action required)
Provide information on fuel being used for generator. Placarding may be required.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified at inspection)
Plans indicate address as 2816, permit shows address as 2801. Confirm correct address. Address needs to be readable from Independence Ave.
|
|
Knox box required
Corrective Action Required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
(Verified at inspection)
Order Knox Box from Knoxbox.com. Knox Box to be placed by FDC and exterior Horn/Strobe approximately five feet high from finished grade.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action required)
Have Fire Sprinkler system installer provide three sets of shop drawings of the system being installed.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Action required) Information purposes
All field and acceptance testing of the fire sprinkler and fire alarm systems will be conducted before a final occupancy inspection. Contact the Fire Dept. to schedule testing. (816)969-1300.
|
|
Miscellaneous Correction
(Fire Coating)
Action required
Provide manufacture specs on all fire coatings to be used on the building.
|
|
Miscellaneous Correction
Corrective Action Required
Code analysis
(Action Required)
Applicable codes should include 2018 IFC, IBC, Mechanical and Electrical codes.
|
|
Miscellaneous Correction
Corrective Action Required
FDC Location
(Suggestion)
Possible cost savings on project. Utilize city hydrant located on Jones Industrial Drive on North end of building. Place FDC on North end of building out of the sprinkler room. By doing this no private hydrant will be needed and FDC underground will be eliminated.
|
|
Miscellaneous Correction
Med Gas Lines
(Action Required)
Need to include med gas piping on plumbing plans
|
|
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
(Action Required)
Elevator key boxes can be obtained through Knoxbox.com. Box to be mounted on the first floor next to elevator.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Verified At Inspection)
All duct detection to be wired into the Fire Alarm System.
|
|
Panic and fire exit hardware
2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware.
(Action Required)
All marked exits will be required to have panic hardware.
|
|
Illumination required
2018 IFC 1008.1 Illumination required. The means of egress,
shall be illuminated at all times the building space served by the means of egress is occupied.
(Action required)
Electrical plans need to show exterior emergency lighting on the East side of building at each exit discharge.
|
|
Stairway identification signs
2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open and closed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
(Action Required)
Each floor level will be identified at each stairwell entrance, both sides of door.
|
|
Door operations
Corrective Action Required
2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
(Verified At Inspection)
|
|
|
Building Plan Review
|
Rejected
|
06/28/2019
|
06/24/2019
|
|
Joe Frogge
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Clarify square footage information. How are 1st and 2nd floors so similar when so much space on 2nd floor is open to above?
|
|
Miscellaneous Correction
Corrective Action Required
2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80.
Action required: Provide 1hr rated doors at exit access stairways.
6/24/19 - doors still show a 45m rating. change to 1hour or provide detailed justification.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is for informational purposes.
6/24/19 - acknowledged in letter.
|
|
Miscellaneous Correction
2012 IBC 1020.1 General. Exits shall comply with Sections 1020 through 1026 and the applicable requirements of Sections 1003 through 1013. An exit shall not be used for any purpose that interferes with its function as a means of egress. Once a given level of exit protection is achieved, such level of protection shall not be reduced until arrival at the exit discharge.
Action required: At stair #S100A - provide exit directly to exterior or other protected path to exterior.
6/24/19 - approved based on 1027.1 exception 1-1.3
|
|
Miscellaneous Correction
2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating.
Action required: Provide details on how ductwork shafts will be fire rated. Include information for top and bottom of shafts as well.
|
|
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
2011 NEC 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure.
Action required: Door out of Elec. Rm 108 must swing outward in direction of egress and be equipped with panic hardware.
6/24/19 - door swing corrected but panic hardware is still required
|
|
Bldg - Two exit or exit access doorways 1015.2.1
2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions)
Action required: 2 exits required from 2nd floor. Provide appropriate exit signage.
|
|
Miscellaneous Correction
2012 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-414) Storm water shall not be drained into sewers intended for sewage only. Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system.
Action required: Route sump pump discharge to approved location. (not sanitary)
|
|
|
Licensed Contractors
|
Rejected
|
06/24/2019
|
06/24/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
6/24/19 - acknowledged in letter. (Wiegmann is not licensed to work in LS.)
|
|
|
Building Plan Review
|
Rejected
|
05/24/2019
|
05/17/2019
|
|
Joe Frogge
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Clarify square footage information. How are 1st and 2nd floors so similar when so much space on 2nd floor is open to above?
|
|
Miscellaneous Correction
Corrective Action Required
2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80.
Action required: Provide 1hr rated doors at exit access stairways.
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is for informational purposes.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration.
Action required: Comment is for informational purposes.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is for informational purposes.
|
|
Miscellaneous Correction
Corrective Action Required
2012 IBC 1020.1 General. Exits shall comply with Sections 1020 through 1026 and the applicable requirements of Sections 1003 through 1013. An exit shall not be used for any purpose that interferes with its function as a means of egress. Once a given level of exit protection is achieved, such level of protection shall not be reduced until arrival at the exit discharge.
Action required: At stair #S100A - provide exit directly to exterior or other protected path to exterior.
|
|
Miscellaneous Correction
Corrective Action Required
2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating.
Action required: Provide details on how ductwork shafts will be fire rated. Include information for top and bottom of shafts as well.
|
|
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
2011 NEC 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure.
Action required: Door out of Elec. Rm 108 must swing outward in direction of egress and be equipped with panic hardware.
|
|
Bldg - Two exit or exit access doorways 1015.2.1
Corrective Action Required
2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions)
Action required: 2 exits required from 2nd floor. Provide appropriate exit signage.
|
|
Miscellaneous Correction
Corrective Action Required
2012 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-414) Storm water shall not be drained into sewers intended for sewage only. Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system.
Action required: Route sump pump discharge to approved location. (not sanitary)
|
|
|
Licensed Contractors
|
Rejected
|
|
05/17/2019
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
Fire Plan Review
|
Rejected
|
05/24/2019
|
05/14/2019
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Action required)
Have the Fire Alarm contractor provide three sets of shop drawings of the system to be installed.
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Action required)
Provide information on fuel being used for generator. Placarding may be required.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified at inspection)
Plans indicate address as 2816, permit shows address as 2801. Confirm correct address. Address needs to be readable from Independence Ave.
|
|
Knox box required
Corrective Action Required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
(Verified at inspection)
Order Knox Box from Knoxbox.com. Knox Box to be placed by FDC and exterior Horn/Strobe approximately five feet high from finished grade.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Action required)
Have Fire Sprinkler system installer provide three sets of shop drawings of the system being installed.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Action required) Information purposes
All field and acceptance testing of the fire sprinkler and fire alarm systems will be conducted before a final occupancy inspection. Contact the Fire Dept. to schedule testing. (816)969-1300.
|
|
Miscellaneous Correction
Corrective Action Required
(Fire Coating)
Action required
Provide manufacture specs on all fire coatings to be used on the building.
|
|
Miscellaneous Correction
Corrective Action Required
Code analysis
(Action Required)
Applicable codes should include 2018 IFC, IBC, Mechanical and Electrical codes.
|
|
Miscellaneous Correction
Corrective Action Required
FDC Location
(Suggestion)
Possible cost savings on project. Utilize city hydrant located on Jones Industrial Drive on North end of building. Place FDC on North end of building out of the sprinkler room. By doing this no private hydrant will be needed and FDC underground will be eliminated.
|
|
Miscellaneous Correction
Corrective Action Required
Med Gas Lines
(Action Required)
Need to include med gas piping on plumbing plans
|
|
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
(Action Required)
Elevator key boxes can be obtained through Knoxbox.com. Box to be mounted on the first floor next to elevator.
|
|
Duct smoke detectors
Corrective Action Required
2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection.
(Action Required)
All duct detection to be wired into the Fire Alarm System.
|
|
Panic and fire exit hardware
Corrective Action Required
2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware.
(Action Required)
All marked exits will be required to have panic hardware.
|
|
Illumination required
Corrective Action Required
2018 IFC 1008.1 Illumination required. The means of egress,
shall be illuminated at all times the building space served by the means of egress is occupied.
(Action required)
Electrical plans need to show exterior emergency lighting on the East side of building at each exit discharge.
|
|
Stairway identification signs
Corrective Action Required
2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open and closed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
(Action Required)
Each floor level will be identified at each stairwell entrance, both sides of door.
|
|
|
Final Development Plan Review
|
Approved
|
|
05/13/2019
|
|
Mike Weisenborn
|
|
|
Special Inspections Review
|
Approved
|
|
03/13/2019
|
|
Joe Frogge
|
|
|