Permit Application Status

PRCOM20183215


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20183215
Building Permit - Commercial
Certificate of Occupancy
OAK VIEW LEES SUMMIT LLC
NEW COMMERCIAL
CLIMATE CONTROLLED STORAGE FACILITY
09/21/2018
12/05/2019
03/26/2019
01/06/2021
Locations
Contacts
OAK VIEW LEES SUMMIT LLC, Address:201 HAWKS RIDGE TRL  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
ROBERT KELLY ARCHITECT, Address:201 S CALHOUN ST. SUITE 125, Phone:(817) 332-5014  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
CLAYCO ELECTRIC COMPANY, Address:319 E 11TH AVE, Phone:(816) 221-0593  
PLUMBING BY FISHER INC, Address:9875 KILL CREEK RD, Phone:(913) 583-1971  
OVERLAND PARK MECHANICAL CO LLC, Address:16088 FOSTER, Phone:(913) 814-8200  
  
Alan Gentry, Address:Prosser/Wilbert Construction, Phone:(913) 208-3865  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/22/2020
Michael Weissenbach
Misc
Corrective Action Required
06/22/2020

(Informational Purposes) Update your records showing NFPA 13 2016 Edition
Alarm Plan Review Released for Construction 02/12/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
02/12/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule alarm testing.
Miscellaneous Correction
Corrective Action Required
02/12/2020

(ACTION REQUIRED) 2018 IFC 907.2 Add one manual pull station by front door.
Licensed Contractors Approved 03/11/2019 12/05/2019
Joe Frogge
LC - MEP Subs
Resolved
12/05/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/11/19 - acknowledged in letter
Special Inspections Review Approved 11/20/2019
Joe Frogge
Final Development Plan Review Approved 10/24/2019
Joe Frogge
Building Plan Review Approved with Conditions 03/11/2019 03/11/2019
Joe Frogge
Final Development Plan
Resolved
10/24/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 3/11/19 - acknowledged in letter
Misc
Resolved
11/20/2019

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
03/04/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 3/11/19 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
03/04/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 3/11/19 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
03/04/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 3/11/19 - acknowledged in letter
Bldg - Floor elevation 1008.1.5
Resolved
03/11/2019

2012 IBC 1008.1.5 - Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope). See code section for possible exceptions. Action required: Provide a landing at exterior of doors 110A & 112.
NEC - Spaces about electrical equipment 110.26
Resolved
03/11/2019

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Modify design to show that door #104 at first floor Elec Room will swing outwards and be equipped with panic hardware or other approved hardware listed above.
Accessibility - Vertical clearance 307.4
Resolved
03/11/2019

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met under stair flights.
Bldg - Types I and II construction allowable materials 602.2
Resolved
03/11/2019

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify fire-retardant-treated plywood and wood backing inside parapet walls.
Accessibility - Fixed sidewall grab bars 604.5.1
Resolved
03/11/2019

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Modify design to provide vertical sidewall grab bars at toilets.
Misc
Corrective Action Required
03/04/2019

Placement and spacing of pre-manufactured storage units are not to infringe upon any egress or accessibility regulations. Action required: Comment is for informational purposes. To be field verified.
Mech - Duct detectors - Return air systems 606.2.1
Resolved
03/11/2019

2012 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide smoke detectors at relevant air handlers.
Misc
Resolved
03/11/2019

Light pole base detail not provided. (4/E4.1 references Structural but it doesn't appear to be included) Action required: Provide light pole base detail.
Misc
Resolved
03/11/2019

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: Provide details for wall and membrane penetration through or into fire rated assemblies.
Fire Plan Review Approved with Conditions 03/11/2019 03/06/2019
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
03/04/2019

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
03/04/2019

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Addressing shall be readable from the addressed roadway (Douglas St.)
Knox box required
Corrective Action Required
03/04/2019

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. ACTION REQUIRED:(verified at inspection) Provide a knox box for access to the building and fire sprinkler room Provide a knox box for the elevator keys. Knox box can be obtained online at knoxbox.com the knox box shall be mounted on a exterior wall over the FDC approx 5'- 6' off finish grade. ACTION REQUIRED: Provide a knox box for the elevator keys. Knox box can be obtained online at knoxbox.com 607.4 Elevator key location. Keys for the elevator car doors and fire-fighter service keys shall be kept in an approved location for immediate use by the fire department. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. The key box shall be mounted 5 feet -6 feet above the finished floor to the right side of the elevator bank. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official.
Construction documents - Fire protection systems
Corrective Action Required
03/04/2019

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler and the class-1 standpipe system to be installed.
Installation acceptance testing
Corrective Action Required
03/04/2019

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptance testing will be required of the fire sprinkler and fire alarm systems prior to the final occupancy inspection. To schedule testing contact the fire department. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/04/2019

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (Verified at inspection) Provide 2A-10BC fire extinguishers on each level. One extinguisher for evry 3,000 square feet of useable space. Placement shall be so there is a maximum travel distance of 75' to reach a extinguisher.
Misc
Corrective Action Required
03/04/2019

Class-1 standpipe system ACTION REQUIRED:(verified with sprinkler plan review) Provide a Class-1 standpipe system within the stairways that complies with the requirments of IFC 905.4 (note) no hose cabinets to be installed for a class-1 standpipe system.
Misc
Corrective Action Required
03/04/2019

duct detection ACTION REQUIRED: (verified at inspection) All AHU's that produce over 2,000 CFM will required duct detection installed and monitored by the buildings fire alarm system. IFC sections 907.2.13.1.2 and 907.3.1
Misc
Corrective Action Required
03/04/2019

Stairway levels ACTION REQUIRED:(verified at inspection) Provide floor level desigantion labeling on each side of each stairway door on all levels Signage shall comply with IFC 1022.9 Stairway identification signs.
Fire Plan Review Rejected 10/05/2018 09/27/2018
Joe Dir
Construction documents for fire alarm systems
Corrective Action Required
09/27/2018

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (information purposes) Have the fire alarm system contractor provide shop drawings of the fire alarm system to be installed.
Address numbers required
Corrective Action Required
09/27/2018

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (verified at inspection) Addressing shall be readable from the addressed roadway (Douglas St.)
Knox box required
Corrective Action Required
09/27/2018

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. ACTION REQUIRED:Provide a knox box for access to the building and fire sprinkler room Provide a knox box for the elevator keys. Knox box can be obtained online at knoxbox.com the knox box shall be mounted on a exterior wall over the FDC approx 5'- 6' off finish grade. ACTION REQUIRED: Provide a knox box for the elevator keys. Knox box can be obtained online at knoxbox.com 607.4 Elevator key location. Keys for the elevator car doors and fire-fighter service keys shall be kept in an approved location for immediate use by the fire department. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. The key box shall be mounted 5 feet -6 feet above the finished floor to the right side of the elevator bank. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official.
Construction documents - Fire protection systems
Corrective Action Required
09/27/2018

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (information purposes) Have the fire sprinkler system contractor provide shop drawings of the fire sprinkler and the class-1 standpipe system to be installed.
Installation acceptance testing
Corrective Action Required
09/27/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: (information purposes) Field tests and acceptance testing will be required of the fire sprinkler and fire alarm systems prior to the final occupancy inspection. To schedule testing contact the fire department. (816)969-1300
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/27/2018

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: (Verified at inspection) Provide 2A-10BC fire extinguishers on each level. One extinguisher for evry 3,000 square feet of useable space. Placement shall be so there is a maximum travel distance of 75' to reach a extinguisher.
Misc
Corrective Action Required
09/27/2018

Class-1 standpipe system ACTION REQUIRED: Provide a Class-1 standpipe system within the stairways that complies with the requirments of IFC 905.4 (note) no hose cabinets to be installed for a class-1 standpipe system.
Misc
Corrective Action Required
09/27/2018

duct detection ACTION REQUIRED: All AHU's that produce over 2,000 CFM will required duct detection installed and monitored by the buildings fire alarm system. IFC sections 907.2.13.1.2 and 907.3.1
Misc
Corrective Action Required
09/27/2018

Stairway levels ACTION REQUIRED: Provide floor level desigantion labeling on each side of each stairway door on all levels Signage shall comply with IFC 1022.9 Stairway identification signs.
Building Plan Review Rejected 10/05/2018 09/26/2018
Joe Frogge
Final Development Plan
Corrective Action Required
09/26/2018

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
09/26/2018

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
09/26/2018

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
09/26/2018

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
09/26/2018

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Bldg - Floor elevation 1008.1.5
Corrective Action Required
09/26/2018

2012 IBC 1008.1.5 - Floor elevation. There shall be a floor or landing on each side of a door. Such floor or landing shall be at the same elevation on each side of the door. Landings shall be level except for exterior landings, which are permitted to have a slope not to exceed 0.25 unit vertical in 12 units horizontal (2-percent slope). See code section for possible exceptions. Action required: Provide a landing at exterior of doors 110A & 112.
NEC - Spaces about electrical equipment 110.26
Corrective Action Required
09/26/2018

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: Modify design to show that door #104 at first floor Elec Room will swing outwards and be equipped with panic hardware or other approved hardware listed above.
Accessibility - Vertical clearance 307.4
Corrective Action Required
09/26/2018

ICC A117.1-2009 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. Action required: Modify documents to demonstrate how this requirement will be met under stair flights.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
09/26/2018

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Specify fire-retardant-treated plywood and wood backing inside parapet walls.
Accessibility - Fixed sidewall grab bars 604.5.1
Corrective Action Required
09/26/2018

ICC A117.1-2009 604.5.1 – Fixed side wall grab bars. Fixed side-wall grab bars shall be 42 inches minimum in length, located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. In addition, a vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Modify design to provide vertical sidewall grab bars at toilets.
Misc
Corrective Action Required
09/26/2018

Placement and spacing of pre-manufactured storage units are not to infringe upon any egress or accessibility regulations. Action required: Comment is for informational purposes. To be field verified.
Mech - Duct detectors - Return air systems 606.2.1
Corrective Action Required
09/26/2018

2012 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide smoke detectors at relevant air handlers.
Misc
Corrective Action Required
09/26/2018

Light pole base detail not provided. (4/E4.1 references Structural but it doesn't appear to be included) Action required: Provide light pole base detail.
Misc
Corrective Action Required
09/26/2018

2012 IBC 703.2 Fire-resistance ratings. The fire-resistance rating of building elements, components or assemblies shall be determined in accordance with the test procedures set forth in ASTM E 119 or UL 263 or in accordance with Section 703.3. Where materials, systems or devices that have not been tested as part of a fire-resistance-rated assembly are incorporated into the building element, component or assembly, sufficient data shall be made available to the building official to show that the required fire-resistance rating is not reduced. Materials and methods of construction used to protect joints and penetrations in fire resistance-rated building elements, components or assemblies shall not reduce the required fire-resistance rating. Action required: Provide details for wall and membrane penetration through or into fire rated assemblies.
Licensed Contractors Rejected 10/05/2018 09/26/2018
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/26/2018

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $24,000.00 $24,000.00 Paid 12/05/2019
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/05/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/05/2019
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Electrical Service Inspection Failed 2/19/2020 2/19/2020 at 7:40 AM 02/19/2020
Misc
Corrective Action Required
02/19/2020
G.E.C.s NOT TERMINATED TO GROUND ROD. IN-USE COVERS REQUIRED AT RECEPTACLES.
Electrical Service Inspection Partial 2/20/2020 2/20/2020 at 11:20 AM 02/20/2020
Misc
Partial Correction
02/20/2020
RELEASE METER FOR TEMPORARY SERVICE. NOTE: METER BOARD IS ADDRESSED "1410".
Underground Electrical Inspection - Commercial Partial 2/20/2020 2/20/2020 at 2:35 PM 02/20/2020
Misc
Partial Correction
02/20/2020
OK TO COVER WHEN READY SEVEN 3" SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO ~30' FROM BUILDING ENTRY.
Footing Inspection - Commercial Partial 3/3/2020 3/3/2020 at 2:00 PM 03/03/2020
Misc
Partial Correction
03/03/2020
OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4;
Footing Inspection - Commercial Partial 3/4/2020 (2:00) 3/4/2020 at 2:35 PM 03/04/2020
Misc
Partial Correction
03/03/2020
OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4;
Footing Inspection - Commercial Partial 3/12/2020 3/12/2020 03/12/2020
Misc
Partial Correction
03/04/2020
PERIMETER FOOTING : 5 LINE B-E; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4;
Footing Inspection - Commercial Partial 3/13/2020 (2:00) 3/13/2020 03/13/2020
Misc
Partial Correction
03/12/2020
PERIMETER FOOTING : 5 LINE B-E; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 Perimeter footing line 5 E-L
Footing Inspection - Commercial Partial 3/26/2020 (2:00) 3/26/2020 at 2:05 PM 03/26/2020
Misc
Partial Correction
03/13/2020
PERIMETER FOOTING : 5 LINE B-E; LINE 5 E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1 OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ;
Footing Inspection - Commercial Partial 3/30/2020 (2:00) 3/30/2020 03/30/2020
Misc
Partial Correction
03/26/2020
PERIMETER FOOTING : 5 LINE B-E; LINE 5 E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1 OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; Ok to pour footings Line 1 A-C, G 4-2.3
Footing Inspection - Commercial Partial 3/31/2020 (2:00) 3/31/2020 03/31/2020
Misc
Partial Correction
03/30/2020
PERIMETER FOOTING : 5 LINE B-E; LINE 5 E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1 OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; - Ok to pour footings Line 1 A-C, G 4-2.3 - 3/31/20 OK to pour Line 1 F to H , (2) drilled piers @ Line 1 E & D -
Footing Inspection - Commercial Partial 4/1/2020 (1:00) 4/1/2020 at 2:20 PM 04/01/2020
Misc
Partial Correction
03/31/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20 EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
Footing Inspection - Commercial Partial 4/2/2020 (2:00) 4/2/2020 04/02/2020
Misc
Partial Correction
04/01/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; A 4-5 1 LINE; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20;K1 J-H;J1-2.2; J-K 2.2-3.2; EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
Footing Inspection - Commercial Partial 4/7/2020 (2:00) 4/7/2020 04/07/2020
Misc
Partial Correction
04/02/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; A 4-5 1 LINE; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20;K1 J-H;J1-2.2; J-K 2.2-3.2; EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
ELEVATOR 1
Corrective Action Required
04/07/2020
base footing
Footing Inspection - Commercial Partial 4/8/2020 (2:00) 4/8/2020 04/08/2020
Misc
Partial Correction
04/07/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; A 4-5 1 LINE; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20;K1 J-H;J1-2.2; J-K 2.2-3.2; 4/8/20 LINE L 3.2 TO 4.5 SW END EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
ELEVATOR 1
Corrective Action Required
04/07/2020
base footing
Footing Inspection - Commercial Partial 4/9/2020 (1:00) 4/9/2020 04/09/2020
Misc
Partial Correction
04/08/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; A 4-5 1 LINE; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20;K1 J-H;J1-2.2; J-K 2.2-3.2; 4/8/20 LINE L 3.2 TO 4.5 SW END EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
ELEVATOR 1
Corrective Action Required
04/08/2020
ELEVATOR BASE FOOTING,ELEVATOR WALLS BELOW GRADE
Underslab Plumbing Inspection - Commercial Partial 4/8/2020 4/9/2020 04/09/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/09/2020
6" TO CENTER LINE, SOUTH TO 3", 6" WEST TO 4", TO BATH GROUP STUB UP.
Underslab Plumbing Inspection - Commercial Partial 4/15/2020 4/15/2020 04/15/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/09/2020
DWV > all complete except sump pump to north end.
Underslab Plumbing Inspection - Commercial Partial 4/16/2020 04/16/2020
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
04/16/2020
PENDING COMPLETION OF SUMP DRAIN
Underslab Electrical Inspection - Commercial Partial 4/17/2020 at 12:00 AM 04/17/2020
Misc
Corrective Action Required
04/17/2020
From CT on north wall to MDP interior.
Underground Electrical Inspection - Commercial Partial 5/11/2020 5/11/2020 05/11/2020
Misc
Partial Correction
02/20/2020
OK TO COVER WHEN READY SEVEN 3" SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO ~30' FROM BUILDING ENTRY. TEMP - CONDUIT TO TEMP METER LOCATION
Electrical Service Inspection Passed 5/20/2020 5/20/2020 05/20/2020
Misc
Partial Correction
02/20/2020
RELEASE METER FOR TEMPORARY SERVICE. NOTE: METER BOARD IS ADDRESSED "1410".
Rough Framing Inspection - Commercial Partial 7/1/2020 07/01/2020
FIRST FLOOR
Corrective Action Required
07/01/2020
EXTERIOR WALLS: 1 LINE A-L;5 LINE A-L;K.5;J 1-2.3;A 1-2.3; STILL PENDING 1ST FLOOR: B 2.3-4,A 4-5
SECOND FLOOR
Corrective Action Required
07/01/2020
THIRD FLOOR
Corrective Action Required
07/01/2020
All Rough Inspection - Commercial Partial 8/7/2020 8/7/2020 08/07/2020
SECOND FLOOR
Informational
08/07/2020
- 2ND FLOOR EXTERIOR METAL STUDS -
THIRD FLOOR
Informational
08/07/2020
- 3RD FLOOR EXTERIOR METAL STUDS -
All Rough Inspection - Commercial Partial 8/14/2020 8/14/2020 08/14/2020
SECOND FLOOR
Informational
08/07/2020
- 2ND FLOOR EXTERIOR METAL STUDS -
THIRD FLOOR
Informational
08/07/2020
- 3RD FLOOR EXTERIOR METAL STUDS -
FIRST FLOOR
Informational
08/14/2020
- METAL STUD FRAMING, PLUMBING & ELECTRIC, RESTROOMS, OFFICES, FIRE RISER ROOM, STAIRWAYS - - PRESSURE STEADY @ 5 PSI -
Above Ceiling Inspection Partial 8/21/2020 8/21/2020 08/21/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
08/21/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS -
Electrical Service Inspection Passed 8/26/2020 8/26/2020 08/26/2020
Rated Assembly Inspection Partial 8/26/2020 8/26/2020 08/28/2020
ELEVATOR 1
Corrective Action Required
08/28/2020
ELEVATOR SHAFT: 3rd fl- SHAFT SIDE inner side screw pattern ok
STAIR TOWER 1
Corrective Action Required
08/28/2020
EAST STAIR ENCLOSURE:
STAIR TOWER 2
Corrective Action Required
08/28/2020
SOUTH STAIR ENCLOSURE:
Underground Plumbing Inspection - Commercial Passed 8/28/2020 8/28/2020 08/28/2020
Rated Assembly Inspection Not Ready 8/28/2020 08/28/2020
ELEVATOR 1
Corrective Action Required
08/28/2020
ELEVATOR SHAFT: 3rd fl- SHAFT SIDE inner side screw pattern ok
STAIR TOWER 1
Corrective Action Required
08/28/2020
EAST STAIR ENCLOSURE:
STAIR TOWER 2
Corrective Action Required
08/28/2020
SOUTH STAIR ENCLOSURE:
Rated Assembly Inspection Partial 8/31/2020 8/31/2020 at 9:00 AM 08/31/2020
ELEVATOR 1
Corrective Action Required
08/28/2020
ELEVATOR SHAFT: 1ST TO 3rd fl- SHAFT SIDE SCREW PATTERN OK
STAIR TOWER 1
Corrective Action Required
08/28/2020
EAST STAIR ENCLOSURE:
STAIR TOWER 2
Corrective Action Required
08/28/2020
SOUTH STAIR ENCLOSURE:
Above Ceiling Inspection Partial 9/3/2020 09/03/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
08/21/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
All Rough Inspection - Commercial Partial 9/3/2020 9/3/2020 09/03/2020
SECOND FLOOR
Informational
08/14/2020
- 2ND FLOOR EXTERIOR METAL STUDS -
THIRD FLOOR
Informational
08/14/2020
- 3RD FLOOR EXTERIOR METAL STUDS - - RESTROOMS & JANITOR CLOSET METAL STUDS, MEP -
FIRST FLOOR
Informational
08/14/2020
- METAL STUD FRAMING, PLUMBING & ELECTRIC, RESTROOMS, OFFICES, FIRE RISER ROOM, STAIRWAYS - - PRESSURE STEADY @ 5 PSI -
Rated Assembly Inspection Partial 9/4/2020 9/4/2020 09/04/2020
ELEVATOR 1
Corrective Action Required
08/31/2020
ELEVATOR SHAFT: 1ST TO 3rd fl- SHAFT SIDE SCREW PATTERN OK - 1ST TO 3RD BACKSIDE SCREW PATTERN OK -
STAIR TOWER 1
Corrective Action Required
08/31/2020
EAST STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK -
STAIR TOWER 2
Corrective Action Required
08/31/2020
SOUTH STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK -
STAIR TOWER 3
Corrective Action Required
09/04/2020
- BACKSIDE SCREW PATTERN 1ST & 2ND FLOORS OK -
Rated Assembly Inspection Partial 9/9/2020 9/9/2020 09/09/2020
ELEVATOR 1
Corrective Action Required
09/04/2020
ELEVATOR SHAFT: 1ST TO 3rd fl- SHAFT SIDE SCREW PATTERN OK - 1ST TO 3RD BACKSIDE SCREW PATTERN OK -
STAIR TOWER 1
Corrective Action Required
09/04/2020
EAST STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK - - BACKSIDE SCREW PATTERN 3RD FLOOR OK -
STAIR TOWER 2
Corrective Action Required
09/04/2020
SOUTH STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK - - BACKSIDE SCREW PATTERN 3RD FLOOR OK -
STAIR TOWER 3
Corrective Action Required
09/04/2020
- BACKSIDE SCREW PATTERN 1ST & 2ND FLOORS OK - - BACKSIDE SCRFW PATTERN 3RD FLOOR OK -
Above Ceiling Inspection Partial 9/18/2020 9/18/2020 09/18/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
09/03/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
FIRST FLOOR
Corrective Action Required
09/18/2020
ABOVE CEILING MAIN STAORAGE AREA BEFORE UNITS ARE INSTALLED.
Above Ceiling Inspection Partial 10/5/2020 10/5/2020 10/05/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
09/18/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
FIRST FLOOR
Corrective Action Required
09/18/2020
ABOVE CEILING MAIN STAORAGE AREA BEFORE UNITS ARE INSTALLED.
SECOND FLOOR
Corrective Action Required
10/05/2020
- ABOVE CEILING MAIN STORAGE AREA BEFORE UNITS INSTALLED -
Above Ceiling Inspection Partial 10/7/2020 10/7/2020 10/07/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
10/05/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
FIRST FLOOR
Corrective Action Required
10/05/2020
ABOVE CEILING MAIN STAORAGE AREA BEFORE UNITS ARE INSTALLED. -ABOVE CEILING FOR BREAK ROOM AND OFFICE
SECOND FLOOR
Corrective Action Required
10/05/2020
- ABOVE CEILING MAIN STORAGE AREA BEFORE UNITS INSTALLED -
Sprinkler - Hydrostatic Test Failed 10/8/2020 10/08/2020
Sprinkler - Hydrostatic Test Passed 10/15/2020 10/15/2020
Above Ceiling Inspection Partial 11/6/2020 11/6/2020 11/06/2020
THE FOLLOWING AREAS ARE APPROVED
Informational
10/07/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
FIRST FLOOR
Informational
11/06/2020
ABOVE CEILING MAIN STAORAGE AREA BEFORE UNITS ARE INSTALLED. -ABOVE CEILING FOR BREAK ROOM AND OFFICE - - ABOVE CEILING LOADING DOCK/ ENTRY -
SECOND FLOOR
Informational
11/06/2020
- ABOVE CEILING MAIN STORAGE AREA BEFORE UNITS INSTALLED -
THIRD FLOOR
Corrective Action Required
11/06/2020
- ABOVE CEILING 3RD FLOOR BEFORE UNITS ARE INSTALLED -
Alarm Test Passed 12/14/2020 12/14/2020
Sprinkler - Flow Test Passed 12/14/2020 12/14/2020
Underslab Electrical Inspection - Commercial Passed 12/29/2020
Misc
Corrective Action Required
04/17/2020
From CT on north wall to MDP interior.
Footing Inspection - Commercial Passed 12/29/2020
Misc
Resolved
12/29/2020
PERIMETER FOOTING : LINE 5/B-E; LINE 5/E-L; LINE 2.3/A-B; LINE 4/A-B; LINE A/1.1 TO 4.1; A 4-5 1 LINE; LINE 1/A TO C; LINE 1/F to H; NEED CLARIFIFICATION ==>LINE G 4-2.3 - 3/31/20;K1 J-H;J1-2.2; J-K 2.2-3.2; 4/8/20 LINE L 3.2 TO 4.5 SW END EXTERIOR GB PIER BASES: LINE 2.2/J, K, AND K.5; LINE 1/H.6 AND J; J/1.4; LINE A/4.7 AND 5; LINE 1/E & D; OK TO POUR WHEN READY ISOLATED COLUMN FOOTINGS AT LOCATIONS: B/2; B/3; B/4; C/2; C/4; D/2; D/3; D/4; E/2; E/3; E/4; F/2; F/3; F/4; G/2; G/3; G/4; H/2; H/3; H/4; J/3; J/4; K/3; K/4; 3/13/20 ; ***GUYS-PUT EXTERIOR GRADE BEAM ON THE FIRST SECTION; EXTERIOR GB PIER BASES ON THE 2ND SECTION, AND ALL INTERIOR COLUMN BASES ON THE 3RD SECTION
ELEVATOR 1
Resolved
12/29/2020
ELEVATOR BASE FOOTING,ELEVATOR WALLS BELOW GRADE
Rough Framing Inspection - Commercial Passed 12/29/2020
FIRST FLOOR
Resolved
12/29/2020
EXTERIOR WALLS: 1 LINE A-L;5 LINE A-L;K.5;J 1-2.3;A 1-2.3; STILL PENDING 1ST FLOOR: B 2.3-4,A 4-5
SECOND FLOOR
Resolved
12/29/2020
THIRD FLOOR
Resolved
12/29/2020
Above Ceiling Inspection Passed 12/29/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
12/29/2020
- FIRST FLOOR RESTROOMS & JANITOR ROOMS - - THIRD FLOOR RESTROOMS & JANITOR CLOSET -
FIRST FLOOR
Resolved
12/29/2020
ABOVE CEILING MAIN STAORAGE AREA BEFORE UNITS ARE INSTALLED. -ABOVE CEILING FOR BREAK ROOM AND OFFICE - - ABOVE CEILING LOADING DOCK/ ENTRY -
SECOND FLOOR
Resolved
12/29/2020
- ABOVE CEILING MAIN STORAGE AREA BEFORE UNITS INSTALLED -
THIRD FLOOR
Resolved
12/29/2020
- ABOVE CEILING 3RD FLOOR BEFORE UNITS ARE INSTALLED -
All Rough Inspection - Commercial Passed 12/29/2020
SECOND FLOOR
Resolved
12/29/2020
- 2ND FLOOR EXTERIOR METAL STUDS -
THIRD FLOOR
Resolved
12/29/2020
- 3RD FLOOR EXTERIOR METAL STUDS - - RESTROOMS & JANITOR CLOSET METAL STUDS, MEP -
FIRST FLOOR
Resolved
12/29/2020
- METAL STUD FRAMING, PLUMBING & ELECTRIC, RESTROOMS, OFFICES, FIRE RISER ROOM, STAIRWAYS - - PRESSURE STEADY @ 5 PSI -
Rated Assembly Inspection Passed 12/29/2020
ELEVATOR 1
Resolved
12/29/2020
ELEVATOR SHAFT: 1ST TO 3rd fl- SHAFT SIDE SCREW PATTERN OK - 1ST TO 3RD BACKSIDE SCREW PATTERN OK -
STAIR TOWER 1
Resolved
12/29/2020
EAST STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK - - BACKSIDE SCREW PATTERN 3RD FLOOR OK -
STAIR TOWER 2
Resolved
12/29/2020
SOUTH STAIR ENCLOSURE: - BACKSIDE SCREW PATTERN 1ST & 2ND FLOOR OK - - BACKSIDE SCREW PATTERN 3RD FLOOR OK -
STAIR TOWER 3
Resolved
12/29/2020
- BACKSIDE SCREW PATTERN 1ST & 2ND FLOORS OK - - BACKSIDE SCRFW PATTERN 3RD FLOOR OK -
Underground Electrical Inspection - Commercial Passed 12/29/2020
Misc
Resolved
12/29/2020
OK TO COVER WHEN READY SEVEN 3" SECONDARY SERVICE CONDUITS FROM TRANSFORMER LOCATION TO ~30' FROM BUILDING ENTRY. TEMP - CONDUIT TO TEMP METER LOCATION
Underslab Plumbing Inspection - Commercial Passed 12/29/2020
THE FOLLOWING AREAS ARE APPROVED
Resolved
12/29/2020
PENDING COMPLETION OF SUMP DRAIN
Occupancy Inspection - Codes Commercial Failed 12/29/2020 12/29/2020 12/29/2020
Misc
Corrective Action Required
12/29/2020
- PROVIDE ELEVATOR CERTIFICATE - - PROVIDE FINAL REPORT 3RD PARTY INSPECTIONS - - PROVIDE BACKFLOW CERTIFICATION -
Occupancy Inspection - Fire Failed 12/29/2020 12/29/2020 12/29/2020
Occupancy Inspection - Engineering Passed 12/29/2020 12/29/2020
Occupancy Inspection - Planning Passed 12/29/2020 12/29/2020
Occupancy Inspection - Water Utilities Passed 12/29/2020 12/30/2020
Occupancy Inspection - Fire Passed 1/6/2021 01/06/2021
Occupancy Inspection - Codes Commercial Full C of O 01/06/2021
Misc
Corrective Action Required
12/29/2020
- PROVIDE ELEVATOR CERTIFICATE - - PROVIDE FINAL REPORT 3RD PARTY INSPECTIONS - - PROVIDE BACKFLOW CERTIFICATION -
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home